Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characterization Of Inorganic Material In Secunda Coal And The Effect Of Washing On Coal PropertiesBy J. C. van Dyk
The objectives of this study were firstly to characterize and quantify the inorganic material in the Secunda gasification feedstock. Secondly, the effect of washing on coal properties and sulphur cont
Jan 1, 2005
-
Platinum Promotion Of Au/Al2O3 Catalysts For Glycerol Oxidation: Activity, Selectivity And Deactivation ? SynopsisBy M. Royker
Gold has been demonstrated as a possible catalyst for oxidation reactions. Some evidence for a possible promotion effect of platinum has also been recorded. The influence of platinum as promoter for A
Jan 1, 2012
-
Proceedings, 108th Annual General Meeting, 2005The 108th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Thursday, 11 August, 2005. Welcome
Jan 1, 2005
-
Strong Ground Motion And Site Response In Deep South African MinesBy A. M. Milev
A stand-alone instrument especially designed for recording strong ground motions was used in this study to create a large data base of peak particle velocities measured on stope hangingwalls. A total
Jan 1, 2005
-
Semi-Empirical Modelling Of The Electrical Behaviour Of DC-Arc Smelting FurnacesBy Q. G. Reynolds
DC arc furnaces are widely used for steel scrap melting, and are increasingly being used for smelting applications as well. The electrical resistivity of slags varies widely, from highly conductive sl
Jan 1, 2004
-
Applied Ergonomics For Operator Compartment Design In An EJC 88 XLP LoaderBy S. Thorley
In engineering design of operator?s compartments, in underground mining equipment, ergonomics principles are often neglected or not given the full recognition they deserve. This paper defines ergonomi
Jan 1, 2006
-
FE Modelling Of Mining-Induced Energy Release And Storage RatesThis paper describes a simple finite element (FE) modelling approach which leads to the computation of seismic energy release rate (ERR) and strain energy storage rate (ESR) which result from mining.
Jan 1, 1999
-
The Estimation Of Platinum Flotation Grade From Froth Image Features By Using Artificial Neural Networks - SynopsisBy C. Marais
The use of machine vision in the monitoring and control of metallurgical plants has become a very attractive option in the last decade, especially since computing power has increased drastically in th
Jan 1, 2011
-
Exploration Strategy And Application At Ashanti?s Obuasi OperationsBy J. A. Cox
The Ashanti mine is located within the Lower Proterozoic Birimian of Ghana, and covers a concession of 474 square kilometres at its Obuasi operations which comprise large scale underground, surface an
Jan 1, 1999
-
Deformation analysis for the middle pier of the Permanent Ship Lock of Three Gorges ProjectBy H. Zhu, F. Xu, T. Wang
Abstract : The deformation monitoring data of the middle pier of the in permanent ship lock in Three Gorges revealed several interesting deformation phenomena. Conclusions and explanations are made co
Jan 1, 2003
-
Testing Stemming Performance, Possible Or Not? - SynopsisBy D. Boshoff
The ability of an explosive to break rock is influenced considerably by the extent of confinement in the blasthole. It is believed that confinement is improved by the use of adequate stemming. The aim
Jan 1, 2011
-
Ignition Behaviour Of Hybrid Mixtures Of Coal Dust, Methane, And AirBy G. V. R. Landman
Changes in the explosion behaviour of mixtures of coal dust, methane, and air when exposed to different energy sources are discussed. Changes to the lower explosive limits, minimum ignition energies,
Jan 1, 1995
-
Peak particle velocity prediction using support vector machines: a surface blasting case studyBy S. R. Dindarloo
Although blasting is one of the most widely used methods for rock fragmentation, it has a major disadvantage in that it causes adjacent ground vibrations. Excessive ground vibrations can cause a wide
Jan 1, 2015
-
A metaheuristic dual interchange algorithm (DIA) for optimising long-term production scheduling in open-pit mine planning APCOM 2021By M. M. Ali, C. Musingwini, R. A. Phillips
The long-term open-pit mine production scheduling problem (OPMPSP) is typically solved in two broad stages. The first stage entails optimisation of the ultimate pit limit, which delimits the economica
Sep 1, 2021
-
Mintek Thermal Magnesium Process (MTMP): Theoretical And Operational AspectsBy M. Abdellatif
Keywords: Magnesium, pyrometallurgy, Mintek Extensive testwork on atmospheric thermal magnesium production has highlighted certain important fundamental and operational factors that have a major i
Jan 1, 2006
-
Studies On The Bioleaching Of Refractory ConcentratesBy A. W. Breed
The bioleaching of arsenopyrite, the oxidation of arsenate and the precipitation of ferric arsenate are competing reactions, hence their rates depend on the relative concentrations of the respective s
Jan 1, 2000
-
Powers Of The Inspectorate To Close A Working Place - Mine And Occupational Health And Safety 2010 ? 1 Designation And Functions Of Chief Inspector And Other InspectorsBy Willem Le Roux
1.1 Section 47(1) of the Mine Health and Safety Act, 29 of 1996 (?the MHSA?) establishes a Mine Health and Safety Inspectorate which is administered by the Chief Inspector of Mines. The Mine Health an
Jan 1, 2011
-
New Slope Stability Considerations For Deep Open Pit MinesThere has been disappointingly little development in the analysis of rock slopes in open pit mines over the past 30 years. A brief review of literature shows that the application of numerical stress a
Jan 1, 2003
-
Automated Structure Mapping Of Rock FacesBy M. K. Elmouttie, G. V. Poropat
Mapping of exposed rock walls provides data on geological features such as joints, bedding planes, faults etc critical to the economics and the safety of mine operations. Traditional, manual methods o
Jan 1, 2006
-
The Re-Engineering Of The Ground Handling System At Cullinan Diamond MineBy A. W. Bester
Paper written on project work carried out in partial fulfilment of B. Eng. (Mining Eng.) Cullinan Diamond Mine currently handles 3.2 million tons of run of ore per annum. This is done by means of a
Jan 1, 2005