Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Design and Construction of the New Tunnel at Genting Sempah, MalaysiaBy S. J. Porter, M. T. McRae
The new tunnel at Genting Sempah is part of a privately funded infrastructure projectthat involves duplicating the existing highway extending from the Gombok Toll Plaza near Kuala Lumpur to Karak, in
Jan 1, 1997
-
Design and Construction of the Shoal Creek Raw Water Intake at Lake LanierBy D. Rendini, R. D. Gutridge
INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr
Jan 1, 2005
-
Design And Construction Of The Soudan 2 Detector LaboratoryBy D. Lee Petersen, Charles R. Nelson, Marvin Marshak
INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l
Jan 1, 1985
-
Design and Construction of the Weehawken Tunnel and Bergenline Avenue StationBy Leon J. Jacobs, Kyle R. Ott
This paper discusses design and construction aspects of the tunnel, shaft and station for the Weehawken Tunnel and Bergen line Avenue Station. The project consists of a 1,269 m (4,156 ft) long existin
Jan 1, 2003
-
Design and Construction of Tunnel and Shaft PlugsBy James W. Marold
Tunnel and shaft plugs have been designed to assist in construction of new and rehabilitation of existing tunnels and shafts. Tunnel plugs have been used to provide construction access for side by sid
Jan 1, 2008
-
Design And Construction Of Tunnel Built By Shield Of Rectangular Cross SectionBy Hidehiko Nakazaki, Sakuro Murayama, Mitsuo Miura, Masaaki Endo, Yoshiaki Hurukawa
This is a detailed report of construction experience of a tunnel built by a shield of rectangular cross section with reinforced concrete segments. In case of tunneling by a rectangular shield, there w
Jan 1, 1979
-
Design And Construction Of Uranium Disposal Facilities For The Panna Maria Project, TexasBy Rod A. Levander, Kenneth B. King
INTRODUCTION The Panna Maria Uranium Project is located in South Texas, between San Antonio and Corpus Cristi, approximately 10 kilometers (6 miles) north of Karnes City, Texas. The tailings dispos
Jan 1, 1980
-
Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent CriteriaBy P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz
Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea
Jan 1, 1989
-
Design And Construction Options For Surface Uranium Tailings ImpoundmentsBy A. MacG. Robertson
INTRODUCTION The tailings, or solid waste, remaining after uranium has been extracted from an ore and the liquid wastes associated with it contain both radioactive and other substances which, if re
Jan 1, 1980
-
Design and construction outlined of the Cannon mine tailings impoundmentBy Ian Hutchison, Ted Sluder, Jack Caldwell, Don Moore
Introduction The Cannon mine at Wenatchee, WA has recently been brought into operation to recover gold from the sandstones of the Swauk formation. The mine is a joint venture between Asamera Minerals
Jan 8, 1986
-
Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift MethodBy Paul H. Madsen, Victor S. Romero
The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo
Jan 1, 2001
-
Design and Construction Procurement for the Amtrak Hudson Tunnel ProjectBy Phil Rice, Mohammed Nasim, Richard Flanagan
"The Gateway Trans-Hudson Partnership (GTHP), a joint venture of WSP USA, Inc., AECOM USA, Inc, and STV Incorporated, is providing preliminary engineering services to Amtrak for the Hudson Tunnel proj
Sep 1, 2019
-
Design And Construction Service Tunnels On Palm Jumeirah IslandBy Ben Hayes, Michael Ryjevski
The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira
Jan 1, 2007
-
Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical ModelingBy Slawomir Bock
One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s
Jan 1, 2009
-
Design And Development Of A Mobile Mining MachineBy G. L. Dollinger, J. P. Kindsvater, J. A. Gibson
DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo
Jan 1, 1985
-
Design And Development Of An Underground Hardrock Mine With The Assistance Of Rock Mechanics SoftwareBy D. B. Apel
Rock mechanics software plays an important role during the design process of modern underground mines by allowing for verification of the stability of the planned excavations. The paper describes the
Jan 1, 2004
-
Design and Development of Novel Flotation Reagents for the Beneficiation of Mountain Pass Rare-Earth OreBy Pradip
Bastnaesite, a rare-earth fluocarbonate, was separated from associated calcite and barite gangue minerals in the Mountain Pass, CA rare-earth ore beneficiation plant by froth flotation using fatty aci
-
Design And Development Of The Northeast Layback Of The Betze-Post Open PitBy Nick Rose, Robert Sharon, Mark Rantapaa
Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio
Jan 1, 2005
-
Design and Development of the White Mesa Uranium MillBy Donald K. Sparling, C. Edwin Baker
The White Mesa uranium/vanadium mill is six miles south of Blanding, UT, on the Colorado Plateau, which has historically spawned more than 200 uranium mines. As uranium prices approached an all-time h
Jan 4, 1981