Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Underground Mine Scheduling Modelled as a Flow Shop: A Review of Relevant Work and Future ChallengesBy M. Åstrand, M. Johansson
"Advanced planning and automation are increasingly important in modern mines. Sophisticated methods for long-term mine planning are often used, and the advent of autonomous machines makes the actual o
Dec 1, 2018
-
Comparison between traditional coal washability determination methods and the RhoVol density analyser, Q.P. Campbell, M. le Roux, and M. FofanaBy M. Le Roux, Q. P. Campbell, M. Fofana
The determination of densimetric information to predict coal washabilities is an important step in characterising the feed material, as well as the performance of operating plants. However, traditiona
Jan 1, 2020
-
Financial Analysis of the Impact of Increasing Mining Rate in Underground Mining, Using Simulation and Mixed Integer Programming"This paper challenges the traditional notion that mine planners need to plan production so as to incur the lowest mining cost. For a given mine configuration, a mine that increases its mining rate wi
Jan 1, 2017
-
An Investigation of the Behaviour of Double Oxide Film Defects in Aluminium-Magnesium Cast AlloysBy M. A. El-Sayed
"Double oxide films (bifilms) are significant defects in light alloy castings that occur when, during melt handling, the oxidized surface of the melt is folded over onto itself and then entrained into
Nov 1, 2018
-
Application Of UCAR® Chill Kote? Lining To Ilmenite SmeltingBy D. Bessinger, J. Rabe, J. Zietsman, C. Coetzee, P. H. Lamont, J. Muller
The UCAR® CHILL-KOTE? freeze lining concept combines wall cooling with carbon and graphite refractories of higher thermal conductivities to ?chill? the refractory lining by transferring heat from the
Jan 1, 2007
-
A decision analysis guideline for underground bulk air heat exchanger design specificationsBy M. Hooman, W. M. Marx, R. C. W. Webber-Youngman
This paper discusses a study that investigated different underground bulk air heat exchanger (>100 m3/s) design criteria. A literature review found that no single document exists covering all design c
Jan 1, 2015
-
The spillover effect of industrial action on the profitability of platinum mining companiesBy M. L. Pududu, B. Ceki, K. Mohajane
This study was aimed at determining the effects of industrial action on profitability in the South African platinum mining sector. We compared companies where employees engaged in industrial action (a
Dec 13, 2022
-
A comparison between hydraulic and pneumatic rockdrillsBy T. C. Marshall
A comparison between hydraulic and pneumatic rockdrills by T. C. Marshall, Pr.Eng. (Member) The greatly increased output of rockdrills has placed new demands on booms, carriers, and drill steels and b
Jan 2, 1974
-
A new grade-capping approach based on coarse duplicate data correlationBy D. Marcotte, R. V. Dutaut
In most exploration or mining grade data-sets, the presence of outliers or extreme values represents a significant challenge to mineral resource estimators. The most common practice is to cap the extr
May 1, 2021
-
Numerical and Physical Modelling of Tundish Slag Entrainment in the Steelmaking ProcessBy S. Bradshaw, A. Mabentsela
"Physical and numerical modelling methods were followed to identify mechanism(s) for tundish slag entrainment in a bare tundish and one with a flow control device (FCD).The physical and numerical mode
Jan 1, 2017
-
Resistance spot welding of a thin 0.7 mm EN10130: DC04 material onto a thicker 2.4 mm 817M40 engineering steelBy R. C. Nkhoma, K. A. Annan, S. Ngomane
The effects of welding current, electrode force, and welding time in a resistance spot weld were studied to investigate the effectiveness of welded joints between a thin EN10130: DC04 material and a t
Oct 1, 2021
-
Between-Laboratory Biases-Same Sample, Different Answers. Some GuidelinesBy M. McWha
Laboratory bias is a universal problem in all branches of analytical science. It results from differences in methods, techniques, equipment, and calibrations between laboratories. Notwithstanding that
Jan 1, 2014
-
Modelling of Caving and Deformation Mechanisms of the Hangingwall of the Printzsköld Oreboby at Malmberget Mine (03a27e40-8c71-43a1-b479-c4de1aad711b)By J. Sjöberg, T. Savilahti, S. B. Umar
"Sublevel caving in Malmberget mine results in mining-induced surface deformation. One of the currently mined orebodies is the Printzsköld orebody. As mining deepens there is need to assess the behavi
Jan 1, 2017
-
Sulphate removal technologies for the treatment of mine-impacted waterBy K. A. du Preez, P. J. van Staden, M. van Rooyen
Mine-impacted water, including acid mine drainage (AMD), is a global problem. While precipitation of dissolved metals and neutralization of acidity from mine-impacted water is accomplished relatively
Oct 1, 2021
-
Computer-Aided Design of a Flash Smelting InstallationBy C. A. Green, M. A. T. Cocquerel, R. T. Gates
"Engineering studies by Selection Trust, Limited, initially in connection with the development of a copper and nickel deposit for Bamangwato Concessions, Limited, and subsequently for several other cl
Jan 1, 2014
-
"The Advantages Of Ili Inspection And Practical Issues Involved In Undertaking Projects". - IntroductionBy Ernie Holden, Chris Ringas
In the last 20 years, In Line Inspection (ILI) using intelligent pigs has become the principal tool used by pipeline operators to assess the condition of their pipelines. New pipelines are normally de
Jan 1, 2006
-
Investigation of the mechanism for fireside corrosion in coal-fired boilers in South AfricaBy J. W. van der Merwe, K. G. Moloko
Furnace wall tubes from 600 MW subcritical boilers at three coal-fired power stations were sampled and the fireside deposits examined to determine the mechanism of fireside corrosion. This involved an
Jun 1, 2021
-
Predicting standard threshold shifts for occupational hearing loss among miners at a large-scale platinum minen in South AfricaBy L. Ntlhakana, K. Khoza-Shangase, G. Nelson, I. Maposa
Occupational noise-induced hearing loss (ONIHL) is associated with various risk factors in South African mines. We investigated the association between standard threshold shifts (STSs) and exposure to
Aug 1, 2021
-
Modelling open pit shovel-truck systems using the Machine Repair Model - SynopsisBy A. Krause
Shovel-truck systems for loading and hauling material in open pit mines are now routinely analysed using simulation models or off-the-shelf simulation software packages, which can be very expensive fo
Jan 1, 2007
-
Implications of Collecting Additional Data for Slope Design in an Open Pit OperationBy M. -H. Fillion
"Geotechnical stability analysis and design in open pit mines requires access to representative geological, structural, hydrogeological, and rock mass models. The quality and quantity of collected geo
Jan 1, 2016