Design Process And Equipment Selection For Auxiliary Ventilation SystemsBy D. G. Mirakovski, B. Krstev
The paper presents models of auxiliary ventilation systems with leaky ducts and algorithms for calculations of pressure loss, air leakage, and volume flow ratio and pressure fans. Two basic models are
Jan 1, 2002
-
Design Review Of A Rectangular Shaft In AlluviumBy P. D. Pack, E. H. Skinner
During design of a 550-foot rectangular shaft in alluvium, lateral support within the excavation was an anticipated construction problem. Actual experience showed that the nearly 9 x 14 foot excavatio
Jan 1, 1977
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Design Strategies For Selective FlocculantsBy G. R. O?Neil
The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i
Jan 1, 1983
-
Design Tools for Construction EngineeringBy Scott G. Britton
Up to now, the hands-on approach to construction has been stressed. This chapter reviews the basic tools available for construction design and monitoring of a construction project. It is divided into
Jan 1, 1983
-
Design Tools To Control Transients In Solvent Extraction PlantsThe design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixer units. However, recent experience in both large and
Jan 1, 2003
-
Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)By G. Miller
The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant
Jan 1, 2001
-
Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? IntroductionBy M. D. Scott
Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972
Jan 1, 1976
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Design, Development, Application, and Operating Benefits of 100-m3+ Outokumpu TankCell Flotation CellsBy Adolf J. Jonaitis
Outokumpu developed TankCell flotation cell technology beginning in 1990, following 35 years of successful flotation cell experience and application. In 1994, Outokumpu proved favorable operating succ
Jan 1, 1999
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring MachineBy Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Design, Installation And Effectiveness Of A Degasification System At The Pasta De Conchos MineBy F. Gonzalez, A. Zambrano, J. Schwoebel, S. Kravits
Significant lost time delays were experienced by Carbonifera de Nueva Rosita, S.A. de C.V. ("CNR") during mining development of the Pasta de Conchos Mine ("the Mine") near Nueva Rosita, Coahuila, Mexi
Jan 1, 1993
-
Design, Installation And Operation Of The Pinto Valley Moly Flotation ColumnsBy R. Rodgers
The Pinto Valley Concentrator of BHP Copper Inc. restarted its sulphide mining operations in September 2007 to produce copper and moly concentrates. During the plant production ramp up, the copper/mol
Jan 1, 2010
-
Design, Operation And Control Of A Teeter-Bed Hydroseparator For Classification (August 2010 • Vol. 27 No. 3)By J.N. Kohmuench
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Operation, And Control Of A Teeter-Bed Hydroseparator For ClassificationTeeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm SinkholeBy Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and ShaftBy Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex ProjectBy Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade
This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a
Jan 1, 2003
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023