Three-dimensional measurement and simulation of the dewatering behaviour of flocs and sediments using X-ray microtomography - SynopsisBy X. Jia
The ability to perform three dimensional imaging at micron-scale resolution of real mineral floc sediments and structures using commercially available Micro X-ray Tomography (XMT) instrumentation can
Jan 1, 2008
-
Educating mining engineers online (APCOM 2003)By T. S. Golosinski
The paper reviews current status of online education related to mining, and reports on the online Master of Engineering programme in Mining Engineering that is offered at the University of Missouri-Ro
Jan 1, 2003
-
Design?a strategic issue - SynopsisA set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and c
Jan 1, 2009
-
Development And Testing Of An Underground Remote Refrigeration PlantBy D. J. Stanton
The objective of this study was to develop, install, and test a small underground mobile refrigeration plant (MRP) to deal with some of the real problems associated with mine cooling in an operating m
Jan 1, 2004
-
Reinforced Cemented Tailings FillBy L. Dison
There are many potential uses in gold mining for an initially stiff element of backfill that will yield at a predetermined load and maintain that load to beyond a compression of 30%. Such elements cou
Jan 1, 1988
-
Ferroalloy Design, Ferroalloy Selection And Utilization Optimization With Particular Focus On Stainless Steel Materials - SynopsisBy C. -J. Rick
The ferroalloy market is characterized by a very long communication distance between the consumer and the producer. This has created a situation where it has been difficult to change ferroalloy proper
Jan 1, 2010
-
Granulation Of Titania SlagBy P. Beukes, D. Bessinger, R. Glenewinkel
High titania slag is produced by the smelting of ilmenite and a suitable carbonaceous reductant in electric furnaces. Currently liquid slag is cast into large blocks, which take about 10 days to cool
Jan 1, 2007
-
Optimisation Of Flotation Circuit Configuration At PT Newmont Nusa Tenggara (cfd7ecd0-efe3-4487-b843-71559e2ce6be)Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover
Jan 1, 2007
-
An evaluation of gravity separators by use of a synthetic oreBy R. N. Guest
The Tromp distribution curve was used in an evaluation of gravity separators treating a synthetic ore made up of silica and marker minerals of various relative densities. The results pinpoint differen
Jan 1, 1985
-
Predicting The Values Of Flow Parameters For The Design Of Pipelines Conveying Backfill SlurriesBy I. C. R. Gilchrist
A principal requirement in the design of a backfill transportation pipeline is the accurate prediction of the values of key slurry flow parameters. Input variables, such as particle size and solids co
Jan 1, 1988
-
n Oorsig oor die biologiese behandeling van sianiedbevattende afvalwater* (A review of the biological treatment of cyanide-bearing waste water)By J. H. deur Potgieter
This paper, 'A review of the biological treatment of cyanide-bearing waste water' discusses the necessity for the treatment of cyanide-bearing waste water with a view to the avoidance of env
Jan 1, 1991
-
Spatial Distribution of ProbabilitiesBy F. E. Steffens
The application of kriging in assessing the area rainfall in a weather modification experiment is complicated by the presence of many zero rainfall recordings on a given day, and the fact that the var
Jan 1, 1987
-
Interaction Of Slurry Pipe Flow With A Stationary Bed (eab14233-2963-4b47-b514-ae051e43ba35)By V. Matou?ek
The paper addresses pipe flows of aqueous medium-sand slurries at velocities lower than the deposition-limit velocity. Laboratory test results including measurements of particle concentration distribu
Jan 1, 2007
-
Steady-state Simulation and Microcomputers: Meeting and ChallengeA powerful, interactive metallurgical process simulator for use on micro- computers has been developed in the Department of Metallurgy and Materials Engineering at the University of the Witwatersrand.
Jan 1, 1987
-
Proceedings, 114th Annual General Meeting, 2011The 114th Annual General Meeting of The Southern African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Thursday, 11 August 2011. Welco
Jan 1, 2011
-
Multi-Mineral Cut-Off Grade Optimization By Grid SearchBy E. Cetin
Orebodies that contain more than one economically important mineral are generally evaluated by parametric cut-off grades. This approach often leads to mis-valuation of mineral deposits because cut-off
Aug 1, 2013
-
The design of a stoping scraper scoopBy P. van Niekerk, V. J. Solomon
Improvements in the drilling and blasting techniques used in the stopes of narrow reefs have caused the clearing of broken rock to become the major cause of delay in the achievement of a regular cycli
Jan 1, 1979
-
The limitations of gold-mine evaluationBy P. R. Jamisch
The limitations of gold-mine evaluation by P. R. JANISCH, B.Sc. (Sur.) (Natal) (Visitor) Inherent uncertainty in the choice of parameter values places theoretical and practical limitations on the inte
Jan 6, 1976
-
Evaluation Of Reductants Used For Ilmenite Smelting Based On CO2 Reactivity (Boudouard Reaction) Measurement - SynopsisBy P. Jordan
The practice of ilmenite smelting in electric arc furnaces has been researched and published over the last few decades. An issue that has not been addressed is the understanding of the properties of i
Jan 1, 2011
-
Evaluation Of Cemented Tailings BackfillBy I. H. Clark
In some mining situations, backfills are not only required to be free-standing but are also expected to provide hangingwall support. It may therefore be specified that the backfill withstand a certain
Jan 1, 1988