Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Visualization Of Multi-Digit Manipulation Mechanics - IntroductionBy Shouchen Dun, Zong-Ming Li
Manipulation of hand-held objects in 3D space is a complex task. Understanding how individual digits interact with a hand-held object provides helpful information for hand tool designers, researchers,
Jan 6, 2006
-
Improved Ventilation Techniques Reduce Auger Mining Dust Levels ? ObjectiveReduce the dust levels to which jacksetters and helpers on auger mining sections are exposed by identifying viable, effective methods for control-ling respirable dust on these sections. Approach
Jan 1, 1988
-
RI 8697 Recovery of Iron and Copper From Copper Smelting Furnace Slags by Carbon Injection - With an Appendix on Evaluation of Granulated Iron as a Precipitant for Copper by W. J. SchlittBy J. I. Paige
The Bureau of Mines, U.S. Department of the Interior, conducts research on methods to minimize the requirements for mineral raw materials through conservation, substitution, and increased minerals and
Jan 1, 1982
-
RI 7291 Influence Of Volatile Fuel Components On Vehicle EmissionsBy B. H. Eccleston
The Bureau of Mines, in cooperation with the American Petroleum Institute, studied the effect of fuel volatility and front-end fuel composition on the amount and photochemical reactivity of automobile
Jan 1, 1970
-
Evaluation Of Water-Jet-Assisted Cutting - ObjectiveDetermine the advantages and operational limitations of water-let-assisted cutting used with mining equipment. Approach The Bureau of Mines con-ducted a research study to evaluate water-Jet-as
Jan 1, 1987
-
Abrasive Materials ? General SummaryBy Henry P. Chandler
THE year 1950 was one of increased activity in almost all branches of the abrasives industry, with nearly all abrasive materials showing a marked increase in tonnage and value. New records were made I
Jan 1, 1953
-
Model Verification And ImplementationBy R. V. Ramani, V. T. Burgos, J. A. McClay
Model testing is a two part operation; first, to assure the valid¬ity of the mathematical statements and second, to evaluate the accuracy of the computer model for predictive purposes. Verification of
Jan 1, 1975
-
Part Ten - Signal-To-Noise Ratio Improvement Techniques – I. SummaryBy Roy Greenfield
During the detection phase, several procedures can be used to improve the signal-to-noise ratio (SIN) . • Subarrays of up to 10 seismometers should be used. The apparent failure to obtain improveme
Jan 1, 1974
-
IC 9338 Availability Of Platinum And Platinum-Group MetalsBy Catharine T. Fogg
The U.S. Bureau of Mines investigated the availability of platinum, palladium, and rhodium from 16 deposits in four market economy countries (MEC's). Major recoverable products include 164 Moz of
Jan 1, 1993
-
Discriminating Protection For Trolley WiresBy D. A. Paice, A. B. Shimp
Illegitimate loads on a mine dc power distribution system can be detected by measuring a superimposed ac current. To implement such a scheme, a 10-volt, 3-kHz voltage is applied at each dc power subst
Jan 1, 1975
-
Introduction (ce6ed138-ebb9-4d6c-8632-d3f95cf53a2d)Now more than ever, the United States must have an adequate and dependable supply of minerals to meet its defense and economic needs. A chief mission of the U.S. Department of the Interior Bureau of M
Jan 1, 1991
-
Field Studies Of CO Migration From Blasting (c93a7320-1dd7-47fa-a236-1912a546f628)By Richard J. Mainiero, Sapko, Marcia L. Harris
Since 1988, there have been thirteen documented incidents in the United States and Canada in which carbon monoxide (CO) is suspected to have migrated through near surface strata into structures or oth
-
Acute Effects Of Vibration On Rat-Tail Nerves - IntroductionBy Danny Riley, Brian Curry, Sandya Govindaraju, James Bain
Hand arm vibration syndrome (HAVS) affects industrial workers exposed to long term hand-transmitted vibration from powered-tools. Peripheral neuropathy is a major component of the symptom complex of
Jan 6, 2006
-
RI 4862 Bumpus Pegmatite Deposit, Oxford County, MaineBy G. L. Neumann
In October 1949 the College Park Branch of the Mining Division instituted a survey of the New England pegmatites. Many of the New England pegmatite deposits were superficially examined, and the Bumpus
Jan 1, 1952
-
Bulldozer Work Rate Indicator ? ObjectiveReduce costs of surface mine reclamation by improving bulldozer operating efficiency. Approach A draft power indicating system helps bulldozer operators adjust blade height and other controls for m
Jan 1, 1979
-
RI 6079 Titanium-Iridium Phase Diagram ? SummaryBy J. G. Croeni
The titanium-iridium alloy system was investigated to determine whether alloys of this system would merit further development as control-rod material for nuclear reactors. A study was made to determin
Jan 1, 1962
-
Field Test Of An Automated Temporary Roof Support (ATRS] On A Low-Coal, Single Fixed-Head Roof-Bolting Machine (Squirmer)By Charles T. Chislaghi
An economical, remotely operated (automated), temporary roof support (ATRS) has been developed by the Bureau of Mines for use on a single, fixed-head roof-bolting machine (squirmer) that operates in l
Jan 1, 1982
-
OFR-106(2)-85 Cost-Effectiveness Of Dust Controls Used On Unpaved Haul Roads - Volume II -- DataBy Keith D. Rosbury
The basic objective of this project was to determine the cost-effectiveness of dust control used on unpaved mine haul roads. Field testing was conducted at three surface coal mines (two in Wyoming, on
Jan 1, 1983
-
Second-Quarter National Economic Activity And Third-Quarter Outlook - Second-Quarter 1988By Joan Weinberg
The real gross national product (GNP) advanced at a annual rate of 3.1 % during the second quarter, following a revised 3.4% increase in the first quarter (see table 1). Export growth continues to pla
Jan 1, 1988
-
OFR-38-73 Accident Prediction Investigation Study - Investigation Objectives And Accident Prediction Techniques - OverviewThe original work statement of this contract was entitles: 'A Accident Analysis Model for Use in Underground Coal Mines.' The contract was scheduled for a duration of 26 months and was to be
Jan 1, 1972