The use of modified handles on jack-leg drills to reduce hand vibrationBy T. N. Moore, E. M. De Souza
This paper details a study conducted in Canada on the use of a drill with two different types of elastomer-covered handles in place of the standard steel handles. One type of handle was covered with a
Jan 1, 1991
-
End-of-life mode of failure of a zinc sulphide concentrate fluidized-bed roaster and its rebuilding - SynopsisZincor operates four Lurgi fluidized-bed roasters at its roast-leach-electrowin refinery in Springs, South Africa. In 2006, Zincor?s four roasters had reached ages ranging between 26 and 38 years, whi
Jan 1, 2007
-
A Chance-Constrained Programming Approach For Open Pit Long-Term Production Scheduling In Stochastic EnvironmentsBy J. Golamnejad
This paper attempts to model long-term production scheduling problems by chance constrained binary integer programming in a stochastic environment. This stochastic model is set up to account for ore b
Jan 1, 2006
-
Dry beneficiation of iron ore fines using a tribo-electrostatic belt separator, L. Rojas-Mendoza, K.P Flynn, F.J Hrach, and A. GuptaBy L. Rojas Mendoza, F. J. Hrach, A. Gupta, K. P. Flynn
ST Equipment & Technology (STET)’s tribo-electrostatic belt separator technology allows for the beneficiation of fine mineral powders by means of an entirely water-free technology with high throughput
Jan 1, 2020
-
The Use Of Titanium Hydride In Blending And Mechanical Alloying Of Ti-Al Alloys - SynopsisBy I. A. Mwamba
Titanium sponge, which is almost pure titanium, is extremely ductile and not easily processed into titanium powder. One method of producing powder is the hydride-dehydride (HDH) process, where titaniu
Jan 1, 2011
-
Just-In-Time Development Model For A Sub-Level Caving Underground Mine In ZimbabweBy C. Musingwini
Traditionally, mineral reserves management at most underground mines in Zimbabwe focus on maintaining large mineral reserves so that the time between development and production is as long as possible.
Jan 1, 2003
-
Safety Considerations When Blasting Off The Solid In Underground Fiery Coal MinesBy G. V. R. Landman
In the early days of underground coal mining, the use of explosives to break coal resulted in a large number of disastrous methane and coal dust explosions and consequential loss of life. Research by
Jan 1, 2000
-
A Model Of Mill Power As Affected By Mill Speed, Load Volume, And Liner DesignBy M. H. Moys
Accurate models of mill power are becoming more necessary as the design, operational, and control requirements for grinding mills become more stringent. Models of mill power are reviewed briefly, and
Jan 1, 1993
-
Trithiocarbonates For PGM Flotation (18e369b0-b921-4efe-bc90-4944b671f393)By C. F. Vos
Small replacements of C12-trithiocarbonate (C12-TTC) for dithiocarbonate (DTC)/dithiophosphate (DTP) in a reagent suite for the flotation of platinum group metals (PGM) have significantly improved the
Jan 1, 2007
-
A Thermodynamic Approach To Physical Properties Of Silicate MeltsBy S. Sridhar, R. E. Aune, M. Hayashi
Thermophysical properties of silicate melts are strongly structure dependent. It is well known that the viscosities of slags increase with increasing the degree of polymerization of silicate anions. E
Jan 1, 2004
-
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analysesBy H. Jang, Y. Kawamura
Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter
Jan 1, 2015
-
Use a Can solve SO2 scrubbing system to better link your batch-operated furnace with its by-product sulphuric acid plant - SynopsisBy P. Roy
Smelting or converting of sulphide concentrates and mattes in a batch operation presents a challenge when directing the off- gas to a conventional acid plant. The Hindustan Zinc Ltd. (a division of th
Jan 1, 2007
-
Grouted Rock-Studs As Rockburst Support: A Simple Design Approach And An Effective Test ProcedureActual observations of rockburst damage, together with some theoretical considerations, strongly suggest that conventional approaches to the design of tunnel support are inappropriate where there is a
Jan 1, 1994
-
Characterisation of precipitates formed during Se and Te removal from sulfate leach solutions, Y. Bello and C. DorflingBy Y. Belloa, C. Dorfling
The presence of impurities such as Se and Te in copper sulfate leach solutions can have a detrimental effect on electrowinning efficiency. These elements can be removed from the solution by precipitat
Jan 1, 2020
-
The investment decision under uncertaintyBy H. M. Wells
The investment decision under uncertainty by H. M. WELLS, Pr. Eng., M.Se. (Fellow) The future outcome of a proposed investment is uncertain at the time the decision must be made to accept it or reject
Jan 4, 1976
-
In sit characterization of the transport and sorption characteristics of coal seams from pressure transient data: An artificial neural network approachBy T. Ertekin, X. Dong
This paper identifies the need for the development of specialized inverse solution techniques for the analysis of pressure transient data for the characterization of the transport and sorption propert
Jan 1, 2003
-
The design, erection, and commissioning of the froth-flotation section of the Grootegeluk coal-preparation plantBy P. E. Venteer
The Grootegeluk coal-processing plant treats 3 kt of raw coal per hour to produce a middlings fuel coal and a coking coal fraction with ash contents of 35 and 10 per cent respectively. The plus 0,5 mm
Jan 1, 1984
-
The Most Common Error In Applying ?Gy?s Formula? In The Theory Of Mineral Sampling, And The History Of The Liberation FactorThe modern theory of sampling of particulate minerals essentially consists of a recent generalization of the procedures for applying and calibrating the formula usually known as ?Gy?s Formula? for sam
Jan 1, 2002
-
SPOTLIGHT on the commissioning of metallurgical plantBy K. Levin, P. Lloyd
During the commissioning phase, which is usually the most exciting part of a project involving the design and construction of metallurgical plant, the commissioning engineers interact between the clie
Jan 1, 1981
-
New Opportunities ? Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces (0496ee01-222b-4cf7-b688-79441e60e149)By M. Hopf
The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallurgical applications has become increasingly common. The high cooling efficiency of copper
Jan 1, 2006