Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Use Of Titanium Hydride In Blending And Mechanical Alloying Of Ti-Al Alloys - SynopsisBy I. A. Mwamba
Titanium sponge, which is almost pure titanium, is extremely ductile and not easily processed into titanium powder. One method of producing powder is the hydride-dehydride (HDH) process, where titaniu
Jan 1, 2011
-
Hybrid finite-/discrete-element modelling of progressive failure in massive rock slopesBy H. Willenberg, J. S. Coggan
ABSTRACT: Although individually both continuum and discontinuum numerical analyses provide useful means to analyze rock slope stability problems, complex failures typically involve mechanisms related
Jan 1, 2003
-
Orange Free State BranchOrange Free State Branch Minutes of a Committee Meeting held in the Boardroom of Western Holdings on Thursday, IIth October, 1973, at 5.00 p.m. Present Messrs E. T. Wilson (in the Chair), E. Dunstan,
Jan 2, 1974
-
Proceedings, 105th Annual General Meeting, 2002The 105th Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the J.C. Lemmer Auditorium, SA National Museum of Military History, 22Erlswold Way, Saxonwold, Joha
Jan 1, 2002
-
Production Of Titanium Metal Powder By The HDH Process - SynopsisBy X. Goso
Laboratory-scale tests were conducted at Mintek for the production of titanium powder from particulate Kroll sponge by the hydrogenation-dehydrogenation (HDH) process. The aim of this work was to prod
Jan 1, 2011
-
CaF2 solubility in NaC1-KC1 salt flux for aluminium recyclingBy E. Milke, A. Arnold, B. Friedrich, A. Sydykov
CaF2is often used as a fluoride addition to the chloride salt flux in the melting of aluminium scrap. The solubility of CaF2in the chloride salt system is limited. Dissolved CaF2is considered to impro
Jan 1, 2004
-
Handling Of Fluctuating And Low-Strength SO2 Gases An OverviewBy Klaus Hasselwander
Fluctuating SO2 gas streams represent a difficult task for designers of SO2 removal systems (with respect to designing the plant), but in spite of the designers great efforts to solve the problems, th
Jan 1, 2009
-
Handling Of Fluctuating And Low-Strength SO2 Gases - An Overview (0ee8fac6-cd6f-4501-9e30-c6b596fdf493)By Klaus Hasselwander
Fluctuating SO2 gas streams represent a difficult task for designers of SO2 removal systems (with respect to designing the plant), but in spite of the designers great efforts to solve the problems, th
Jan 1, 2009
-
Indicators Of Grindability And Grinding EfficiencyBy J. Levin
Bond's Standard Work Index (SWi) indicates the grindability of an ore, and his Operating Work Index (OWI) indicates the performance of a grinding mil or circuit. The comparison of the two indices
Jan 1, 1992
-
Self-learning infill drilling for strategic mine planning: Simultaneously optimising the value of additional information in a mining complex under grade uncertainty APCOM 2021By Z. Levinson, R. Dimitrakopoulos
A mining complex is an engineering system where raw materials are extracted from several mines, processed, transported, and sold to the market. The uncertainty and local variability of material grades
Sep 1, 2021
-
Learnings from development of an underground sub-level open stope mine below an open pitBy M. C. van Eeden, R. Vermeulen, K. B. Le Bron
This paper presents the lessons learnt during the transition from an open pit method to a sub-level open stoping method at the Koidu Limited kimberlite pipe. These learnings may assist other mines wit
Sep 1, 2025
-
African National Committee On TunnellingAFRICAN NATIONAL COMMITTEE ON TUNNELLING In 1970, the South African Institution of Civil Engineers, the South African Institute of Mining and Metallurgy, the South African Institute of Mechanical Engi
Jan 5, 1974
-
Introducing new Council members (82061035-7b48-48e5-a216-1da1ce921e6c)Mr G H Park was born and brought up in Zimbabwe, in mining from the University of the Witwatersrand. Starting as a Learner Official at Rand Mines, he went Mr D J van Niekerk was educated at Helpmekaar
Jan 1, 1990
-
Process evaluation using the floatability component model approach, T.C. Souza Pinto, L.S. Leal Filho, A.S. Geldenhuys, and D.A. DeglonBy A. S. Geldenhuys, L. S. Leal Filho, D. A. Deglon, T. C. Souza Pinto
The Brucutu iron ore mine (Minas Gerais, Brazil), is Vale`s largest iron producing operation achieving around 21 million tons by flotation of iron ore pellet feed per annum. The run of mine is mainly
Jan 1, 2020
-
Developments In Furnace Technology For Ferro-Nickel ProductionBy T. Gerritsen, A. Matyas, F. Stober, I. Candy
This paper describes developments in ferro-nickel furnace technology, specifically improvements to cooling methods, furnace controls, and high voltage furnace operating regime. The evolution of these
Jan 1, 2004
-
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design ProcessBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Ninth Commonwealth Mining and Metallurgical CongressBy R. C. J. Goode, W. S. Rapson, W. R. Lawrie, L. W. P. Van Der Bosch
W. R. Lawrie (Member): As all the Institute members present are aware, the Ninth Commonwealth Mining and Metallurgical Congress was held in Great Britain from 3rd to 24th May, 1969. The Congress opene
-
Explicit Representation of Rock Reinforcement in 3D DEM Models for Foliated GroundBy M. Pierce, E. Karampinos
"One of the main challenges in the numerical modelling of ground support in underground excavations is to reproduce the performance of the sequential installation of the reinforcement while capturing
Dec 1, 2018
-
Kimberlite-Country Rock Contact Delineation at Finsch Diamond MineBy M. Matabane, T. Khati
"Accurate delineation of the contact between a kimberlite pipe and country rock at production level depths is a challenge due to limited geological data. Geological information is obtained from widely
Feb 1, 2019