Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Data-driven approach for grinding circuit analysis, F. Wang, A. Vazirizadeh, and P. RosarioBy F. Wang, P. Rosario, A. Vazirizadeh
Advances in data science, machine learning, and artificial intelligence are transforming mining and mineral processing, and making them more algorithm intensive. The paradigm is shifting from one of d
Jan 1, 2020
-
Process fault detection using basic singular spectrum analysis and Kernel Density Estimation, S. KrishnannairBy S. Krishnannair
Singular Spectrum Analysis (SSA) is an effective data-adaptive multimodal tool for monitoring chemical processes. However, monitoring multiscale signals using principal component analysis obtained fro
Jan 1, 2020
-
Mechanized Bolting - On-Board Drilling Automation And A Change In The Support Regime In Low-Profile Mechanized MiningBy A. Marek
The safe and optimal installation of roof support remains one of the biggest challenges in underground mining today. Traditional hand-held, roofbolt installation in conventional mining has been repla
Jan 1, 2012
-
Evaluating the triaxial strength of Misis fault breccia using artificial neural networks analysisBy M. Fener, S. Kahraman, O. Gunaydin, M. Alber
Falling into the weak rocks category, fault breccias have extremely poor engineering properties. These pebbles typically cause issues with slopes, subterranean construction, and building projects. Pro
Sep 1, 2025
-
The 'Doorstopper' and Triaxial Rock Stress Measuring Instruments Developed by the C.S.I.R.By E. R. Leeman
INTRODUCTION The first references in the literature to the so-called C.S.I.R. 'doorstopper' strain cell were made in 1964 1,2,3,4. These were the climax of nearly two years of experimental
-
Presidential Address: Managing geotechnical uncertainty and risk in miningBy W. C. Joughin
The science of soil mechanics is 100 years old, and rock mechanics is about 80 years old. While methods of analysis and design have been developed and have evolved over time, these are relatively youn
Sep 6, 2023
-
Enhancing performance metrics of an electrical-powered subsea robotic dredging crawler across varied inclination anglesBy A. K. Raji, E. F. Orumwense, M. O. Ojumu
This research paper introduces a novel passive method for ocean mining using an electricpowered robotic subsea dredging crawler designed to operate in various subsea conditions, including unstructured
Oct 2, 2025
-
Condition based maintenance for mineral processing: Comparison of the remaining useful life predictions for pumps using adaptive auto-regressive and gamma process models, A.V. Cherkaev, S.M. Bradshaw, T.M. Louw, L. Auret, and D.V.J.W. GroenewaldBy D. V. J. W. Groenewald, T. M. Louw, L. Auret, S. M. Bradshaw, A. V. Cherkaev
Unexpected equipment failures lead to financial losses due to production disruption. Time-based maintenance, based on checks over regular time periods, has been employed to minimise disruption. Howeve
Jan 1, 2020
-
Development of a filtered inverse velocity method analyser: A comparative study of smoothing filters in surface mines for optimisation of slope failure predictionsBy M. M. Masood, G. Y. Raju, T. Verma
The inverse velocity method has proven to be an effective approach for predicting slope failures in surface mines by analysing displacement monitoring data. However, the accuracy of inverse velocity m
Sep 1, 2025
-
Radiometric determination in situ of the face grades in Witwatersand gold and uranium minesBy C Smit
SYNOPSIS A prototype collimated radiometric face scanner was tested in the Harmony Gold Mine. The results obtained during the pilot study indicate that in situ radiometric uranium assays are stati
Jan 1, 1985
-
Tunnelling in heterogeneous ground—stresses and displacementsBy K. Grossauer, W. Schubert
For tunnelling in poor and heterogeneous ground a reliable on-site short-term prediction is required to allow a safe and economical construction. With the use of absolute displacement monitoring data
Jan 1, 2003
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
Developing New Approaches To Rock Slope Stability AnalysesBy J. R. L. Read, A. N. Ogden
This paper describes mining industry funded research that is being undertaken to address the critical gaps and uncertainties in our knowledge so that we can develop new approaches and create more effe
Jan 1, 2006
-
Review of machine learning-based Mineral Resource estimationBy M. A. Mahboob, T. Celik, B. Genc
Mineral Resources estimation plays a crucial role in the profitability of the future of mining operations. The conventional geostatistical methods used for grade estimation require expertise, understa
Nov 30, 2022
-
A Bayesian network approach for geotechnical risk assessment in underground minesBy L. Uotinen, M. Rinne, R. Mishra
Underground mining gives rise to geotechnical hazards. A formal geotechnical risk assessment can help to forecast and mitigate these hazards. Frequentist probability methods can be used when the hazar
Jun 1, 2021
-
A conceptual technique to mathematically quantify the trajectory of flyrockBy J. van der Walt, W. Spiteri
Flyrock remains a significant threat to the health and safety of mine employees and integrity of infrastructure, as well as to the safety of the neighbouring communities and their property. This inves
Apr 5, 2023
-
Guide memoire: The principles of reasonable prospects for eventual economic extractionBy T. Mapeta, S. M. Rupprecht
Discussions on reasonable prospects for eventual economic extraction (RPEEE) include the CRIRSCO 2019 reporting template, JORC 2012, SAMREC 2016, CIM 2019 Guideline, and Regulation SK-1300. These repo
Jun 27, 2025
-
Re-evaluation of the PlatMine chromitite pillar strength databaseBy M. I. Mabala, B. P. Watson, M. J. Kanda
A failed and stable Upper Group 2 chromitite pillar database was collected in 2007 as part of the PlatMine 1.2 pillar strength project. The database consisted of 177 pillars, of which 33 had failed. M
Nov 27, 2024
-
Metal Accounting In The Platinum Industry: How Effective Is It?The AMIRA Code of Practice and Guidelines for Metal Accounting was developed in response to demand from a number of sponsor companies, including one major platinum producer. Since its publication in
Jan 1, 2012
-
A formulation for optimum risk in open-pit miningBy B. Maybee, J. Venter, J. Wesseloo
The selection of open-pit slope angles involves high-value decisions with small changes in slope angle, often representing significant changes in net present value. The existing methods used to define
Sep 9, 2024