Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Improving Grinding Efficiency By Rationed Ball Charging At Amax's Climax Molybdenum Mine

    By Robert R. Dorfler

    AMPS[. has completed a rationed grinding ball test in a 2.93 m x 2.93 m ball mill at Climax Molybdenum Company. The test consisted of purging the ball distribution formed by charging 100%, 76 mm carbo

    Jan 1, 1981

  • SME
    Improving Hard Rock Tunneling Through Comparison Of Laboratory And Field Tunnel Boring Studies

    By Levent Ozdemir, Russell Miller, Fun-Den Wang

    The full utilization of tunnel boring machines for excavation in medium hard and hard rock has been limited by insufficient knowledge of rock behavior under the action of mechanical cutters. An und

    Jan 1, 1974

  • SME
    Improving Highwall Stability At The Gregg River Mine

    By A. E. Stewart

    Slope design in an open pit mine includes determining bench height, bench face angle and berm width. Case histories are presented of two highwall slopes (160 and 220 m or 525 and 720 ft high) excavate

    Jan 1, 1998

  • SME
    Improving Leaching Recovery Of Copper From Low-Grade Chalcopyrite Ores

    By J. M. Ekenes

    New approaches that increase hydrometallurgical recovery from refractory minerals in below-mill-cut-off-grade sulfide copper ore can add significant value, improve profitability and increase ore reser

    Jan 1, 2012

  • SME
    Improving Leaching Recovery of Copper from Low-Grade Chalcopyrite Ores (970698bf-b044-4887-bb05-b52c8beab0b7)

    By J. M. Ekenes, C. A. Caro

    "New approaches that increase hydrometallurgical recovery from refractory minerals in below mill cutoff -grade sulfide copper ore can add significant value, improve profitability and increase ore rese

    Jan 1, 2015

  • SME
    Improving Magnetite Concentrate Filtering Rates With Carbon Dioxide Addition

    By S. J. Ripke

    To pelletize fine moist magnetite concentrate, a 40% water slurry must be dewatered to about 10% by filtration, before it can be agglomerated into pellets. Slurry pH, typically ranging from 8 to 11, g

    Jan 1, 2004

  • SME
    IMPROVING MINE HEALTH AND SAFETY TRAINING THROUGH THE DEVELOPMENT OF MONTANA TECHNOLOGICAL UNIVERSITY’S MINE HEALTH AND SAFETY TRAINING PROGRAM - SME Annual Conference 2023

    By J. Hart, P. W. Conrad, S. Rosenthal, R. A. Hogan

    The Mining Engineering Department at Montana Technological University (Montana Tech) has a new Mine Safety and Health Administration (MSHA) approved program for Part 46 and Part 48 mine health and saf

    Feb 1, 2023

  • SME
    Improving Mine Performance Through Contract Mining (The Australian Experience)

    By T. S. Golosinski

    Use of contractors to excavate, load and haul mined material is widespread in Australia. It is also becoming a common practice in many other countries. The paper reviews current practices in Australia

    Jan 1, 1998

  • SME
    Improving Modern Underground Mining Methods for Moderately Inclined Tabular Deposits

    By T. Rockley, J. Brune

    "The mining of tabular deposits accounts for a significant portion of modern production in both underground hard rock and especially, soft rock mining. There is a large discrepancy between the availab

    Jan 1, 2017

  • SME
    Improving On The Estimation Of Recoverable Reserves

    By M. E. Rossi

    Reconciliation of long-term block model reserves and mine production frequently shows significant discrepancies. This reconciliation can be done comparing the long-term block model reserves against a

    Jan 1, 1998

  • SME
    IMPROVING OPERATING COSTS -SHORT TERM AND LONG TERM Focus

    By Robert Dunne

    Over the last eighteen months, there has been a dramatic r decrease in the gold price fom US$450/oz to a low of US$275/oz. The prospect of low gold prices, around US$300/oz, appears to be a reality th

    Jan 1, 1998

  • SME
    Improving Ore Reserve Estimates for Precious Metals Projects

    By J. Allen Hennessy

    INTRODUCTION The increasing price of gold and silver over the past 10 years has caused increasing activity in the exploration, evaluation and development of precious metals projects. Many of these

    Jan 1, 1987

  • SME
    Improving Overall Plant Performance With the Aid of Quantitative Models for Various Unit Operations Developed from In-Plant Studies

    By K. R. Weller, U. J. Sterns

    The goal of most in-plant studies is to identify factors that limit overall plant performance. A major finding from such studies is that interactions between unit operations are always important, usua

    Jan 1, 1989

  • SME
    Improving Performance By Drilling And Blasting Of Gold Heap Leach Pads

    By D. J. Turk

    Faced with decreasing production from the gold heap leach operation, Robinson implemented a drilling and blasting program on the leach pads in 1993. This program offset some of the negative effects of

    Jan 1, 1995

  • SME
    Improving Performance Of Dust Controls For Continuous Miners

    Laboratory tests were conducted in a full-scale continuous miner test gallery to evaluate resulting dust levels for changes in face airflow, spray water quantity and pressure, and mining height. The m

    Jan 1, 1994

  • SME
    Improving performance of heavy mineral processing plants through Six Sigma

    By M. Akser, M. Tomas

    Six Sigma is a methodology that uses a structured and disciplined approach to improve process performance (higher throughput, better recovery, lower cost, shorter cycle time, etc.). Specially trained

    Jan 1, 2005

  • SME
    Improving Performance Through "Gainsharing"

    By Walter E. Cook

    BOB FALCONER: Without further ado I'm going to introduce our first speaker, Walt Cook. Walt is president of Strata Resources and is here with his business partner Joe Nenni. Joe would you stand u

    Jan 1, 1998

  • SME
    Improving Phosphate Flotation With New Chemistry, Smart Flowsheet And Novel Equipment

    By P. Zhang

    The Crago “Double Float” process is widely used in upgrading phosphate ore. This process is inefficient, as it floats about 30-40% of the sands in the flotation feed twice and requires a deoiling step

    Jan 1, 2004

  • SME
    Improving Plant Performance with "World-Class" Management Techniques

    By Bruce W. Cavender

    There is a tendency for managers of mining companies to regard the performance of a process plant as essen­tially fixed, with only incremental improvements to be realized by optimizing individual unit

    Jan 1, 1993

  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001