Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Mine Management System Impact On Productivity Of The Peter Mitchell Mine

    By D. J. DeLeo

    In recent years the hue and cry of American industry concerning the pressure of foreign competition on the domestic marketplace has become all too familiar to most of us, as we are all well aware, the

    Jan 1, 1985

  • SME
    Mine Managers For Underground Aggregate Operations: Problem Today-Crisis Tomorrow

    By S. Johnson

    Introduction The mining of aggregates underground has grown steadily over the last 25 years. Growth has come in both production volume and in the importance this segment of the industry is playing i

    Jan 1, 2006

  • SME
    Mine Modeling Software for Less Than $1000 – Usefulness and Limitations

    By Betty L. Gibbs

    Geologically simple deposits can be modeled quickly and easily with inexpensive gridding and mapping software. Hundreds of mines around the world use RockWorks99 and Surfer 7 for generating contour m

    Jan 1, 2000

  • SME
    Mine Models And The Thoron Problem In Underground Uranium Mines

    By J. Bigu

    Use has been made of several theoretical models to predict radiation levels in underground uranium mines. The models used are the Evans model, the Thomas-Epps mine model, the isolated mine model, the

    Jan 1, 1981

  • SME
    Mine Modernization Of AMAX?s Carlsbad Property

    By Robert E. Kirby

    The potash mine and refinery of AMAX Chemical Corporation is located 26 miles east of Carlsbad on the north end of the potash producing areas. This property was developed between 1949-1952 and product

    Jan 1, 1974

  • SME
    Mine modifications for economic survival - a case study

    By R. L. Grayson, G. Mishra

    Introduction Many old underground mines have been developed extensively into reserves requiring large numbers of workers to maintain and rehabilitate lengthy track haulages and/or belt conveyor sy

    Jan 1, 1988

  • SME
    Mine monitoring - Improving protection and productivity

    By P. Worley

    Installation of UP& Is monitoring system was planned to be completed in three stages: Environmental Monitoring, ConveyorBelt Interface, and Power Distribution Interface. With Phases 1 and 2 completed

    Jan 1, 1990

  • SME
    Mine Monitoring Improving Protection And Productivity (c69e0ffc-27e4-40e1-b114-1a46f7a3f190)

    By P. Worley

    With Utah Power & Light Mining Division's commitment to operate the safest and most productive mines possible, a decision was made to purchase and install mine-wide monitoring systems for use in

    Jan 1, 1989

  • SME
    Mine Operating In Bisbee

    After World War I the character of my mining life changed completely. Before then adventure had been almost continuous but after the war there was lots of staying in one place, almost routine, between

    Jan 1, 1976

  • SME
    Mine Operations Planning - It's as Easy as "1-2-3"

    By Glenn J. Phillips, Debra L. Musick

    The operating mine is dynamic, everchanging, and a continuous moving target. The only way to effectively manage such a creature is to be able to evaluate the cost of operation over short enough time p

    Jan 1, 1987

  • SME
    Mine Operations Strategy In A Fluctuating Environment ? Introduction

    By S. K. Palm

    Volatility is a fact of life in the mining industry. Prices of and demand for mineral products are among the most volatile of those for any product. The volatility of these markets wreaks havoc on bot

    Jan 1, 1986

  • SME
    Mine panel failure - A case study

    By K. Morsy, S. S. Peng

    This paper deals with the causes and mechanisms of a massive pillar failure in a room-and-pillar mine. The mine employed a nine-entry panel system using supersection technique under a cover ranging fr

    Jan 1, 2002

  • SME
    Mine Panel Failure-A Case Study (55c93e4a-a415-4c79-98cf-200bcc20cd84)

    By K. Morsy, S. S. Peng

    This paper deals with the causes and mechanisms of massive pillar failure in a room-and-pillar mine that employed nine-entry panel system using supersection technique under a cover ranging from 91 to

    Jan 1, 2000

  • SME
    Mine Permitting Based On Post-Mining Land Use

    By A. K. Kuhn

    In virtually all jurisdictions, comprehensive environmental protection regulations or standards are in place that apply to all industries, including mining. The only other legitimate mine-permitting c

    Jan 1, 1999

  • SME
    Mine Permitting: A Lawyer's Perspective

    By R. W. Sims

    "He?s an SOB, but he's my SOB." Many of us have heard this line in reference to attorneys, and can appreciate the humor. However, the thought reflects a deeper attitude that lawyers should be use

    Jan 1, 1990

  • SME
    Mine Pillar Design in 1993 – Computers Have Become the Opiate of Mining Engineers – Part II

    By Jack Parker

    Critical width Before we go further into pillar design, we should look into the matter of "critical width," because of its effect on pillar behavior. Critical width refers to the greatest width th

    Jan 1, 1993

  • SME
    Mine Pillar Design in 1993 – Computers Have Become the Opiate of the Mining Engineers

    By Jack Parker

    Pillar design ought to be a matter of matching pillar strength against pillar loading conditions to come up with dimensions that will cause the pillar to behave as required - to stand forever, or for

    Jan 1, 1993

  • SME
    Mine Pillar Design Using the Ground Reaction Curve Concept

    By Ravi Ray, Kostas Kaklis, Zach Agioutantis

    "Modern underground mining is becoming more complex and geotechnically challenging. The engineer uses numerical, analytical, and data-driven methods (empirical and/or experimental) or their combinatio

    Jan 1, 2019

  • SME
    Mine Plan Response To Western Geological Conditions

    By J. M. Mercier

    Approximately seven (7) years of recent intensive mining activity in the Wasatch Plateau Coal Field of Utah has revealed distinct geologic patterns which, at times, profoundly influence reserve estima

    Jan 1, 1984

  • SME
    Mine Plan Risk Assessment and Grade Uncertainty Characterization Using Geostatistical Conditional Simulation: Gold Mine Case Study - SME Annual Meeting 2025

    By Kadri Dagdelen, Steven Hoerger

    For gold mines, orebody uncertainty is one of the leading causes of differences between planned and actual production. Geostatistical conditional simulations create multiple equally probable orebody b

    Feb 1, 2025