Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • NIOSH
    OFR-104(1)-80 Selective Placement Of Coal Stripmine Overburden In Montana - I. Data Base

    By D. J. Dollhopf

    The specific objective of this three year study is to investigate the means of reestablishing non-polluted hydrologic systems in areas where surface mining directly impacts shallow ground-water resour

    Jan 1, 1977

  • NIOSH
    OFR-33(7)-79 Application Of A Total System Surface Mine Simulator To Coal Stripping - Volume VII - Application Of OPMHS To A Southwestern Surface Mine

    By C. B. Manula

    In this report, the application of the Open Pit Materials Handling Simulator (OPMHS) to a Southwestern surface mine using draglines and front-end loaders is described. The specific objective of the st

    Jan 1, 1977

  • NIOSH
    OFR-61(3)-78 Coal Mine Electrical System Evaluation - Volume III - Shielded Cables

    By Lloyd A. Morley

    Proposed advantages and disadvantages of low-voltage shielded trailing cables are formulated utilizing the literature and industry sources. A partial analysis of these proposed advantages and disadvan

    Jan 1, 1977

  • NIOSH
    OFR-52-78 Digital Computation Of Transients And Safety Testing Of Mine Electrical Power Systems

    By Eldon Keith Stanek

    This annual report deals with a multi-faceted research effort to increase mine electrical system safety. The project can be broken down into six task areas. Task one deals with the development of test

    Jan 1, 1977

  • NIOSH
    OFR-90-78 Electrical Materials Analysis - Arcing

    By Frederick C. Trutt

    Research performed on arcing faults and their interaction; with electrical insulating materials within coal.-mine power-system enclosures is described. This work was performed at The Pennsylvania Stat

    Jan 1, 1977

  • NIOSH
    RI 8212 - Methane Emissions From Four Working Places In The Beckley Mine, Raleigh County, W. Va.

    By P. W. Jeran, M. C. Irani, D. H. Lawhead

    The Beckley mine is one of five new mines in a heretofore unmined portion of the Beckley coalbed. The remoteness of these new mines from prior mining and their greater overburden preclude applying met

    Jan 1, 1977

  • NIOSH
    Appendix E - Thermodynamics Method Program Output

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    TEST DECK - AITIHETER SURVEY WITHOUT ALTIMETER TEUPERATURE CORRECTION DATA INPUT

    Jan 1, 1977

  • NIOSH
    OFR-49(1)-79 Construction, Inspection And Maintenance Of Mine Haulage Track, Volume I

    By Edward G. Cunney

    [Track in underground bituminous coal mines was investigated and technology has taken from other industries in order to Main information on conditions that impair the safety and efficiency of the trac

    Jan 1, 1977

  • NIOSH
    OFR-77-78 A Census Of Mobile Machines Used In U. S. Surface Coal Mines

    By Eric E. Unger

    Results are presented of a census of the machines used in surface coal mines in the United States. The numbers of each machine type and model reported to be in use are tabulated for large and small mi

    Jan 1, 1977

  • NIOSH
    OFR-60-78 Analysis Of Coal Preparation Plants For Applicability Of The National Electrical Code - Part I: Analysis And Review - Part II: Recommended Guidelines

    By S. Atallah

    A survey was conducted relating to the current practices for the classification of hazardous locations in coal preparation plants. Several plants processing bituminous, anthracite and lignite coal in

    Jan 1, 1977

  • NIOSH
    OFR-117(1)-77 Limits And Cost Sensitivity Of Alternate Parting Handling Methods - Volume 1

    By Thomas E. Finch

    This report is a continuation and expansion of a previous USBM grant (No. G0254004) which examined alternative methods of handling the parting between two coal seams in a surface mining operation. The

    Jan 1, 1977

  • NIOSH
    OFR-133A(2)-77 Longwall-Caving Mining Method For Thick Coal - Design And Feasibility Study - Final Report, Volume II

    By M. G. Wallis

    This report presents the results of a study to develop a detailed mining method design based on longwall mining with sublevel caving. The method is applicable to low-dipping coal seams 20 or more feet

    Jan 1, 1977

  • NIOSH
    OFR-123(5)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume V Application Of PSU/MVS To The Ventilation Planning Of A New Mine

    By R. Stefanko

    In this report, the use of Penn State Ventilation Simulator (PSU/MVS) for planning and evaluating new coal mine ventilation systems is demonstrated. The simulator's application to evaluate the ve

    Jan 1, 1977

  • NIOSH
    Mining And Mineral Operations In The North-Central States - A Visitor Guide - Introduction

    Minerals are vital to any industrialized civilization. Annually, the United States uses more than 4 billion tons of new mineral materials, or about 40,000 pounds per person-about half being mineral fu

    Jan 1, 1977

  • NIOSH
    OFR-106-77 Time Domain Reflectometry Microcomputer

    By Roger A. Dworak

    This report describes in detail the work done on the development of the Time Domain Reflectometry Microcomputer (TDRM). Modifications to the FMC-Model 302A Cable Fault Locator is described in Appendix

    Jan 1, 1977

  • NIOSH
    OFR-14-78 Development Of Optimized Diffuser And Spray Fan Systems For Coal Mine Face Ventilation

    By Robert E. Wallhagen

    This report describes the results of a four year investigation into improved face ventilation systems for underground coal mines. The objective was to experimentally determine configurations for a dif

    Jan 1, 1977

  • NIOSH
    OFR-29-78 Mine Wide Test Of The WVU Monitoring Concept - Phase I Final Report: System Design, Installation And Test Results

    By M. D. Aldridge

    The results of designing, constructing, installing and operating a ventilation monitoring system throughout an entire commercial coal mine is presented. Measured parameters were airflow, methane, carb

    Jan 1, 1977

  • NIOSH
    OFR-117(2)-77 Limits And Cost Sensitivity Of Alternate Parting Handling Methods - Volume II - Appendix A - Operating Instructions For The Production Profile Program

    The Production Profile Program is written for use on a Digital Model PDP 11/70 computer using a Fortran IV level G language. It may be run on any system which uses G level or an upward compatible vers

    Jan 1, 1977

  • NIOSH
    OFR-104-78 Demonstrating The Noise Control Of A Coal Preparation Plant - Volume I. Initial Installation And Treatment Evaluation

    By Matthew N. Rubin

    This report summarizes the work performed under USBM Contract No. H0155155, "Demonstrating the Noise Control of a Coal Preparation Plant." A Consolidation Coal Company coal preparation plant (the Geor

    Jan 1, 1977

  • NIOSH
    OFR-45-78 Safety Analysis Of Shaft-Sinking Operations

    The safety analysis of shaft-sinking operations included a review of accident reports from coal and metal-nonmetallic mine shaft-sinking projects in the United States, a review of foreign and domestic

    Jan 1, 1977