Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Performance Update Of Hot Dip Galvanizing In The Corrosive Environment Of South African Gold MinesBy R. E. Wilmot
This paper is based on the experiences, over many years, on the part of numerous authors in the South African mining industry and that of the hot dip galvanizing process and its application as a corro
Jan 1, 2006
-
Automated Structure Mapping Of Rock FacesBy M. K. Elmouttie, G. V. Poropat
Mapping of exposed rock walls provides data on geological features such as joints, bedding planes, faults etc critical to the economics and the safety of mine operations. Traditional, manual methods o
Jan 1, 2006
-
The Road To NPV+By R. Hummel
When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with
Jan 1, 2001
-
Mine seismicity: prediction or forecasting? - SynopsisBy S. M. Spottiswoode
Much as one hopes to predict whether damaging seismicity might occur somewhere in the next shift, this is not possible at present. Recently, an analysis of seismicity at two mines has shown that a sma
Jan 1, 2010
-
Some Rock Engineering Aspects of Multi-Reef Pillar Extraction on the Ventersdorp Contact ReefBy D. F. Malan, J. C. Esterhuyse
"Mining in the Carletonville area of the Witwatersrand Basin predates 1934. Owing to the depletion of higher grade ore, the current activities focus increasingly on the extraction of lower grade secon
Dec 1, 2018
-
An Update to the Strain-Based Approach to Pit Wall Failure Prediction, And a Justification for Slope MonitoringBy W. Newcomen, G. Dick
"Effective management and mitigation of pit slope instability in open pit mines begins with a comprehensive slope monitoring programme. The ability to differentiate between non-critical pit wall movem
Jan 1, 2016
-
An Empirical Long-Term Commodity Price Range for Mineral Reserve Declarations to Minimize Impairments in Gold and Platinum MinesBy V. Maseko, C. Musingwini
"When considered collectively, Mineral Resources and Mineral Reserves are arguably a key asset for any mining company. Mineral Reserves are the economically mineable portions of Mineral Resources. The
Mar 1, 2019
-
Acclimatizing Men to Heat in Climatic Rooms on MinesBy C. H. Wyndham, N. B. Strydom
Discussion C. G. Hinds (Member): The climatic chamber at Kloof Gold Mine was built to the design referred to in the paper presented by Professor Wyndham and Dr Strydom. As no suitable underground fa
Jan 10, 1969
-
Optimizing Shaft Pressure Losses Through Computational Fluid Dynamics ModellingBy W. J. Kempson
As a result of the rising electrical energy costs in South Africa, a method was sought to reduce the overall electrical consumption of typical shaft systems. A typical shaft configuration was analysed
Dec 1, 2013
-
Cracking A Hard Nut: An Overview Of Lonmin?s Operations Directed At Smelting Of UG2-Rich Concentrate BlendsKeywords: Pyrometallurgy, furnace, Lonmin, platinum, PGM, UG2 Lonmin, earlier than any other primary platinum producer, had to deal with the concentrating and smelting of UG2-rich ores and concent
Jan 1, 2011
-
DC Furnace Containment Vessel Design Using Computational Fluid DynamicsBy M. Shapiro, L. A. le Grange, B. Henning
Effective pyrometallurgical process vessel design requires accurate assessment of the heat fluxes through the walls of the furnace. This is particularly important for freeze lining operation which is
Jan 1, 2004
-
Applicability of the risk ranking methodology designed for water reservoirs to tailings storage facilitiesBy N. Nišić, A. Cvjetić, V. Jovanović, D. Knežević, D. Nišić
The risks associated with operating water reservoirs and tailings storage facilities (TSFs) are different because of their different purposes, methods of construction and operation, and characteristic
Nov 30, 2022
-
Spectral Interferences in ICP-OESBy J. N. Baloyi
"In atomic emission and atomic absorption spectrophotometry, the sample is heated to a high temperature and thereby decomposed into atoms and ions that absorb or emit visible or ultraviolet electromag
Jan 1, 2014
-
Effect of lignosulfonate dispersant on high-clay content tailings structure, M.R. MacIver, H. Alizadeh, and M. PawlikBy M. R. MacIver, M. Pawlik, H. Alizadeh
Treatment of tailings is an integral component of mineral processing. Tailings with a high clay content are a challenge for the mineral processing industry; e.g. the clay slimes produced from producti
Jan 1, 2020
-
Process fault detection using basic singular spectrum analysis and Kernel Density Estimation, S. KrishnannairBy S. Krishnannair
Singular Spectrum Analysis (SSA) is an effective data-adaptive multimodal tool for monitoring chemical processes. However, monitoring multiscale signals using principal component analysis obtained fro
Jan 1, 2020
-
Optimized Multivariable Control Of An Industrial Run-Of-Mine Milling CircuitBy D. G. Hulbert, I. K. Craig, S. P. Moult
This paper describes the application of a throughput-optimization strategy to a run-of-mine (ROM) mining circuit that is controlled by a multivariable controller. The objective of the optimization str
Jan 1, 1992
-
Threshold blasting: The renaissance of explosives in narrow reef miningBy N. Kernahan, T. Zaniewski
Threshold blasting involves the use of small amounts of high explosive to break and fragment hard rock without having to evacuate mining personnel. The method is easily assimilated and effective in ro
Sep 1, 2001
-
The design, erection, and commissioning of the froth-flotation section of the Grootegeluk coal-preparation plantBy P. E. Venteer
The Grootegeluk coal-processing plant treats 3 kt of raw coal per hour to produce a middlings fuel coal and a coking coal fraction with ash contents of 35 and 10 per cent respectively. The plus 0,5 mm
Jan 1, 1984
-
Simulation Of Fracture Growth Around Openings In Highly Stressed, Brittle RockBy M. W. Hildyard, J. A. L. Napier
The improved design of support systems and stoping strategies when changes in depth, stratigraphy, or mine layouts are considered must rely on the designer's fundamental understanding of the de
Jan 1, 1992
-
The New ANSI/HI Centrifugal Slurry Pump StandardBy G. R. Addie, A. S. Roudnev
The Hydraulic Institute has completed the task of developing a new ANSI/HI standard 12.1-12.6 (2005) for rotodynamic (centrifugal) slurry pumps covering nomenclature, definitions, applications, and op
Jan 1, 2007