Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction
By M. D. Scott
Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972
Jan 1, 1976
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization Project
By H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Design, Development, Application, and Operating Benefits of 100-m3+ Outokumpu TankCell Flotation Cells
By Adolf J. Jonaitis
Outokumpu developed TankCell flotation cell technology beginning in 1990, following 35 years of successful flotation cell experience and application. In 1994, Outokumpu proved favorable operating succ
Jan 1, 1999
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring Machine
By Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Design, Installation And Effectiveness Of A Degasification System At The Pasta De Conchos Mine
By F. Gonzalez, A. Zambrano, J. Schwoebel, S. Kravits
Significant lost time delays were experienced by Carbonifera de Nueva Rosita, S.A. de C.V. ("CNR") during mining development of the Pasta de Conchos Mine ("the Mine") near Nueva Rosita, Coahuila, Mexi
Jan 1, 1993
-
Design, Installation And Operation Of The Pinto Valley Moly Flotation Columns
By R. Rodgers
The Pinto Valley Concentrator of BHP Copper Inc. restarted its sulphide mining operations in September 2007 to produce copper and moly concentrates. During the plant production ramp up, the copper/mol
Jan 1, 2010
-
Design, Operation And Control Of A Teeter-Bed Hydroseparator For Classification (August 2010 • Vol. 27 No. 3)
By J.N. Kohmuench
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Operation, And Control Of A Teeter-Bed Hydroseparator For Classification
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel
By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm Sinkhole
By Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project
By Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade
This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a
Jan 1, 2003
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023
By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Design-Build: Elevating Partnering to a Higher Level
By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring
The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value
Jan 1, 2003
-
Design/Build Agreement For The Niagara Tunnel Project
By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO
By Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Designing a final wall blast to improve stability
By J. P. Savely
This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b
Jan 1, 1987
-
Designing A Final Wall Blast To Improve Stability (PRIPRINT 86-50)
By James P. Savely
This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b
Jan 1, 1986
-
Designing a Geostatistical-Based U-Spatial Statistics Algorithm for the Separation of the Anomaly Area: Application at Baghqloom Porphyry Copper System, Southeastern Iran - Mining, Metallurgy & Exploration (2021)
By Omid Asghari, Seyed Reza Ghavami-Riabi, Sajjad Talesh Hosseini
Separation of geochemical anomalies from the background using various methods for identifying areas of higher mineral potential is a critical first step in Greenfield and Brownfield programs. There ar
May 3, 2021
-
Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024
By Sean Warren, JOSEF BOURGEOIS
The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute
Feb 1, 2024