Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Flow Behaviour And Drag Reduction Of Fluidic Ash-Water SlurriesBy P. Vlasak, Z. Chara
Since the flow behaviour of slurry containing both coarse and very fine particles has not been sufficiently clarified, the paper focuses on the experimental study of the particle size distribution, ti
Jan 1, 2007
-
A quality classification of building stones from P-wave velocity and its application to stone cutting with gang saws - SynopsisBy S. Kahraman
P-wave velocity measurements were carried out on 22 large limestone blocks in a stone processing plant. In the laboratory, P-wave velocity of core samples was measured to obtain intact rock velocity.
Jan 1, 2007
-
Scraper winch pull force investigationBy D. Janicijevic
This paper describes the process of scraper winch pull force measurement and shows the results of the actual winch pull force in extreme stall situations as well as during the face and gulley cleaning
Jan 1, 2008
-
An Alternative Pillar Design MethodologyBy R. W. O. Kersten
"The aim was to investigate stable pillar design procedures currently in use on chrome and platinum mines, subject them to a critical appraisal, and review some of the alternatives proposed in the lit
May 1, 2019
-
A Spatial Mine-to-Plan Compliance Approach to Improve Alignment of Shortand Long-Term Mine Planning at Open Pit MinesBy T. J. Otto, C. Musingwini
"The objective of any mining company is to sustainably maximize the net present value (NPV) throughout the life-of-mine (LOM). The expected NPV over the LOM is calculated based on a mine plan, yet the
Mar 1, 2019
-
Mine Planning (d3a3d1a4-3eb5-42a0-a100-700eebbf2b48)"Chairman: Professor J. Elbrond Rapporteur: Miss V. E. MartingPapers.Aids to planning production in coal mines by F. H. Deist and M. P. RobertsCapacity calculations, investment allocation and long-ran
Jan 1, 2014
-
Value chain based strategy formulation for mining technical systemsBy C. Lumley
The management of the Anglo Platinum (AP) mining technical systems (MTS) embarked upon a process of defining the strategy for the MTS department. The newly established department forms part of the gre
Jan 1, 2003
-
Some Advances in Lognormal TheoryBy H. S. Sichel
This study deals with the development of some new theory concerning the bias which will result from the employment of the t-estimator if in fact the underlying distribution of ore values is not lognor
Jan 1, 1987
-
A Validation Study of Gold Borehole Valuation Procedures Based on a Simulated OrebodyBy C. M. Suhr
n order to validate the borehole analysis valuation procedure commonly used in the South African gold mining industry, a simulated orebody was used to create borehole values which would serve as data
Jan 1, 1987
-
Mining An Open Pit Over And Through Old Sub-Level Caving Operations At Kwaggashoek East Open Pit, Thabazimbi Iron Ore MineBy C J. de Beer
The Kwaggashoek East pit is one of the four production areas of Thabazimbi Iron Ore Mine. The Kwaggashoek East Open pit mines through the abandoned sublevel caving operations of the Kwaggashoek East u
Jan 1, 2006
-
Behavior Of Continuous Casting Fluxes During Heating And CoolingBy J. Madias, E. Benavidez, E. Brandaleze, L. Castella
Knowledge of the physical and chemical properties as well as the behaviour of the mould fluxes during melting, important in order to improve continuous casting operations. Lubrication and control of h
Jan 1, 2004
-
Flyrock in surface mining–part 4. Adaptation of Gurney model to predict burden velocity, flyrock velocity, and explosive energy partitioning in benchBy T. Szendrei, S. Tose
The Gurney approach to explosive/inert material interaction was adapted to analyse the face velocity in bench blasting. The model is based on the blasthole diameter, rock and explosive density, burden
Jan 30, 2026
-
Toward discrete element modelling of material flow in submerged arc furnaces APCOM 2021By G. Akdogan, C. Bergmann, C. J. Coetzee, Q. G. Reynolds, S. J. Baumgartner
Submerged arc furnaces (SAF) are used extensively in the production of ferrochrome, where charge material – consisting of mixtures of carbonaceous reductants, fluxes such as silica, and ore in the for
Sep 1, 2021
-
Economic Modelling And Its Application In Strategic PlanningMining executives often have a difficult task determining what the strategic objective of the business should be as this can be impacted by the prevailing market conditions. In addition, they have no
Jan 1, 2010
-
Innovative Magnesia-Chrome Fused Grain Material For Non-Ferrous Metals Refractory ApplicationsBy D. Gregurek
The complexity of metallurgical processes in the non-ferrous metals industry. especially changes in the process conditions in combination with a diversity of metal processing furnaces, requires a prec
Jan 1, 2012
-
Underground Mine Scheduling Modelled as a Flow Shop: A Review of Relevant Work and Future ChallengesBy M. Åstrand, M. Johansson
"Advanced planning and automation are increasingly important in modern mines. Sophisticated methods for long-term mine planning are often used, and the advent of autonomous machines makes the actual o
Dec 1, 2018
-
Diamond Exploration and Mining in Southern Africa: Some Thoughts on Past, Current, and Possible Future TrendsBy W. F. McKechnie
"Southern Africa is generally thought to be well explored, with only limited potential for major new diamond discoveries. However, Chiadzwa in Zimbabwe and reports of a significant new kimberlite find
Feb 1, 2019
-
Empirical Model of Recovery Response of Copper Sulphide Circuit at Kansanshi MineBy F. K. Mulenga, M. Lusambo
"Geometallurgical models are a strategic tool used primarily in planning, diagnosis, and process optimisation. This paper discusses the development of a predictive model for flotation recovery at Kans
Nov 1, 2018
-
Foreword (5cd4104b-2719-4b5f-9b35-542aaddf3a8e)By Paul Fouche
The past decade has seen a tremendous revival of the base metal industry in Africa, coupled with an unprecedented increase in the prices of base metal commodities in the last couple of years. The them
Jan 1, 2007
-
Multivariate Resource Modelling For Assessing Uncertainty In Mine Design And Mine Planning ? SynopsisBy C. Montoya
This paper shows, through a case study, the impact of multivariate grade modelling upon mine design and mine planning. A deposit explored by drill holes is considered, in which the grades of five elem
Jan 1, 2012