Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Kwaliteitsbeheer in die metallurgiese bedryfBy W. J. Kotzé
Die derde colloquium van die Spesialiste-afdeling van die SAIMM is op 19 November 1980by die Universiteit van Pretoria gehou en is deur sowat 40 mense bygewoon. Dr J. P. Hugo tree as Voorsitter op en
Jan 1, 1981
-
Learnings from development of an underground sub-level open stope mine below an open pitBy M. C. van Eeden, R. Vermeulen, K. B. Le Bron
This paper presents the lessons learnt during the transition from an open pit method to a sub-level open stoping method at the Koidu Limited kimberlite pipe. These learnings may assist other mines wit
Sep 1, 2025
-
In-Situ Measurements Of Pillar And Rockmass Behaviour In A Moderately Deep Hard-Rock MineBy M. U. Ozbay, D. R. Lougher
An in-situ experimental programme was carried out to improve the understanding of the rockmass and pillar behaviour in moderately deep hard-rock mines. The experiments were carried out at Impala Plati
Jan 1, 1995
-
Thermodynamic And Experimental Aspects Of Thallium Extraction From Liquid LeadBy Piotr M. Kapias
Keywords: extraction, lead refining, Pb-Tl solutions, PbCl2-TlCl solutions. The theoretical part of the paper presents an analysis of the conditions of Tl extraction from Pb using different extra
Jan 1, 2008
-
Surface Characterization Of A Heavy Mineral Sand With Micro-Raman SpectrometryBy S. Potgieter-Vermaak
The main mineral components of the so-called heavy sands (or black sand) are the titanium, zirconium and iron-bearing minerals, rutile, zircon and illmenite, accompanied by various minor and trace amo
-
Witbank-Middelburg Branch Annual General MeetingThe Annual General Meeting of the Branch was held in the Witbank Golf Club on Thursday, 28th August, 1969 at 5.00 p.m. Mr C. G. Sowry (Chairman) was in the Chair. There were also present: Ten
-
Calculation Of [?] And [s] ; Auxiliary Functions And Graphs - 6.1 General[The following notations will be used: O an ore body. W a sample of size w located in O; the size of this sample. W a block or a sample, of size W, located in O; the size of this block or sample.
Jan 1, 1978
-
Study of the effects of shaft pillar extraction on a vertical shaft located in highly stratified and poor quality rock massesBy G. du T. Judeel
An investigation was carried out to determine whether a numerical model could be constructed that would produce results that realistically represent actual ground deformations in and around a vertical
Jan 1, 2003
-
Production Schedule Optimisation In Underground Hard Rock Mining Using Mixed Integer Programming (f83c3c02-c68d-4272-b005-d08a2a0d5f65)There are presently no suitable underground mine production scheduling optimisation models available for application to sublevel stope mining. Scheduling underground production for maximum return is t
Jan 1, 2007
-
Slope stability at an opencast quartz mineBy I. J. A. Brackley
An investigation of the slope stability of a pit and failures of spoil dumps, carried out at Silicon Smelters quartz mine, Pietersburg, South Africa, is described. The major geological feature of the
Jan 1, 1985
-
Spotlight on APCOM 87By V. J. Moore
Introduction Although months have passed since APCOM 87, held from 19th to 23rd September, 1987, the vivid memories of all aspects of its activities remain as clear in one's mind as if it all ha
Jan 1, 1988
-
Experimental 3-D modelling of surface subsidence affected by underground mining activities - SynopsisBy J. Trcková
This paper describes the method of modelling rock mechanical problems on experimental models. Based on an actual experiment used as an example, assessment of the surface deformation due to undermining
Jan 1, 2009
-
An Integrated Expert And Vision System At BHP Billiton CanningtonAs part of a broad program to optimise the performance of their grinding circuit, BHP Billiton Cannington have installed an OCS© Expert system together with three VisioRockTM online particle size anal
Jan 1, 2007
-
An early appraisal of exploration projectsBy D. G. Millenbruch
An account is given of a four-phase system for the appraisal of a mineral project while it is still in the exploration stage, and for continual consideration of a favourable appraisal until the produc
Jan 1, 1979
-
Elevated Conveyors In Mining Applications - 1. IntroductionBy S. Curry
The Objana Cement Plant is located in central Nigeria, approximately 200km south of capital city Abuja (figure 1). It is the second largest cement plant in Africa, and the fifth largest in the world [
Jan 1, 2008
-
Collequium on 'Froth Floatation'By R. P. King
Held on the 22nd March 1972 at Kelvin House. Four papers were presented at this colloquium, which was attended by approximately 120 people. The first paper, 'Flotation Research Work at the
Jan 4, 1972
-
Electrokinetic solid-liquid separation of an ultrafine kimberlite suspensionBy W. Wilmans
Electrokinetic dewatering of kimberlite slime under constant direct curents of 0,5 to 2 A and dewatering under constant applied potentia Is of 16,5 to 46,5 V are considered. The combined efects of ele
Jan 1, 1987
-
Computer-aided Use of a Screening Process ModelBy G. Ferrara
The mathematical framework of a well-established model proposed earlier by the authors for the screening process is briefly recalled. Some numerical methods for the application of the model, concernin
Jan 1, 1987
-
Development And Testing Of An Underground Remote Refrigeration PlantBy D. J. Stanton
The objective of this study was to develop, install, and test a small underground mobile refrigeration plant (MRP) to deal with some of the real problems associated with mine cooling in an operating m
Jan 1, 2004
-
Economy-Wide Impact Of A Mineral Project In A Developing Country: A Graphic IllustrationBy G. D. Schena
The issue of evaluating the economic impact of large mineral projects in developing countries was studied by the use of econometric models. The evaluating system is demonstrated by its application to
Jan 1, 1993