Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Challenges Of Infrastructure Development In The Eastern Limb Of The Bushveld Complex Of South Africa - SynopsisBy G. L. Smith
As the Platinum mining industry expands in the Eastern Limb of the Bushveld Complex it is increasingly evident that a major constraint to development is a lack of appropriate infrastructure. Of criti
Jan 1, 2008
-
Development Of An Antivibration Handle For Pneumatic Jackleg Rock DrillsBy Pierre Marcotte
Jackleg rock drills expose their operators to high hand-arm vibration levels. To address this problem, an antivibration handle has been developed. The antivibration properties of the handle were achie
Jan 1, 2008
-
Key Production Drivers In In-Pit Crushing And Conveying (IPCC) Studies - 1. IntroductionBy Phil Morriss
During the last 12 months, Sandvik?s Technical Service Group has carried out nine Scoping and Pre-feasibility studies for the application of In-pit crushing and conveying (IPCC) for large mining compa
Jan 1, 2008
-
Determining concentration and velocity profiles of non-Newtonian settling slurries using electrical resistance tomography - SynopsisBy A. P. N. Sutherland
Pipelines for transporting high concentration slurries are often designed using methods applicable to homogeneous non-Newtonian laminar flow. Many industrial slurries though comprise coarse particles
Jan 1, 2008
-
Field observations and numerical studies of horizontal stress effects on roof stability in US limestone mines - SynopsisLimestone formations in the United States can be subject to relatively high horizontal stresses due to the existence of tectonic loading of the limestone strata. Underground limestone mines use the ro
Jan 1, 2008
-
Estimating the modulus of elasticity of the rock material from compressive strength and unit weight - SynopsisBy I. Ocak
The modulus of elasticity of rock material (Ei) is an important rock property that is used as an input parameter in the design stage of engineering projects such as dam and tunnel constructions, minin
Jan 1, 2008
-
Importance of pore pressure monitoring in high walls - SynopsisBy K. L. Morton
Groundwater and associated pore pressure represent elements that can have a negative impact on surface mining and slope stability. Groundwater flow and deformation within a slope influence each other.
Jan 1, 2008
-
Merensky pillar strength formulae based on back-analysis of pillar failures at Impala Platinum - SynopsisBy B. P. Watson
The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies and strike for many hundreds of kilometres. Mining is extensive, with depths ranging from clos
Jan 1, 2008
-
Cooling power for a new ageAnglo Platinum is in the process of introducing a number of initiatives, varied in nature, on a scale that will impact operations in the short, medium and long-term. The advent of mechanization on a l
Jan 1, 2008
-
Some aspects of international shotcreting practice ? SynopsisBy A. Boniface
The International Tunnel and Underground Space Association (ITA) has a number of working groups (WG) that meet at least once a year. One of these is WG12, ?Use of Shotcrete?, of which the author is a
Jan 1, 2008
-
Strategic factors and a model of enterprise restructuring in the coal industry in Europe with emphasis on experiences in a Slovenia-Velenje coal mine case - SynopsisBy E. Dervaric
The main purpose of this paper is to introduce the main strategic restructuring aspects of companies that are directly (coalmines) or indirectly (companies that depend on coalmines) linked to coalmini
Jan 1, 2008
-
Los Bronces Development ProjectBy Nelson Sánchez
The Los Bronces Development Project (LBDP) was approved in October 2007 by the Anglo American plc Board at a capital cost of some US$1.74B, and is scheduled to be completed by the end of 2010. The pro
Jan 1, 2008
-
Value Driven Resource Allocation And Focus In The Early Stages Of Project DevelopmentBy M J. Van Der Merwe
The mining industry is facing a serious skills resource shortage, growing commodity demand and cyclical prices. This makes focus and allocation of resources in the early stages of project development
Jan 1, 2008
-
Developing a tapblock diagnostic systemBy L. Gunnewiek
An advanced real-time monitoring system called the tapblock diagnostic system (TDS) has been developed. The purpose of the TDS is to help furnace operators manage the safe operation and economical mai
Jan 1, 2008
-
The Alkaline Sulfide Hydrometallurgical Separation, Recovery And Fixation Of Tin, Arsenic, Antimony, Mercury And GoldBy C. G. Anderson
Throughout the world, there are many orebodies or materials which have significant value but also contain arsenic, antimony, and mercury. As regulations on the transport, exposure, disposition and em
Jan 1, 2008
-
Recovery of unburned carbon by conventional flotation of bottom ashes from Tuncbilek Thermal Power Plant - SynopsisBy A. Yamik
This research study includes studies carried out on the recovery of unburned carbon in the ashes of Tuncbilek Thermal Power Plant. Bottom ashes have been identified by X-ray diffraction and X-ray fluo
Jan 1, 2008
-
Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? SynopsisCaving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by
Jan 1, 2008
-
Increased Productivity Of Zinc Roasters And SO2 -QualityBy Pekka Taskinen
Advanced optimizing control of the fluidised bed zinc roaster has been in use for an extended period at Boliden Kokkola and the implications are seen as extended bed stability, increased throughput an
Jan 1, 2008
-
Towards electrode immersion control on Lonmin?s no. 1 circular furnace - SynopsisBy G. A. Georgalli
A control philosophy to be applied by Lonmin to maintain constant electrode immersion in their no. 1 circular smelting furnace is put forward. This control philosophy is facilitated though a combinati
Jan 1, 2008
-
An integrated and sustainable solution to ensure in-section dust compliance - SynopsisBy N. F. Mashinini
Optimization of current control systems, proper maintenance and efficient training of personnel are recommendations made to control the amount of dust that underground employees are exposed to on a da
Jan 1, 2008