Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design Of Pebble Crushing CircuitBy Derek J. Barratt
The existence of a critical size buildup in an autogenous or SAG mill can be predicted from proper examination of drill core and ore samples. Methods of dealing with such critical size in a primary mi
Jan 1, 1992
-
Design Of Permanent Block Stopping To Resist Strata Convergence Using Pre-Formed Low Density Polyisocyanurate Foam As A Perimeter SealBy Richard E. Ray
Conventional concrete block plastered with a cemantitious coating is the most common material used in the construction of perma¬nent stoppings to direct airflow in underground mines in the U.S.A. All
Jan 1, 1984
-
Design Of Pillars In Shrinkage Stoping ? 1. IntroductionBy R. W. O. Kersten
The shrinkage method of stoping with pillar support has been used at Agnes Gold Mine since mining commenced. Until recently, rock instability did not have any detrimental effect on safety or productio
Jan 1, 1982
-
Design of PlantsBy F. A. Gates, Bengt Samuelson, James E. Edmunds, S. McCune, Neil Hario, Norman L. Weiss, J. M. Bertram, A. M. Cavaliere, F. M. Jr. Stephens, D. D. Chiang
DESIGN BASIS Size of Project The size of the project generally is expressed in tons of ore milled per day, but company policies differ widely in this respect with a few adhering to this set figu
Jan 1, 1985
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Design of Proximity Detection Zones to Prevent Striking and Pinning Fatalities around Continuous Mining MachinesBy P. T. Bissert, J. P. Ducarme, J. L. Carr, A. K. Smith
"The continuous mining machine is a key piece of equipment used in underground coal mining operations. Over the past several decades these machines have been involved in a number of mine worker fatali
Jan 1, 2016
-
Design Of Quality Assurance Programs For Coal MinesBy B. A. Bancroft
A quality assurance program consists of all those activities aimed at providing confidence to the purchaser that the suppliers quality system will provide a product that will satisfy the purchaser&apo
Jan 1, 1994
-
Design of Rock Shafts Adjacent to Heavily Loaded ColumnsBy Nikolas K. Sokol
Underground construction often requires working within a very congested urban environment, including excavating shafts adjacent to highly sensitive and multistoried structures, sometimes even within s
Jan 1, 2008
-
Design Of Roof Bolt Installations In Stratified DepositsBy Madan M. Singh
Although roof bolting has been a major means of strata support for nearly two decades, little attention has been directed towards the design of bolt Installations. The variables involved are interdepe
Jan 1, 1967
-
Design Of Roof Bolting Systems For Room And Pillar MiningBy Fred D. Wright
In this paper the principal theories used to design roof bolting systems are presented and discussed. Then the characteristics of various types of roof bolts are presented and finally the interaction
Jan 1, 1982
-
Design Of Scalloped-Bottomed Thickener TanksBy John R. Buzek
Thickeners are simply large tanks, usually circular in shape, which are designed to allow settling of solids and to operate with continuous overflow of clear water and underflow of thick pulp. The dim
Jan 1, 1977
-
Design of Shallow Tunnels for Washington Dulles International Airport People MoverBy Frank P. Frandina, Diane R. Hirsch, David P. Field, Colin R. Weeks
To accommodate growth in air service and to follow the Master Plan for long-term airport development, the Metropolitan Washington Airports Authority established thed2 Development Program at Washington
Jan 1, 2005
-
Design of Soft-Sensors Using Cluster TechniquesBy Patricio A. Espinoza, Aldo Casali, Cristian Ardiles, Guillermo González
Cluster analysis is used to design grade soft-sensors in a rougher flotation plant and a ball mill overload soft-sensor. Soft-sensors are virtual sensors which either replace unavailable actual sensor
Jan 1, 1995
-
Design Of Stillwater Mining Company's East Boulder MineBy B. Strickland
The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished
Jan 1, 1999
-
Design Of Stillwater Mining Company’s East Boulder MineBy D. Einarson, B. Strickland
The decision to accelerate development of Stillwater Mining’s East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished thr
Jan 1, 1999
-
Design of the Akron Northside Interceptor CSO Tunnel - RETC2023By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.
Jun 13, 2023
-
Design Of The Bear Creek Uranium Mill ? IntroductionBy G. H. Kuhnhausen
The Bear Creek Uranium Mill was designed in 1975 to process 909 tonnes per day (1000 STPD) of low-grade uranium ore from the Powder River Basin in Wyoming. The mill was expanded to 1818 tonnes per day
Jan 1, 1979
-
Design of the Brightwater Conveyance TunnelsBy Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams
The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi
Jan 1, 2005
-
Design Of The Conda, Idaho Phosphate Rock Processing MillBy A. Guzman
The design and construction of a new 140-ton-per-day R. O. M. phosphate rock scrubbing and washing plant was undertaken by Western Knapp Engineering Company, a Division of Arthur G. McKee and Company,
Jan 1, 1969