Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A short history of the development of tapping equipmentBy A. Dienenthal
"The casthouse floor has always been one of the most dangerous working places on a blast furnace or a ferro-alloy/nonferrous furnace. Apart from working in an atmosphere including toxic gases, fumes,
Jan 1, 2014
-
Small-Scale Recovery Of Noble Metals From Jewellery WastesBy J. H. Potgieter
This paper describes an investigation to separate and selectively recover silver, gold and platinum from jewellery and laboratory wastes, and produce technical grade material suitable for training pur
Jan 1, 2004
-
An Overview Of The Namakwa Sands Ilmenite Smelting OperationsBy M. Gous
Keywords: Pyrometallurgy, Namakwa Sands, ilmenite, DC arc furnace, titania slag, pig iron Namakwa Sands is a heavy minerals mining and beneficiation business in the Anglo Base Metals Division, and
Jan 1, 2006
-
Survey And Geotechnical Slope Monitoring ConsiderationsBy F. T. Cawood
Monitoring of the slopes of surface mines can prevent loss of life, loss of equipment, loss of production and possibly the loss of the mine. The effectiveness of such monitoring depends on the extent
Jan 1, 2006
-
Annual Financial Statements - Report Of The Independent AuditorsBy N N/A
To the members of The South African Institute of Mining and Metallurgy We have audited the annual financial statements set out on pages 239 to 245. These financial statements are the responsibility
Jan 1, 2000
-
pH advanced process control solution for Impala BMR first stage high pressure acid-oxygen leach - SynopsisBy A. F. Khan
The CSense advanced process control (APC) solution?s main objective was to improve the stability of the pH in the first stage leach process thereby improving nickel and iron extraction efficiencies an
Jan 1, 2009
-
Spotlight on Gold Field?s new head officeBy A. J. Roets
Despite its growth over the years, necessitating ever¬larger office accommodation, the Gold Fields group changed its head office address in Johannesburg only twice in 94 years. The first move was at t
Jan 1, 1985
-
Notices Transportation and the EnvironmentNotices TRANSPORTATION AND THE ENVIRO NMENT The 5th Quinquennial Convention of the S.A. Institution of Civil Engineers will take place at the Carlton Centre, Johannesburg, from 20th to 24th August, 19
-
The effect of temperature on the flotation of pyriteIn the investigation described here, it was found that the main effect of temperature is on the rate of flotation, and that adsorption of the reagent is not rate controlling. Above 10°C, the flotation
Jan 1, 1984
-
Book reviewsThe wage structure of graduate White men in 1979, by Adri Kruger, Pretoria, Human Sciences Research Council, 1979.76 pp. R5,00. (Reviewer: D. G. Malan) Financial Times mining international yearbook, e
Jan 1, 1980
-
The Application of Continuous Mining Machines at Coalbrook CollieriesBy J. G. Ferguson, R. E. Burnton
The nature of the coal and of the roof in No. 3 seam at Coal brook Collieries is such as to preclude the use, during bord and pillar mining, of conventional mining equipment that employs cutting and b
-
The stability and design of yield pillars located at shallow and moderate depthsBy M. U. Ozbay
The stability of pillars is analysed on the assumption that pillars shed load in a stable manner if the slope the strata load-deformation relation is steeper than that of pillars in the post-peak regi
Jan 1, 1989
-
Operational developments during the establishment of Secunda CollieriesBy J. T. Collins, C. J. Cloete
Secunda Collieries forms part of Sasol Coal, the coal division of the Sasol Group of companies, and already produces 29 Mt of coal per annum from its four collieries: Twistdraai, Brandspruit, Bosjessp
Jan 1, 1986
-
Microwave-Assisted So2 Flushed Acid Leaching Of Mixed Cobalt-Copper Oxidised OresBy B. B. Mamba, J Ndalamo
The existence of an impressive reserve of oxidized cobalt-copper bearing ores in the African copper belt area lead the GECAMINES (DRC) to develop specific and adapted mineral processing routes (Mulaba
Jan 1, 2007
-
Annual Financial Statements - Report Of The Independent AuditorsTo the trustees of The SAIMM Scholarship Fund We have audited the annual financial statements of The SAIMM Scholarship Fund set out on pages 587 to 592 for the year ended 30 June 2005. These financ
Jan 1, 2005
-
Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)By P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009
-
Shaft Sinking Scheduling/Planning - IntroductionBy P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009
-
The Recovery of Manganese Products From Ferromanganese Slag Using a Hydrometallurgical RouteBy S. J. Baumgartner
The ferromanganese industry is under pressure to deal with the slag arising from the production of ferromanganese, which is discarded in landfills or slag heaps. This material poses an environmental a
Jan 1, 2014
-
Tap-Hole Maintenance and Management on Furnace 10 at Eramet Norway PorsgrunnBy J. E. Davidsen, M. Honstad
"A well-maintained tap-hole channel is important in order to achieve good and stable furnace operation over time. A worn or short tap-hole channel can lead to more violent flow, significantly increasi
Jun 1, 2019
-
Mining and Treatment Plant Practice at the Finsch Mine, De Beers Consolidated Mines Ltd.By D. Rankin, H. J. Stucke, W. K. B. Loftus
Discussion: H. J. Wright (Member): The authors are to be congratulated on presenting such a comprehensive and lucid account of bringing a large diamond mine into efficient production from the grass r
Jan 3, 1969