Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Transfer Function Model Of Phosphate Heap LeachingBy M. Weatherspoon, S. Gebo, K. Prisbrey
Our objective was to develop a transfer function model of phosphate heap leaching for design, optimization and control. The procedure included analysis of time-lapse photography of a laboratory heap.
Jan 1, 2001
-
Transfer Of A Project Risk Register From Design Into Construction: Lessons Learned From The WSSC BI-County Water Tunnel ProjectBy R. J. F. Goodfellow
Many underground projects now include preparation of a Risk Register through planning and design as a tool for project and risk management. There is still significant discussion within the industry as
-
Transfer of German environmental expertise for mine site rehabilitation challenges worldwide - A case study: VietnamBy R. Barthel, O. Nitzsche, J. Pateiro Fernández, T. Cramer
The Hong Gai coal field in northeast Vietnam has been the main coal mining area of Vietnam for more than 150 years. Anthracite coal is produced from several open pit and underground mines situated clo
Jan 1, 2011
-
Transfer Risk - Accelerate Closure (Trac™ ): A Fixed-price Contract Program For Site Remediation/case ClosureBy Kevin Bell
The TRAC™ Program was developed to provide our clients with a mechanism that allows them to better manage site remediation and closure costs. This program provides a fixed-price contract for site rem
Jan 1, 1998
-
Transfer Station AnalysisBy Andrew I. Hustrulid
The discrete element method has successfully been used to model the behavior of material flow in transfer stations. With position, velocity, and applied forces for every particle and boundary in the s
Jan 1, 1998
-
Transformation Mechanisms Of Self Reducing – Fluxing Dried Greenballs Into Pig Iron NuggetsBy B. Anameric, S. Kawatra
Pig iron nuggets, which have similar chemical and physical properties with blast furnace pig iron, were produced by a single step heat treatment of self reducing – fluxing dried greenballs. During thi
Jan 1, 2007
-
Transformation Of Lignite Mining Regions: The German Strategy - SME Annual Meeting 2022By J. Kretschmann, K. van de Loo, J. Brune
In 2018, the German Federal government decided to phase-out the energy production using coal-fired power plants and to terminate lignite mining completely by 2038 at the latest. This decision will imp
Mar 2, 2022
-
Transforming HSE Performance It's Not Harder Than You ThinkBy B. Kraus
Many of us who have interacted with senior executives from leading oil and gas companies over the last few years on the subject of HSE performance have observed a marked shift in their engagement on t
Jan 1, 2011
-
Transforming Tintaya To a Private CompanyBy Lee Browne
The transformation of Peru’s Tintaya copper project from a state-owned company to a private company is under way and the results have been successful. Since Magma Copper Co. assumed operating managem
Jan 1, 1996
-
Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support FluidBy Britta Schoesser, Zdenek Zizka, Markus Thewes
"The support pressure of a slurry shield corresponds to the in situ earth and groundwater pressure to ensure the stability of the tunnel face. The support fluid (bentonite suspension) penetrates from
Jan 1, 2016
-
Transient Flows In Ventilation NetworksBy E. J. Jacques
A typical problem in ventilation networks with multiple fan systems is the possibility of them interacting. Multiple fan systems are no exceptions in complex tunnels, and may also be met in mines wher
Jan 1, 1995
-
Transient Simulation of Long-Distance Tailings and Concentrate Pipelines for Operator TrainingBy C. Cristoffanini
A real-time transient pipeline simulation was used to model the operational pressure response in the concentrate and tailings pipelines of the Minera Los Pelambres copper mine in Chile. A high-fidelit
Feb 23, 2014
-
Transients In Gas Concentration Within A System Of Controlled Recirculation In MinesBy G. Yang, M. J. McPherson, P. Mousset-Jones, G. Danko, F. Calizaya
In the last 20 years, studies on controlled flow recirculation in various countries have been carried out in both coal and metal mines. These studies have shown that in addition to economic gains, par
Jan 1, 1991
-
Transition and optimization of the Henderson mine ventilation systemBy C. Rutter, N. SHEA, K. KOLOBE
Henderson Mine’s primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014
-
Transition and Optimization of the Henderson Mine Ventilation System (Mining, Metallurgy & Exploration)By C Rutter, N Shea, K Kolobe
The Henderson mine, a panel cave mine in Colorado, has undergone multiple ventilation system changes to meet dynamic airflow needs. This paper explains the ventilation designs for different production
Mar 2, 2022
-
Transition Due To AgeThe successful exploration for Austin Taylor and Gen. McRae from 1931 to 1940 obscured the fact that I was reaching a period of transition. This was true both in personal and business life. It was pro
Jan 1, 1976
-
Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell
Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro
Jun 13, 2021
-
Transitions Between Micro- and Macro-EngineeringBy J. A. Herbst
Successful transitions from micro- to macro-engineering are the keys to effective technology transfer between research and development organizations and industrial end users. At the same time, it has
Jan 1, 1992
-
Transloading: A Case Study Of The Tucker Hill Perlite Project And Its Transloading TerminalBy Charles N. Speltz
The cost of transportation of industrial minerals frequently is higher than the cost of the product. When a mine, industrial-mineral plant, or customer is served by a single railroad, because of the l
Jan 1, 1999
-
Translucent Face Partition For Longwall Dust ControlBy Michael H. Leon, John A. Organiscak
Controlling worker dust exposure on longwall mining systems is difficult because the working face area serves as an immediate return during the mining cycle and the amount of airborne dust generated i
Jan 1, 1993