Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Developing a virtual reality environment for mining research (ME)
By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jason Navoyski, Jennica L. Bellanca, William J. Helfrich
Recent advances in computing, rendering and display technologies have generated increased accessibility to virtual reality. Virtual reality allows for the creation of dynamic, high-fidelity environmen
-
Developing a Virtual Reality Environment for Mining Research Mining, Metallurgy and Exploration (SPRINGER)
By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jason Navoyski, Jennica L. Bellanca, William J. Helfrich
Recent advances in computing, rendering, and display technologies have generated increased accessibility for virtual reality (VR). VR allows the creation of dynamic, high-fidelity environments to simu
-
Developing an Automated Drill Hole Data Base and Analysis System
By Steve Wiig
In 1987, the Rock Springs, WY district office of the US Bureau of Land Management (BLM) began to develop an automated system to store, maintain and manipulate more than 14,000 drill hole logs containe
Jan 1, 1992
-
Developing An Effective Corporate Environmental Compliance Policy
By J. R. Allen
Environmental laws and regulations have proliferated over the last two decades. 1/ Within the last year, Congress has dramatically expanded the scope of the Superfund program 2/ and has enacted signif
Jan 1, 1988
-
Developing an empirical summation chart on the distribution of extension fractures in matured yielding pillars using geophysical technique
By FHATUWANI SENGANI
The understanding of yielding pillar behavior has been well documented in terms of pillar strength using numerical simulations and empirical formulas, but the understanding of how fracture propagates
-
Developing an Evaluation Model for Economic Feasibility Analysis of Using Mechanical Boring Machines (TBM vs Roadheader) in one of the Largest Coal Reserves in Iran "Mining, Metallurgy & Exploration (2021)"
By Sadegh Elyasi
TBMand roadheader are two dominating excavation machines in underground tunnelling projects. The performance of these two tunnelling machines has been reviewed and analysed individually by many resear
Feb 12, 2021
-
Developing an Information System to Choose Abandoned Mine Sites for Reclamation
By E. K. Albert
Title IV of the 1977 Surface Mining Control and Reclamation Act (SMCRA) provides for an abandoned mine reclamation fund. This fund, taken from fees collected from operating coal mines, provides capita
Jan 1, 1990
-
Developing an Integrated Flowsheet for Treating a Diversified Copper Ore Deposit
By J. C. Gathje
The Robinson copper ores were mined for many years from pits containing varying ore grades, sulfide and oxide ore types, and differing mineralogy. The ores also contain gold and molybdenum values, and
Jan 1, 1992
-
Developing and Evaluating Pit Truck Safety Devices
By W. C. Yates
Lack of visibility from large, open-pit haulage truck cabs has become a serious safety problem. Anaconda conducted a research program to develop a low cost system to alert haulage truck operators to s
Jan 7, 1982
-
Developing And Implementing An Enterprise Reliability Strategy (ERS) In Mining Operations
By J. W. Davis
In the last few years major industrial companies have begun to realize the importance of Reliability as an enterprise strategy that, properly implemented, will improve financial performance. Typical
Jan 1, 2003
-
Developing And Implementing An Occupational Health And Safety Management System: Finding The Right Approach To OHSAS 18001:2007 ? Introduction
By A. S. Haugh
OHSAS 18001 is a series of international standards for occupational health and safety management. It is comprised of two parts, 18001 and 180029. OHSAS 18001 was formulated by international certify
Jan 1, 2012
-
Developing and Testing an Optimization Algorithm for Practical Open-Pit Pushback Design
By Juan L. Yarmuch, Hyam Rubinstein
Open-pit mine planning is a key process in the definition of mineral reserves and their efficient removal. Ore in open-pit mines is extracted bymining sequential pits called pushbacks. Pushbacks need
Jun 25, 2023
-
Developing Computational Groundwater Monitoring And Management System For Estonian Oil Shale Deposit
By H. Lind
Mining in Estonian oil shale deposit mainly takes place in the Ordovician, Keila-Kukruse aquifer. The aquifer is affected by mining and is fully dried out around the working mine areas (Perens and Sav
Jan 1, 2008
-
Developing Decision Support Systems At Large-Scale Underground Mines.
By S. Dessureault
Integrated information technology infrastructure is the linking of data across various applications throughout a business to gain further data-driven improvement opportunities. Decision support system
Jan 1, 2004
-
Developing Functional Baselines
By William W. Edgerton
Establishing geotechnical baselines on soft ground projects that require the use of closed-face tunnel boring machines (TBMs) is difficult. It is hard to see the face when mining and the excavated mat
Jan 1, 2012
-
Developing Fuzzy Inference Systems (FIS) For The Evaluation Of Multiple-Layer Lignite Deposits
By M. Galetakis
The difficulties that rise during the evaluation of multiple-layer lignite deposits come from the deposit structure (alternating lignite layers with intercalated material of varying thickness), as wel
Jan 1, 2005
-
Developing Gold Fields’ La Cima Cerro Corona Project in Peru
By Richard W. Graeme, James J. Komadina
Gold Fields acquired an option to purchase the Cerro Corona project, located in Hualgayoc, Cajamarca Department, Peru, in December 2003. In January 2006, the option was taken up and the transaction c
Jan 1, 2007
-
Developing Information Management And Systems Analysis Procedures For Abandoned Mine Lands Site Selection
By E. K. Albert
In 1977, Congress enacted Title IV of the Surface Mining Control and Reclamation Act (SMCRA), providing for an "abandoned ml.ne reclamation fund". This fund, taken from a fee collected from operating
Jan 1, 1990
-
Developing Innovative Technology
By Terry McNulty
There are many potential pitfalls in the commercialization of innovative technology. The failures often are remembered longer than the successes, thereby serving as deterrents to subsequent attempts.
Jan 1, 1998
-
Developing Magma’s Tailings Leach Operation
By T. McWaters
In 1911, Miami Copper Co. began a block caving operation at its Miami, AZ property. A gravity mill was used to separate copper minerals from the Pinal Schist host rock. Until 1932, the mill tailings w
Jan 1, 1990