Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Controlled-Yielding Rock Bolt - Objective
To allow the controlled yielding of mine walls in order to reduce rock-burst hazards and reduce maintenance caused by excessive squeezing forces. Approach Rock bolts that elongate and continue
Jan 1, 1977
-
OFR-162-77 Design Of A Quiet Rock Drill - A Feasibility Study Using Principles Of Leavell Pavement Breaker
By Floyd R. Anderson
Noise control of existing pneumatic drills is difficult and runs into cost, performance and weight penalties. A need exists for a start-from-scratch approach for quiet pneumatic rock drills. The desig
Jan 1, 1977
-
OFR-49(2)-79 Construction, Inspection And Maintenance Of Mine Haulage Track, Volume 2 - Guidelines
By Edward G. Cunney
Track in underground bituminous coal mines was investigated, and technology was taken from other industries in order to obtain information on conditions that impair the safety and efficiency of the tr
Jan 1, 1977
-
OFR-99-78 Design, Development And Field Test Results Of Overturn Stability Indicators And Obstacle Detectors For Front End Loaders
By Gilbert A. Wray
This report presents the results of a study of the overturning Stability of Front End Loaders and the development of an Obstacle Detector to warn of Obstacles in the blind regions of the vehicle. The
Jan 1, 1977
-
Statistical Summary (949586b6-b8da-4f98-ad25-eb0908adb9c2)
This chapter summarizes data on crude mineral production for the United States, its island possessions, and the Commonwealth of Puerto Rico. Included also are tables that show the principal mineral co
Jan 1, 1977
-
RI 8260 Effects of Hydraulic Stimulation on Coalbeds and Associated Strata (db096436-ec70-4f3f-a48a-5fe601799618)
By Curtis H. Elder
In studies conducted by the Bureau of Mines, two test areas were hydraulically stimulated and exposed by mining: One in the Pittsburgh coalbed at the Vesta No. 5 mine, Washington County, Pa.; and one
Jan 1, 1977
-
IC 8760 Anthracite In The Narragansett Basin Of Rhode Island And Massachusetts
By William R. Barton
Anthracite has been mined from the Narragansett Basin of Rode Island and Massachusetts sporadically, and with limited success, for more than 170 years. Beginning in 1974, interest in the coal of the B
Jan 1, 1977
-
OFR-84-77 Improved Truck Driver Alertness Technology
By Bruce McDonald
This report contains the Phase I findings of a study to select and test devices for preventing lack of alertness in haulage truck drivers. The extent of the problem was determined by visiting surface
Jan 1, 1977
-
OFR-146(8)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines ? Volume 8 ? Yellow Bail Rail ? 8.1 Introduction
By Michael Rieber
Rail cars are referred to as "yellow-balled" when they are sufficiently old or damaged to preclude their efficient operation on long-haul or main line routes. For most coal carrying railroads, their a
Jan 1, 1977
-
OFR-124-77 Inherently Safe Mining Systems
By D. D. Hamilton
The ISMS program provided for the development and demonstration of equipment modifications for improved safety in both conventional and continuous coal mining systems. This report documents the succes
Jan 1, 1977
-
OFR-146(5)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines - Volume 5 ? Conveyor Belts ? 5.1 Introduction
By Michael Rieber
In this study a generalized specification and costing model for high tonnage coal carrying conveyor belts of 3.5 to 100 miles is presented. These belt systems, in modular units or flights, of up to 9
Jan 1, 1977
-
OFR-66-79 Development And Fabrication Of A Prototype Fibrous Aerosol Monitor (FAM)
By Pedro Lilienfeld
This report describes a program whose objective was to develop, design, fabricate and laboratory-test two prototype instruments capable of real-time selective detection and measurement of airborne fib
Jan 1, 1977
-
IC 8742 Underground Mine Communications (In Four Parts) 1. Mine Telephone Systems
This Bureau of Mines report is devoted to descriptions of systems that provide in-mine wired telephone service. Although they may incorporate other features, each system described functions to allow o
Jan 1, 1977
-
OFR-96(2)-78 Final Report For U.S. Bureau Of Mines - Volume II: Pilot Test Plan - 1. Introduction - 1.1 Purpose
The purpose of Volume II of this study is to provide a general plan for the pilot testing of two materials which could be used to tag explosives for both pre- and postdetonation identification and of
Jan 1, 1977
-
IC 8734 Liquid Hydrocarbon Production In The United States, 1946-75 And 1980 Projected, Highlighting Enhanced Recovery
By M. Carrales
This Bureau of Mines publication presents short-range projections of domestic liquid hydrocarbon production through 1980. Appraisal of future crude oil production was made by evaluating the relationsh
Jan 1, 1977
-
RI 8242 Principles of Ionization Smoke Detection. Development of a New Sensor for Combustion-Generated Submicrometer Particulates
By Charles D. Litton
A new prototype ionization-attachment fire detector was developed by the Bureau of Mines for detecting combustion-generated submicrometer particulates. It is much more sensitive than the conventional
Jan 1, 1977
-
IC 8757 Comparative Shortwall And Room-And-Pillar Mining Costs
By L. E. Green
For shortwall mining to be profitable, the additional capital investment of about $1 million for shortwall roof supports must be offset by decreased total operating costs and/or increased coal product
Jan 1, 1977
-
OFR-159-77 High Resolution Seismic Exploration For Geological Faults In Coal Seams
By Marshal Scherba
Coal seams approximately 7 feet, 9 feet and 20 feet thick at depths of 250, 600 and 1,000 feet respectively were detected using high resolution seismic reflection techniques. Investigation of seismic
Jan 1, 1977
-
OFR-64-79 Relationship Of Coal Properties And Machine Parameters To Continuous Mining Machine Cutting Rates
By Iain Finnie
This report is in three parts. The first part presents a review of theoretical models which have been developed to study removal operations for various types of materials. In the second part, a brief
Jan 1, 1977
-
OFR-5-79 Design And Testing Of A Continuous Excavator For Surface Coal Mining
By Jules Gordon
Presents the results of mining tests conducted on a forward rotating bucket wheel excavator designed to continuously mine coal at 1080 tons/hour, Goals of the program are to determine the feasibility
Jan 1, 1977