    Deformation analysis for the middle pier of the Permanent Ship Lock of Three Gorges Project

    By H. Zhu, F. Xu, T. Wang

    Abstract : The deformation monitoring data of the middle pier of the in permanent ship lock in Three Gorges revealed several interesting deformation phenomena. Conclusions and explanations are made co

    Jan 1, 2003

  • SAIMM
    Pyrite roasting, an alternative to sulphur burning - Synopsis

    The roasting of sulphide ores and concentrates is often the first step in the production of metals or chemicals. In many processes, the production of sulphuric acid is viewed as a by-product, whereas

    Jan 1, 2009

  • SAIMM
    The next generation of permanent cathode and lead anode technology

    By T. Marsden

    The demand for continuous improvement in the industrial world is an ongoing process. Some sectors, where the competitive forces are well established, have led the development of new and reliable techn

    Jan 1, 2009

  • SAIMM
    Improvements in stope drilling and blasting for deep gold mines

    By N. G. Cook, N. C. Joughin, A. J. A. White

    The rate of face advance in the gold mines is between 3 and 10 m a month, with a median value of about 5 m a month; it follows that faces are blasted less frequently than is planned. There are many ad

    Jan 1, 1975

  • SAIMM
    The Application Of The Q-Tunnelling Quality Index To Rock Mass Assessment At Impala Platinum Mine

    Publications on hard rock tunnel support design in the South African mining industry have originated primarily from the goldmines during the past 50 years. Little has been published to date on the pla

    Jan 1, 2002

  • SAIMM
    High-Wall Control At Anglo Gold Ashanti, Navachab Mine (2dbbeb3c-3655-4c5f-9dba-7c00ed466556)

    By André de Jager, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blastin

    Jan 1, 2006

  • SAIMM
    The New Copper Casting-Machine: Experiences At Ferroatlantica

    By A. More, J. Bullón

    Metal casting is one of the most important operations in ferroalloys factories. After the tapping of the furnace and the depuration of the metal, the preparation for customers with cooling, crushing a

    Jan 1, 2004

  • SAIMM
    Investigation of Factors Influencing Blending Efficiency on Circular Stockpiles through Modelling and Simulation

    By J. de Korte, Z. Loubser

    "SynopsisThe aim of a blending stockpile is to minimize the natural variation in properties of a material. Two simulation models were written, for coneshell and chevcon stacking, and used to investiga

    Jan 1, 2015

  • SAIMM
    Investigation into Strata Behaviour and Fractured Zone Height in a High-Seam Longwall Coal Mine

    By G. Song, S. Yang

    "SynopsisThe development of techniques and equipment for single-pass high-seam longwall mining in China is reviewed. Some methods used to obtain the fractured zone height are discussed. The boundary b

    Jan 1, 2015

  • SAIMM
    The Economic Benefits Of Minimized Mill Gold Lock-Up At AngloGold Ashanti Kopanang Gold Plant

    By M. F. van der Merwe

    Anglogold Ashanti?s Kopanang Gold Plant (previously No. 9 Gold Plant) treats ore from Kopanang and Tau Lekoa shafts. The plant is twin streamed and has dedicated treatment circuits, from milling to fi

    Jan 1, 2005

  • SAIMM
    Evaluation of Iyoni II methanometers (567d462a-c8c7-4da5-8e49-14e8ecc75dfb)

    By J. E. Chilton

    No regular monitoring of methane is required in areas of gassy coal mines outby the mining face. Methane ignitions that have occurred in mine outby areas indicate the need to provide better protectio

    Jan 1, 2003

  • SAIMM
    Optimization Studies on the Design of a Processing Plant for a Large Mining Venture

    By C G. Robinson, B. K. Loveday, J. C. Paynter

    "A method of optimizing the design of a processing plant has been developed which minimizes capital and operating costs for average stripping ratios and ore characteristics. Models were developed to d

    Jan 1, 2014

  • SAIMM
    Review Of The Development Work On The Mintek Thermal Magnesium Process (MTMP) - Synopsis

    By M. Abdellatif

    The Mintek Thermal Magnesium Process (MTMP) process is based on DC open arc metallothermic smelting of calcined dolomite at normal pressure and temperatures of 1650?1750°C. The process was demonstrate

    Jan 1, 2011

  • SAIMM
    The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium ? Synopsis

    By W. S. Steinberg

    In 1963, the full-scale engineering study for the development of an iron, steel, and vanadium plant was initiated. This was the birth of Evraz Highveld and its process flow as it is known today. Highv

    Jan 1, 2011

  • SAIMM
    The analysis of angular atypicality of lineaments as an aid to mineral exploration

    By J. P. G. Pretorius, T. C. Partridge

    The analysis of angular atypicality of lineaments as an aid to mineral exploration by J. P. G. PRETORI USc, M.Sc. (Pret.) (Visitor) and T. C. PARTRIDGE, Ph.D. (Natal) (Visitor) In an exploration proje

    Jan 5, 1974

  • SAIMM
    Alternative Methods For In Situ Determination Of Iron Oxide In Steelmaking Slags

    By K. Schwerdtfeger

    Data are presented on the effect of iron oxide on the electrical conductivity of CaO-SiO2-FeO-Fe2O3melts, and on limiting current and impedance in direct current or alternating current charge transfer

    Jan 1, 2004

  • SAIMM
    4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa Mine

    By Reginald N. Boryor, Steven D. Woods

    1.0 Introduction ?Low grade, high tonnage, open pit gold mine. ?Gold bearing Tarkwaian conglomerates. ?Reverse Circulation percussion drilling (25m X 25m grid). ?Composite 1m intervals, logged a

    Jan 1, 2005

  • SAIMM
    Part 2: Experimental calibration of sampling parameters K and alpha for Gy?s formula by the sampling tree method ? Synopsis

    Application of Gy?s formula is appropriate for calculation of the Fundamental Error (FE) prior to samples being collected at any stage of the minerals process, provided that sampling parameters K and

    Jan 1, 2007

  • SAIMM
    A simulation model to study truckallocation options

    By E. Y. Baafi, H. Fan, W. Zeng

    We present a discrete event simulator, TSJSim (Truck-Shovel JaamSim Simulator), for evaluating the stochastic and dynamic operational variables in a truck-shovel system. TSJSim offers four truck alloc

    Dec 13, 2022

  • SAIMM
    Self-learning infill drilling for strategic mine planning: Simultaneously optimising the value of additional information in a mining complex under grade uncertainty APCOM 2021

    By Z. Levinson, R. Dimitrakopoulos

    A mining complex is an engineering system where raw materials are extracted from several mines, processed, transported, and sold to the market. The uncertainty and local variability of material grades

    Sep 1, 2021