Spotlight on Councillors' Visit to Franz Hoenig HausBy John Freer
As an innovation on the annual programme, the Excursions Sub-Committee organized a social get together of the Institute's Councillors and their families on Sunday, 27th February, 1983. Asian Mini
Jan 1, 1983
-
SPOTLIGHT on the Western Cape BranchThe inaugural meeting of the Western Cape Branch of The South African Institute of Mining and Metallurgy was held on Thursday evening, 13th November, 1986, in the Department of Chemical Engineering at
Jan 1, 1987
-
Literature review on the influence of weld-heat inputs on the mechanical and corrosion properties of duplex stainless steelsBy F. P. A. Robinson, J. W. Fourie
Austenitic stainless steels are welded using low-heat inputs. However, owing to differences in the physical metallurgy of austenitic stainless steels and duplex stainless steels, low-heat inputs shoul
Jan 1, 1990
-
The Application Of Viscometry To The Hydraulic Transport Of Backfill MaterialBy P. T. Slatter
The role of viscometers for rheological characterization in the hydraulic transport of solids is discussed, and rheological models and phenomena pertinent to the hydraulic transport of backfill materi
Jan 1, 1988
-
DEM simulation of particle bed comminution at grain size level M. Klichowicz and H. LieberwirthBy H. Lieberwirth, M. Klichowicz
The comminution at grain size level for the liberation of valuable minerals usually requires the highest size-specific energy. Therefore, the full understanding of the comminution process at this leve
Jan 1, 2020
-
The necessity of 3D analysis for open-pit rock slope stability studies: Theory and practiceBy A. McQuillan, N. Bar
Geotechnical models developed during the planning stages of open pit mines are three-dimensional so as to capture the spatial variation in lithological, structural, hydrogeological, and geomechanical
Feb 6, 2023
-
Spiral conditions for the recovery of ultra-fine particles, F. Bornman, R. Foisy, and N. NaudeBy N. Naude, R. Foisy, F. Bornman
Spiral separators have been widely accepted as one of the most flexible gravity separation devices for several decades. The International Journal of Mineral Processing, 84, pp. 118 – 132 mentioned tha
Jan 1, 2020
-
Innovative Hydrogen Production By Reaction Integrated Novel Gasification Process (HyPr-RING)By S. Lin
A new hydrogen production process, named the HyPr-RING, has been proposed. Fundamental concept of the HyPr-RING is integration of water carbon reaction, water-gas shift reaction and CO2 absorbing rea
Jan 1, 2001
-
Optimisation Of SiMn Production At TransalloysBy J. Griesel, P. H. F. Bouwer, K. Bisaka
Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon
Jan 1, 2004
-
Liquidus temperature and viscosity of melter slagsBy M. Somerville, S. Sun
The liquidus temperature and viscosity of a range of melter slags produced in South Africa were determined. Drop-quench experiments were carried out on the supplied plant samples to determine the liqu
Jan 1, 2004
-
J Acid Plant Capacity Increase - 1. IntroductionBy Siyabonga Malevu
Chemical Initiatives? Umbogintwini plant is the production facility of Chemical Initiatives? business. Umbogintwini?s J Plant manufactures sulphuric acid. The plant was designed and built by Simon Car
Jan 1, 2009
-
Factors affecting the resistivity and reactivity of carbonaceous reducing agents for the electric-smelting industryBy H. M. Dus, D. J. Smith
Resistivity tests indicated that, at temperatures lower than 1450°C, reducing agents alone, as well as burdens consisting of high-carbon ferrochromium and reducing agents, exhibit wide differences in
Jan 1, 1980
-
Recovery of gold from ashed woodchipsBy M. W. John, I. D. Matthews
SYNOPSIS This paper describes the process adopted for the recovery of gold from a dump originating from clean-up operations at Durban Roodepoort Deep Gold Mine. The gold-bearing dump material was ref
Jan 1, 1990
-
The reduction of fluxed and non-fluxed manganese, ores by ferromanganese silicideBy W. P. Channon, J. B. See
The reduction of fluxed and non-fluxed manganese, ores by ferromanganese silicide by W. P. CHANNON, B.Se. (Eng.), M.Sce. (Eng.) Wits. (Visitor) and J. B. SEE, B.Sce. Hons., Ph.D. (New South Wales), M.
Jan 3, 1977
-
Materials for Winding Plant ComponentsBy G. T. van Rooyen
Materials for Winding Plant Components By Prof. G. T. van Rooyen (ScD) (MIT). Materials for critical applications such as winding plant components are reviewed in terms of the basic requirements which
-
Electrokinetic solid-liquid separation of an ultrafine kimberlite suspensionBy W. Wilmans
Electrokinetic dewatering of kimberlite slime under constant direct curents of 0,5 to 2 A and dewatering under constant applied potentia Is of 16,5 to 46,5 V are considered. The combined efects of ele
Jan 1, 1987
-
The first six years of the Chemwes uranium plantBy M. S. Janssen, J. L. Taylor, M. A. Ford, E. B. Viljoen, H. A. Simonsen
The Stilfontein and Buffelsfontein Gold Mines, near Klerksdorp in the Transvaal, had accumulated a large amount of uranium-containing residue and, when the price of uranium rose in the 1970s, consider
Jan 1, 1987
-
Hydraulic Scale-Model Tests For Slurry Handling EquipmentBy P. Goosen
The paper presents a basic summary of the approach to hydraulic scale-model tests as may typically be applicable to slurry flow situations. A case study is presented illustrating how hydraulic scale-
Jan 1, 2007
-
Interactive Graphic Mine Planning Work StationBy R. M. Kear
The Mine Planning Department of Rio Tinto Management Services South Africa has installed an interactive graphic work station to assist with the long- term mine planning of Palabora. Previously, the pl
Jan 1, 1987
-
Compaction Tests on Coking Coals. Part 2: Pilot-Plant-Scale Compaction with a 60-ton Hydraulic PressBy G. Coetzer
"Prior to operating a non-recovery coke pilot plant oven, it was essential to ascertain coal cake stability during the loading of a 1 m3 (1 m × 1 m × 1 m) coal cake into the cold pilot-plant oven by a
Apr 1, 2019