An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? SynopsisBy T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
Evaluation Of The Behaviour Of High-Density Tailings Deposition - CODELCO Pilot Plant - SynopsisBy J. Engels
CODELCO is considering the implementation of high-density tailings management at the Chuquicamata mine in northern Chile for its long term disposal plan. To achieve this, CODELCO commissioned the desi
Jan 1, 2012
-
Probabilistic modelling of lithological domains and its application to resource evaluation - SynopsisThe modelling of lithological domains is a critical step in mineral resource and reserve evaluation. Deterministic models rely on an interpretation of the available drill hole data and expert knowledg
Jan 1, 2007
-
Some novel features and implications of a general risk-analysis model for new mining venturesBy D. G. Krige
The scope and salient features of a general risk-analysis model for the main types of new mining ventures are covered in brief outline. The following special features and their effects on the investme
Jan 1, 1979
-
An initial assessment of the closely spaced dip-pillar mining layout as practised at Driefontein Gold MineBy J. W. Klokow, K. L. Riemer, R. I. L. Ferreira
As a result of the increased depth of mining in the South African gold mining industry mining induced seismicity is a severe problem. One of the strategies within the industry to contain the problem i
Jan 1, 2003
-
Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)By H. Kotzé
Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid
Jan 1, 2006
-
Design Rules For Avoiding Draw Horizon Damage In Deep Level Block CavesDeep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful
Jan 1, 1999
-
Ore Size Does Affect Direct Reduction Of Titaniferous MagnetiteBy M. M. Manamela
Paper written on project work carried out at the University of Pretoria in partial fulfilment of the requirements of the B Tech degree at the Tshwane University of Technology This work tested wheth
Jan 1, 2005
-
The Influence Of N On Hot Ductility Of V-, Nb-,And Nb-Ti- Containing Steels Using Improved Thermal Simulation Of Continuous Casting ? SynopsisBy K. M. Banks
The hot ductility of in situ melted tensile specimens of micro-alloyed steels having C contents in the range 0.12?0.17% (mass %) have been examined over the 700?1000°C temperature range. An improved t
Jan 1, 2011
-
Navigating Above-The-Ground Risk In The Platinum Sector (596af1fa-f653-4318-b2be-d27da8918b80)By A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Mar 1, 2013
-
Navigating Above-The-Ground Risk In The Platinum Sector - SynopsisBy A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Jan 1, 2013
-
Identification of Key Performance Areas in the Southern African Surface Mining Delivery EnvironmentBy A. W. Dougall, T. M. Mmola
"SynopsisThe global resources and commodities market has become highly competitive. While southern Africa’s abundance of minerals resources is still unrivalled, it has lost considerable dominance in t
Jan 1, 2015
-
Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? SynopsisBy E. Demir
Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe
Jan 1, 2012
-
Development of an Atmospheric Datamanagement System for Underground Coal MinesWith increasing demand for real-time monitoring of mine parameters, the requirement for appropriate data management in many mining applications is also increasing. This includes atmospheric monitoring
Jan 1, 2014
-
Acoustic Estimation Of The Particle Size Distributions Of Sulphide Ores In A Laboratory Ball MillThe acoustic signals emitted from a laboratory-scale ball mill were used for the estimation of the comminution of two complex sulphide ores, viz. Merensky and UG2 ores from the Bushveld Igneous Comple
Jan 1, 2000
-
Grid-Based Analysis of Seismic DataQuantitative seismology is an important tool for investigating mineinduced seismicity and the quantification of the seismic rock mass response. The spatio-temporal interpretation of seismic data withi
Jan 1, 2014
-
Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and ConstructionBy F. B. Samani, B. Stabel
The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the
Jan 1, 2003
-
Passion For MetalsBy J. Kempken, T. A. Schreiter, R. Degel, H. Schmieden
Keywords: Pyrometallurgy, SMS Demag, Germany, submerged arc furnace, ferro alloys, non-ferrous, FeCr, FeNi, FeMn, copper, cobalt, slag cleaning, PGM, rectangular furnace After a short summary of t
Jan 1, 2006
-
Colloquium Practical Applications of Instrumentation in the Mining and Metallurgical IndustriesCOLLOQUIUM PRACTICAL APPLICATIONS OF INSTRUMENTATION IN THE MINING AND METALLURGICAL INDUSTRIES Rapporteur: J. Laschinger A colloquium and general meeting of the Institute held jointly with the Instru
-
A Technical And Operational Audit Of The First Ten Years Of The Teniente Converter Operations At Nkana SmelterBy M. Syamujulu
In 1994, Nkana smelter commissioned a multimillion US Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce the
Jan 1, 2005