Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Blasting Safety – Revisiting Site SecurityBy Thomas E. Lobb, Harry C. Verakis
Significant progress has been made in the reduction of serious injuries and fatalities resulting from mine blasting operations. Despite the progress, injuries and fatalities continue to occur. A leadi
-
Bulletin 8 The Flow Of Heat Through Furnace WallsBy Henry Kreisinger, WALTER T. RAY
This bulletin contains a statement of certain results that will be embodied in a report describing investigations of the combustion of fuel made by the United States Geological Survey and the Bureau o
Jan 1, 1911
-
OFR-58-75 Noise Of Diesel-Powered Underground Mining Equipment: Impact, Prediction, And Control ? Summary Of ResultsBy W. N. Patterson
The three major objectives of this contract were (1) to survey underground diesel-powered mining machinery to determine noise exposure problems, (2) to recommend noise control techniques, and (3) to d
Jan 1, 1975
-
Bulletin 37 Comparative Test of Run of Mine and Briquetted Coal on LocomotivesBy W. F. M. GOSS
For the purpose of procuring data that could be used in estimating the value of the briquetting process as applied to American fuels, the United States Geological Survey, in cooperation with other int
Jan 1, 1911
-
IC 8317 Thermophysical Properties Of Selected Gases Below 300° K ? IntroductionBy R. A. Guereca
Preliminary to an experimental study of selected physical properties of helium and related gases) the Bureau of Mines Helium Research Center conducted a data-gathering literature survey. This report c
Jan 1, 1967
-
RI 3497 Permissible Electrically Operated PumpsBy H. B. Brunot, L. C. IlsLey, E. J. Gleim
"INTRODUCTION To supply inspectors, safety engineers, and others with detailed information as to the safety features of the various electrically operated machines that have been approved as permissibl
Mar 1, 1940
-
RI 8811 - Experimental Drift Linings in a Block-Caving Operation-A Field DemonstrationBy W. C. McLaughlin
Under a cooperative agreement, the Bureau of Mines, Magma Copper Co., and ASARCO, Inc., tested backfilled ground support systems at t.wo elevations in Magma's San Manuel, AZ, mine. The tests were
Jan 1, 1983
-
RI 4128 Gasification of Lignite & Subbituminous Coal - Progress Report 1945-46By E. O. Wagner, A. W. Koth, V. F. Parry, J. B. Goodman, D. C. Gernies
"INTRODUCTION A commercial-scale pilot plant for gasification of lignite was completed by the Bureau of Mines at Grand Forks, N. Dak., early in 1945 as an extension of work on, gasification of low-ran
Sep 1, 1947
-
RI 7414 Sorption Of S02 And Regeneration Of Alkalized Alumina In Fluidized-Bed ReactorsBy Jack I. Paige
In this Bureau of Mines study, two fluidized-bed reactors were designed, built, and operated, one as a sorber for S02 and the other as a contactor for the regeneration of the sulfur-laden alkalized al
Jan 1, 1970
-
IC 9429 Cyanide Chemistry Precious Metals Processing And Waste TreatmentBy Jr. Flynn
This U.S. Bureau of Mines publication is a compilation of fundamental cyanide chemistry data obtained through review of the scientific literature. It includes information on thermodynamics and chemica
Jan 1, 1995
-
IC 7105 Annual Report Of Research And Technologic Work On Coal, Fiscal Year 1939 ? IntroductionBy A. C. Fieldner
This report is the fourth of a series of annual summaries of research and technologic work on coal by the Technologic Branch of the Bureau of Mines. The coal research program of the Bureau has been
Jan 1, 1940
-
MLA 25-87 - Mineral Resources Of The Pyramid Peak Planning Area, Riverside County, California ? SummaryBy Michael S. Miller
In 1985 and 1986, at the request of the U.S. Forest Service, the U.S. Bureau of Mines studied the 17,000-acre Pyramid Peak planning area in order to evaluate its identified mineral resources. The plan
Jan 1, 1987
-
IC 6902 Reconnaissance Of Mining Districts In Pershing County, Nev. ? IntroductionBy William O. Vanderburg
This paper gives the results of a reconnaissance of the mining districts in Pershing County, Nev., made from March 9 to April 1, 1936. During the field work nearly all of the mining districts in the c
Jan 1, 1936
-
OFR-104-76 Research And Development Contract For Detection Of Faults In Mine Haulage Systems - Phase II ? 1.0 IntroductionBy Robert R. Perron
The U. S. Bureau of Mines is engaged in many diverse programs for improving mine safety. Of particular interest to the Bureau are new and improved means for minimizing the hazard of fire which can be
Jan 1, 1975
-
OFR-57-77 Constitutive Relations Of Coal And Coal Measure RocksBy Hon-Yim Ko
The properties of coal from the Pittsburgh seam, procured from the Bruceton and Federal No. 2 Mines were found to be similar. Strength and stiffness properties of Beehive Mine coal were determined and
Jan 1, 1976
-
Status Of The Mineral Industries - IntroductionMinerals are a fundamental component of the Nation" material and economic base. Without a continuous supply of minerals to meet growing and changing needs, the basic character of our society would be
Jan 1, 1977
-
RI 8337 Design of a Compact Muffler for a Jumbo DrillBy A. Visnapuu
The Bureau of Mines, as a part of its goal to minimize occupational hazards associated with mining and mineral processing operations, has developed and field tested a compact exhaust air muffler for m
Jan 1, 1979
-
RI 4321 Recovery Of Lithium From Its Various Ores And SaltsBy J. B. Cunningham
Lithium in the form of metal, salts, and alloys is particularly important because of increasing industrial uses resulting partly from wartime developments. Lithium carbonate and lithium strontium nitr
Jan 1, 1948
-
IC 8743 Underground Mine Communications (In Four Parts) 2. Paging Systems (a5d3ff79-e6f6-4d20-8174-6a360280b9c8)This Bureau of Mines report summarizes the research, development, and evaluation demonstrations conducted by the Bureau of Mines under the Health and Safety Act of 1969 to improve the means of notifyi
Jan 1, 1977
-
OFR-91-76 Design, Fabrication, And Testing Of A System To Demonstrate The Effectiveness Of Respirable Dust Control On Longwall Shearers By The Use Of Water Piped Through The Shearer Drum ? I. IntroductionThis report is in fulfillment of Contract H0230031 awarded to Bituminous Coal Research, Inc., on May 23, 1973. The scope of work to be performed under this contract was divided into four phases: Phase
Jan 1, 1976