Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001
-
Ground Freezing for Construction at the Port of Miami TunnelBy Roger Storry, Arnaud Hochart, David Harris, Olivier Martin
"INTRODUCTIONThe Port of Miami Tunnel (POMT), designed and constructed by Bouygues Civil Works Florida between 2009 and 2014, was a Public Private Partnership between the Miami Access Tunnel Concessio
Jan 1, 2016
-
Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024By Andrew Chegwidden, Tara Wilk
Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m
Jun 23, 2024
-
Ground Freezing for Deep Shafts at the Mill Creek Tunnel ProjectBy Richard Switalski, Mark R. Kritzer, Boro J. Lukajic, Robert Pintabona
Ground freezing was chosen as an initial support method during construction of two deep shafts at the Mill Creek project. The Mill Creek, Phase 2 tunnel (MCT-2) is utilized to convey and store combine
Jan 1, 2003
-
Ground Freezing For Mine Shaft SinkingBy P. C. Schmall
Ground freezing has been used for the sinking of deep mine shafts for more than 140 years. While advances in refrigeration technology have refined the overall freezing operation, the basic ground free
Jan 1, 2010
-
Ground Freezing For Soft Ground Shaft SinkingBy John A. Shuster
Case histories are reported for several soft ground shafts ranging from 6' to 40' in diameter and 50' to 230' in overburden depth for which ground freezing was employed to provide
Jan 1, 1985
-
Ground Freezing for the Construction of Deep ShaftsBy Paul C. Schmall, Arthur B. Corwin, Hugh S. Lacy, Derek Maishman
For reasons of hydraulic design and constructability, water supply tunnel systems are often located relatively deep, in competent rock. Where the rock lies below a thick cover of water bearing soils,
Jan 1, 1999
-
Ground Freezing for the Construction of Deep Shafts (cd62e630-bbbe-4bb8-bfbe-16b05dab86f1)By James A. Morrison, Stephane Carayol, Paul H. Madsen
The Rio Piedras Alignment Section 7 of the Tren Urbano is currently being constructed beneath a historic commercial section of San Juan. Different portions of the section are being constructed using o
Jan 1, 1999
-
Ground freezing resolves complex challenges ahead of SEM tunnelingBy Gregory T. Ziegler
A complex soil profile and high water table, together with a below-grade active subway tunnel, an above-ground elevated railway line, and the heavily travelled Northern Boulevard all passing above the
Sep 1, 2013
-
Ground Freezing To Provide Support For Tunneling Using Vertical Refrigeration PipesBy Theodore Budd, Joseph A. Sopko
Ground freezing was selected to provide excavation support and ground water control for the construction of a 457 cm diameter tunnel between two underground structures for a major sewer project in Mil
Jan 1, 1991
-
Ground Freezing to Repair Leaks in a Slurry Wall ShaftBy Shawn P. Coughlin, Michael A. Schimmenti, Juan Leonardo Tello del Pino
"PROJECT OVERVIEWThe Sistema de Potabilización Área Norte project (Northern Area Purification System) was a major expansion of the potable water system in Buenos Aires Province, Argentina. The aim of
Jan 1, 2016
-
Ground freezing to repair leaks in slurry wall shaftBy Shawn P. Coughlin, Michael A. Schimmenti, Juan Leonardo Tello del Pino
"The Sistema de Potabilización Área Norte project (Northern Area Purification System) was a major expansion of the potable water system in Buenos Aires Province, Argentina. The aim of the project was
Sep 1, 2016
-
Ground Freezing Under the Most Adverse Conditions: Moving GroundwaterBy Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin
Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result
Jan 1, 2007
-
Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024By Joseph Sopko, Xavier Lacourse-Dontigny
For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th
Jun 23, 2024
-
Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan
The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J
Jun 13, 2023
-
Ground Improvement on the Central Artery Project - Examples of Innovative ApplicationsBy Gary S. Brierley, James R. Lambrechts, Andrew F. McKown
Various innovative Ground Improvement techniques have been proposed and applied to facilitate construction of the Central Artery/Tunnel Project in Boston. Given in this paper are discussions of the ex
Jan 1, 1999
-
Ground Improvement Works and Construction of Six SEM Adits as Part of the Northeast Boundary Tunnel Project in Washington, D.C. - NAT2022By Basilio Giurgola, Federico Bonaiuti, Norbert Fuegenschuh
The North East Boundary Tunnel (NEBT) project in Washington, D.C. requires design and construction of several SEM adits which have to be built between lateral shafts and the NEBT-TBM Tunnel. The paper
Dec 1, 2022
-
Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, OhioBy Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski
Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p
Jan 1, 2005
-
Ground Investigation and Tunnel Design for the Liantang/Heung Yuen Wai Boundary Control Point and Associated WorksBy Guy Bridges, Elton Ko, Cheng Ting Ning, Owen Ng, Giovanni Chang, Robert Anderson
"PROJECT OVERVIEWThe Liantang/Heung Yuen Wai Boundary Control Point (BCP) and Associated Works will be the seventhland crossing between Shenzhen and the Hong Kong Special Administrative Region (HKSAR)
Jan 1, 2016