Design-Build: Elevating Partnering to a Higher LevelBy Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring
The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value
Jan 1, 2003
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Designing a final wall blast to improve stabilityBy J. P. Savely
This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b
Jan 1, 1987
-
Designing A Final Wall Blast To Improve Stability (PRIPRINT 86-50)By James P. Savely
This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b
Jan 1, 1986
-
Designing a Geostatistical-Based U-Spatial Statistics Algorithm for the Separation of the Anomaly Area: Application at Baghqloom Porphyry Copper System, Southeastern Iran - Mining, Metallurgy & Exploration (2021)By Omid Asghari, Seyed Reza Ghavami-Riabi, Sajjad Talesh Hosseini
Separation of geochemical anomalies from the background using various methods for identifying areas of higher mineral potential is a critical first step in Greenfield and Brownfield programs. There ar
May 3, 2021
-
Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024By Sean Warren, JOSEF BOURGEOIS
The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute
Feb 1, 2024
-
Designing An Information Management System For Mineral Processing PlantsBy G. A. Kosick, L. Kuehn
The design of an information management system (IMS) for a mineral processing plant requires prior consideration of many factors, which can be broadly categorized into two domains, process plant consi
Jan 1, 1993
-
Designing An Oil Shale Mine Ventilation System ? IntroductionBy Floyd C. Bossard
In underground mining operations, the over- riding issue has to be protection of worker health and safety. The employees underground, making a living in a dangerous occupation, know these are major is
Jan 1, 1983
-
Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction MethodsBy Matthew Anderson, David Day, Paul Smith
"The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me
Jan 1, 2016
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Designing and managing unpaved opencast mine haul roads for optimum performanceBy A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks capable of hauling payloads in excess of 290 t (320 st). Mine haul roads have historically been designed emp
Jan 1, 2000
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
Designing and modeling mesh communications in underground coal minesBy Michael E. Karmis
New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer
Jun 1, 2010
-
Designing And Modeling Wireless Mesh Communications In Underground Coal MinesBy K. R. Griffin
New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen
Jan 1, 2010
-
Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York CityBy Dean Workman
Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th
Jan 1, 2008
-
Designing for Optimized Tailings Storage EconomicsBy Donald R. East
The impacts of the economic storage or disposal of mill tailing wastes are becoming more important to the mining industry as environmental regulations become more demanding. Mill tailings have long b
Jan 1, 1990
-
Designing for Process Control at Mingo LoganBy Bruce Hern
The last 10 years have seen a dramatic increase in the requirements for product coal quality control. This has led to electric utility sulfur scrubbing, metallurgical blast furnace optimization and co
Jan 1, 1994
-
Designing For Upper Seam Stability In Multi-Seam MiningResearch has determined that ground control interaction problems in mining over a previously mined seam occur primarily in the tension zone created at the edge of the subsidence trough, and in areas a
Jan 1, 1988
-
Designing Leach Pad Liners For Differential SettlementBy T. V. Ramey
Heap leaching in certain parts of the world, such as Chile's Atacama Desert, brings unique design problems in the form of possible large differential settlements of the foundation soils due to th
Jan 1, 1997