RI 3425 Progress Reports - Metallurgical Division ? 27. Ore-Testing Studies, 1937-38 - (Special Methods Of Analysis And Testing And Details Of Tests On Various Ores.) ? Introduction And SummaryBy C. W. Davis
This report follows the same general scheme as did its predecessors; it begins with a dissertation on some phase of ore-testing, continues with results of investigations of ore-treatment methods and o
Jan 1, 1938
-
RI 3425 Progress Reports -Metallurgical Division ? 27. Ore-Testing Studies, 1937-38 (Special Methods Of Analysis And Testing And Details Of Tests On Various Ores.)By C. W. Davis
This report follows the same general scheme as did its predecessors; it begins with a dissertation on some phase of ore-testing, continues with results of investigations of ore-treatment methods and o
Jan 1, 1938
-
OFR-35-88 Prediction Of Incipient Electrical-Component FailuresBy Jeffery L. Kohler
This final report on Bureau of Mines Contract J0338028 presents the results of a research effort to predict incipient failure in electric-power-system components. The development of continuous monitor
Jan 1, 1987
-
OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? IntroThis appendix contains the list of equipment selected for the capitol cost estimate, with the respective quotations from their vendors/manufacturers. A vendor response report along with a separate equ
Jan 1, 1979
-
OFR-46(1)-81 Risk Analysis For Rock Slopes In Open Pit Mines - Final Technical Report - Part I - Distributions Of Rock Mass PropertiesBy Herbert H. Einstein
The thrust of research reported in Part I was to collect in-situ data from exploration programs and the published literature, and to empirically establish distributional patterns for these variables.
Jan 1, 1979
-
RI 4861 Electrolytic Manganese Tests In Cooperation With IndustryBy Jr. Sillers
To prove to .the satisfaction of all concerned that electrolytic manganese from our low-grade domestic ores could be substituted satisfactorily for ferro-manganese made from high-grade foreign fires,
Jan 1, 1952
-
OFR-22-88 Development Of A Monorail Bridge Conveyor SystemBy Guenter F. Lehmann
This report summarizes the results of the development and testing of a prototype monorail suspended bridge conveyor (MBC) system as a method of continuous haulage In underground mining applications. I
Jan 1, 1988
-
OFR-190-84 Coal Injector For Coarse Slurry TransportBy Mackenzie Burnett
An inducer-type pump, capable of injecting dry coal into a hydraulic transport pipeline has been developed and installed in a specially designed and fabricated slurry injector vehicle. The full scale
Jan 1, 1983
-
OFR-146(1)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines ? Volume 1 ? Summary And Conclusions ? 1.1 Project ParametersBy Michael Rieber
This study is an extension of our previous work in the area of coal transportation Its subject is the comparative costing of competing transport erodes. A wide range of costs and aspects of costs are
Jan 1, 1977
-
OFR-72-77 Feasibility Study Of Electric Shock PreventionBy Gordon R. Sima
This contract is concerned with feasibility studies, design and fabrication of a prototype hand-held test instrument and a machine-mounted test Instrument for measurement of electrical shock hazards o
Jan 1, 1976
-
OFR-54-81 Improving Surface Coal Refuse Disposal Site InspectionsBy R. A. Meister
The study on improving surface coat refuse disposal site inspections included surface inspections of 15 refuse disposal sites. Monthly aerial photos were taken of the sites and computer methods were u
Jan 1, 1980
-
OFR-88-79 Study Of The Human Factors Aspects Of An Automated Continuous Mining SectionBy Robert L. Frantz
This report is a part of the project "Study of the Human Factors Aspects of an Automated Continuous Mining Section". The report covers three phases: Phase I Assessment of the Impact of the Auto
Jan 1, 1977
-
OFR-118-76 Heap Leaching Studies On Uranium OreBy Robert C. Merritt
Laboratory amenability studies as well as a pilot heap-leaching investigation of low-grade sandstone uranium ores from Wyoming, New Mexico, and Colorado are described. Sulfuric acid heap leaching with
Jan 1, 1976
-
IC 6586 Mining Practice At The Edwards Mine Of The St. Joseph Lead Co., St. Lawrence County, N. Y. - IntroductionBy John B. Knaebel
This paper is one of a series being prepared by the Bureau of Mines on mining methods and costs at various mines in the United States, Canada, and Mexico, and is a description of practice at the Edwar
Jan 1, 1932
-
OFR-104(2)-80 Selective Placement Of Coal Stripmine Overburden In Montana - II. Initial Field DemonstrationBy D. J. Dollhopf
A week-long selective overburden handling dragline op ration was conducted at a strip mine near Colstrip, Montana. The objective of the demonstration was to hvdrologically isolate a saline overburden
Jan 1, 1977
-
American Lignites: Geological Occurrence, Petrographic Composition, And Extractable Waxes ? IntroductionBy W. A. Selvig
EQUIREMENTS of montan wax for industrial use in the United States before World War II were met by imports, nearly all of which came from Germany. An important industry for extraction and refinement of
Jan 1, 1950
-
OFR-70-77 Development Of A Visual Display System For Paging Mine PersonnelBy John E. Trombly
System objectives and design criteria for an in-mine visual personnel paging system are discussed. Display technologies are evaluated and tradeoffs leading to display selection are described. The prot
Jan 1, 1975
-
A Computer Simulation Model For Surface Mine Reclamation Planning - Volume II: Dragline ModelBy R. V. Ramani
This volume is the second of a four-volume final report on research carried out under a contract from the U.S. Bureau of Mines on the development of a computer simulation model for surface mine reclam
Jan 1, 1985
-
OFR-50-76 Survey On Protective Canopy Design - 1. IntroductionBy R. Farrar
The survey work on protective canopy design was conducted in a 2-month period commencing November 15, 1973. The reported re¬sults under this contract are intended to provide guidance to coal mine oper
Jan 1, 1974
-
RI 9502 - Accurate Power Monitoring for Electric Arc FurnacesBy Alan D. Hartman
Standard metering of electric arc furnaces usually uses root mean square (RMS) or true root mean square (TRMS) measurements for determining power. Only sinusoidal signals are accurately described by R
Jan 1, 2010