Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Comparison of the fractography of rockbursts and impact structuresBy W. U. Reimold, R. Armstrong, R. G. Charlesworth
For many years rockbursts have plagued the mining industry. Although much research has gone into studying this phenomenon only a small proportion of it has been on the actual source mechanism. A study
Jan 1, 2003
-
A Technical And Operational Audit Of The First Ten Years Of The Teniente Converter Operations At Nkana SmelterBy M. Syamujulu
In 1994, Nkana smelter commissioned a multimillion US Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce the
Jan 1, 2005
-
Cut-off grade determination for the maximum value of a small Wits-type gold mining operationWork undertaken in the field of cut-off grade optimization has not advanced much beyond the work undertaken by Lane in 1988. His definitive work is based on the calculus of the Net Present Value crite
Jan 1, 2003
-
Unlocking Rustenburg Base Metals Refiners Sulphur Removal SectionBy M. Pelser, J. Hagemann
"The Anglo American Platinum Rustenburg Base Metals Refiners (RBMR) is the largest producer of nickel cathode in South Africa. It treats slow-cooled matte to recover a platinum group metal-containing
Jan 1, 2016
-
Performance Evaluation Of A New Stochastic Network Flow Approach To Optimal Open Pit Mine Design?Application At A Gold Mine - SynopsisThe optimal design of production phases and ultimate pit limit for an open pit mining operation may be generated using conventional or stochastic approaches. Unlike the conventional approach, the stoc
Jan 1, 2012
-
Recovery Plant Practice at De Beers Consolidated Mines, Kimberley, with Particular Reference to Improvements Made for the Sorting of Final ConcentratesBy M. J. King, W. K. B. Loftus, H. S. Simpson
SYNOPSIS The history of the early diamond fields and primitive methods of diamond recovery are traced, giving a brief description of the improvements made in final diamond recovery processes and tech
-
Navigating Above-The-Ground Risk In The Platinum Sector - SynopsisBy A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Jan 1, 2013
-
Navigating Above-The-Ground Risk In The Platinum Sector (596af1fa-f653-4318-b2be-d27da8918b80)By A. Lane
The socio economic risks of mining in South Africa have been emerging for some time now, and have been brought into sharp relief by recent events in the platinum sector. The slow pace of social uplift
Mar 1, 2013
-
Lowered Expectations: The Impact Of Yield Stress On Sand Transport In Laminar, Non-Newtonian Slurry Flows (db234ae4-9636-4048-baa8-d2e179ef9ec7)By R. G. Gillies
The pipeline transport of paste, backfill or thickened tailings slurries is an important component of the tailings disposal process in many mines around the world. These mixtures contain significant f
Jan 1, 2007
-
Regularization - 5.1 IntroductionIn the previous chapters we did not concern ourselves with the fact that the geostatistical properties of the regionalized variable x (z) are affected by the size of the support w. Ideally, when analy
Jan 1, 1978
-
Book news1. USSR co-operation International Mining, the London-based publication, has received USSR Government approval to publish a Russian language edition for circulation in the Soviet Union. 2. Mintek publ
Jan 1, 1988
-
Key Results Of The Initial Environmental Risk Assessment For Chromium III Compounds And Chromium MetalBy E. Pezennec
A voluntary comprehensive environmental Risk Assessment was launched at the end of 2004 by the International Chromium Development Association. The completion is scheduled for mid 2006.EURAS, a leading
Jan 1, 2007
-
Experimental and numerical modelling of the tunnel face stabilityBy J. Trckova, P. Prochazka
Physical models from equivalent materials satisfying geometrical and physical similarity have been constructed. A special technology of simulating the excavation of an opening at the front part of a t
Jan 1, 2003
-
Educating The Future Mining Engineering Practitioner - IntroductionBy R. Webber-Youngman
The Department of Mining Engineering at the University of Pretoria accepts that the process of teaching and learning improvement is an ongoing exercise with the ultimate aim to deliver well-rounded mi
Jan 1, 2011
-
Incline Caving As A Massive Mining MethodBy D. D. Munro
Finsch Mine is a kimberlite diamond mine located at Lime Acres in the Northern Cape Province of South Africa. The mine was founded in 1961 and started surface mining in 1964. Underground production co
Jul 1, 2013
-
Proceedings, 108th Annual General Meeting, 2005The 108th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Thursday, 11 August, 2005. Welcome
Jan 1, 2005
-
Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)By H. Kotzé
Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid
Jan 1, 2006
-
Notice Water Year 1970The Water Year Office for South Africa has supplied a provisional list of scientific congresses and meetings due to be held during 1970 with "Water" as the main or secondary theme, as follows: Febr
-
Is Platinum Paying Its Rent?By L. C. Stilwell
The paper will attempt to identify the threats, however obscure, that could confront the South African platinum industry. South Africa has the largest reserves of platinum group metals in the world,
Jan 1, 2006
-
Prediction of hydrocyclone performance using artificial neural networks - SynopsisBy M. Karimi
Artificial neural networks (ANNs) have found their applications in the modelling of unit operations of mineral processing plants. In this research, laboratory-scale tests were conducted, using a three
Jan 1, 2010