Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Risk Management: Adapting Riskgate for Underground Coal Mines in the United States (46fa42ad-fbd5-47e4-a739-7d29843a05b2)By J. A. Restrepo, K. D. Luxbacher
"The U.S. underground coal mining industry has recently seen the occurrences of several multifatality events that have interrupted an otherwise steadily improving safety record. These events transpire
Jan 1, 2015
-
Risk Mitigation for Open Pit Mining in Areas With Underlying Old Underground WorkingsBy J. Duran
Mining at Phoenix is currently done by surface operation in the Fortitude and Bonanza Pits, at a combined rate of approximately 110,000 tons per day. A portion of the ore bodies targeted by these pit
Feb 23, 2014
-
Risk Mitigation For Openpit Mining in Areas With Old Underground Workings`By J. Duran
Mining at Newmont Mining?s Phoenix?s Mine is currently done by surface operation in the Fortitude and Bonanza pits at a combined rate of approximately 100 kt/d (110,000 stpd). A portion of the o
-
Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
-
Risk Mitigation In Global Mining DevelopmentBy Wayne W. Murdy
Since 1993, Newmont Mining has been growing through the development 'q of three major foreign mining operations with a fourth under construction. The first project, Yanacocha in Peru, began ope
Jan 1, 1997
-
Risk Mitigation In Global Mining Development Newmont Mining CorporationBy Wayne W. Murdy
Since 1993, Newmont has been actively growing through the development of three major foreign mining operations with a fourth under construction. The first project, Yanacocha in Peru began operating in
Jan 1, 1997
-
Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023By Jacob L. Mathis, Todd Tharpe, Jonathan Steflik, R. M. True
In June 2022, Louisville MSD completed a 6.5 km (4-mile), 6.1 m (20-foot) finisheddiameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. Durin
Jun 13, 2023
-
Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck
Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro
Dec 1, 2022
-
Risk Of Gastrointestinal Cancers From Inhalation And Ingestion Of AsbestosBy John Gamble
This paper summarizes the weight of epidemiological evidence to evaluate the hypothesis that asbestos exposure is causally associated with increased risk of gastrointestinal (GI) cancers as suggested
Jan 1, 2007
-
Risk Quantification in the Mineral SectorBy K. Bounou, K. Komnitsas
"Risk quantification may be used as a sustainable development index in the mining industry, since it encompasses both economic and social factors. In addition, it may assist in the development of a fr
Jan 1, 2005
-
Risk Ranking In Tunneling Projects With Fuzzy Electre MethodBy A. Yazadni-Chamzini
Risk ranking of projects is one of the importance parts of the complicated risk management procedure. Recognizing the riskiest criteria enable the managers to plan for risk reduction. The first stage
Jan 1, 2012
-
Risk Reduction and Performance Improvement through TBM RobotizationBy Salam Moubarak, Thomas Camus
"INTRODUCTION Since the introduction, several decades ago, of the first concepts of tunnel boring machines (TBMs), the unremitting increase of mechanized and automated tasks and the reduction of manua
Jan 1, 2016
-
Risk Related to PPP Tunneling Projects for Design ProfessionalsBy David J. Hatem
Tunnels and underground projects are inherently more risky than vertical projects, which typically utilize more conventional design and construction approaches and are undertaken in the context of rel
-
Risk Sharing Principles in Tunnel ContractsBy Eivind Grøv
"INTRODUCTION Tunneling and underground excavation is related to handling of uncertainties, risks associated with geological conditions are significant and ‘unexpected geological conditions’ often cla
Jan 1, 2016
-
Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda
The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se
Jun 13, 2023
-
Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest InterceptorBy Samuel J. Gambino
Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p
Jan 1, 2008
-
Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda
The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio
Jun 23, 2024
-
Risk-Management Process for Tailings ControlBy Franco Oboni, Iain G. Bruce
The design of tailings containment structures relies on well-understood engineering methods being applied consistently. Unfortunately, not all facilities are designed or managed to the same level of
Jan 1, 2002
-
Riverside Badlands Tunnel, Inland Feeder Project: The Challenges Between Concept and CompletionBy John Waggoner, Steve Klein, John Townsend, Jay Arabshahi
The Riverside Badlands Tunnel is a 13 km (8 mile) long segment of the Inland Feeder Project. This 3.65 m (12 ft) finished diameter water tunnel presented many challenges that had to be overcome to tak
Jan 1, 2003
-
Riyadh Metro Design and Construction - Design and Construction on the Fast TrackBy Henning Schwarz, Faisal Al Arifi, Anas Almousa
"The Riyadh Metro Project forms part of a complete new public transport system integrated in the urban planning and development of the fast growing capital city of the Kingdom of Saudi Arabia. The Des
Jan 1, 2016