Disturbance Assessment at the Wall of a Vertical Blasted Shaft in MarlsBy J. P. Piguet, Y. Wileveau
ABSTRACT : An experimental programme for damage assessment was performed in the vicinity of the main shaft of Andra’s Underground Research Laboratory, currently under construction in the East of Franc
Jan 1, 2003
-
Longwalling At Great Depth In A Geologically Disturbed Environment - The Way ForwardBy F. Russo-Bello
TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below
Jan 1, 2000
-
The Implementation Of New Technology In Southern African Mines: Pain Or PanaceaBy A. S. Macfarlane
The introduction of new technology into mining operations is seen as a strategic necessity by many mining companies, in order to improve safety and to improve operational effectiveness. Many attempt
Jan 1, 2001
-
Feasibility studies of the on-stream analysis of lead in mineral slurriesBy S. K. Kawatra
Feasibility studies of the on-stream analysis of lead in mineral slurries by S. K. KAWATRA. P. Eng. (Canada). Ph.D. (Australia). M.Sc. (India) (Visitor) Instruments for the measurement of lead in mine
Jan 8, 1976
-
Analysis of a rock slope failure in a feldspar open pit mineBy G. Iabichino, M. Cravero, F. Nacci, L. Rinaldi, L. Vigliero
ABSTRACT: The proposed paper is aimed at analysing the failure of a steep cliff slope that, in the past, was exploited for open pit mining operations. A volume of over 400,000m3 of gneissic aplitic ro
Jan 1, 2003
-
New Technologies In The Concentration Of PGM Values From UG-2 OresBy M. A. W. Bryson
It is well documented that a significant amount of the new PGM (Platinum Group Minerals) production that is coming on stream now, and over the next few years, is to come from the UG-2 reef. Clearly th
Jan 1, 2004
-
Modelling the Non-linear Behaviour of Fractured Seams in Deep Gold MinesBy R. K. Brummer
A simplified two-dimensional plane strain numerical technique for the non- linear modelling of a tabular mining excavation in brittle host rock under high stress conditions is described. The model has
Jan 1, 1987
-
Mass Exchange At The Metal-Slag Interface In The Continuous Casting ProcessBy P. R. Scheller
Reactions between metal and slag are of decisive importance for metallurgical processing. In the continuous casting process, where metal solidifies at the metal-slag interface, reaction products can c
Jan 1, 2004
-
Spontaneous combustion of the organic mater in discards from the Witbank coalfieldBy R. M. Falcon
The paper opens with a summary of the major factors responsible for spontaneous combustion in coal discards. These include heat arising from the oxidation of coal and pyrite, and from the weting of dr
Jan 1, 1986
-
Refining Testwork On Crude Magnesium Produced In The Mintek Thermal Magnesium ProcessBy M. Abdellatif
Keywords: Magnesium, pyrometallurgy, Mintek Samples of crude magnesium produced by the Mintek Thermal Magnesium Process were refined in two stages. The first stage consisted of co-melting of batc
Jan 1, 2006
-
Erosion, corrosion, and abrasion of material-handling systems in the mining industryBy A. M. F. Carter
A survey was conducted so that the degree of corrosive, erosive, and abrasive attack on material-handling systems in the mining and mineral-processing industry could be assessed, and so that the areas
Jan 1, 1986
-
Design Rules For Avoiding Draw Horizon Damage In Deep Level Block CavesDeep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful
Jan 1, 1999
-
Hybrid finite-/discrete-element modelling of progressive failure in massive rock slopesBy H. Willenberg, J. S. Coggan
ABSTRACT: Although individually both continuum and discontinuum numerical analyses provide useful means to analyze rock slope stability problems, complex failures typically involve mechanisms related
Jan 1, 2003
-
Micro-seismic events: an aid in studies of deep-mine rock structuresBy T. O. Hagan
A system for the monitoring of micrcoseismic events. which is designed for use in feasibility studies of rock-burst prediction, has been operating at Western Deep levels Limited since 1977. Analyses h
Jan 1, 1981
-
The Use Of Material-Balance Smoothing In The Evaluation Of Backfill OperationsBy A. Hinde, M. Moys, L. C. Woollacott
The material-balance smoothing technique is applied directly to the problems associated with the evaluation of the performance of backfill-preparation plants. A computer package specially designed to
Jan 1, 1992
-
Industrial Applications Of Hydrohoist Systems In The Power Industry And Alumina PlantsBy J. Baklík, V. Rak, W. Kolarcík, Z. Franc
The paper deals with hydraulic transport of thin and dense slurries. Based on mathematical modelling of three-phase flow, dynamic properties of the systems for pumping of thin slurry are solved. Theor
Jan 1, 2007
-
The application of short-delay electric blasting in an up-dip stopeBy M. U. Özbay
A series of blasting experiments was carried out in an up-dip stope of a gold mine using short-perioddelay electric detonators. The main object of the investigation was to show the interactive effects
Jan 1, 1985
-
The estimation of fragmentation in blast muckpiles by means of standard photographsBy H. Van Aswegen, C. V. B. 0unningham
The need for the more accurate measurement of blasting results has increased substantially with the proliferation of the types of explosives available to mining operations in South Africa. The primary
Jan 1, 1986
-
A note on the simulation of seismic activity in the Klerksdorp areaBy R Kersten
The note describes an exercise on the simulation of the frequency and size of seismic events on the basis of the frequency distribution of the events and their inter-arrival times (Le. the frequency d
Jan 1, 1985
-
Computer Support in Scheduling the Iscor Grootegeluk Coal Mine - A Case StudyBy A. P. L. Kotzé
Modelling and scheduling for Grootegeluk coal mine, situated in the north- western Transvaal, is by means of a series of modular systems. Modelling of the multilayered body, which is part of the Water
Jan 1, 1987