Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Overburden-Removal Cost Management Using Work Order Systems at Coteau Properties’ Freedom Mine

    By Jack G. Pippenger

    The Coteau Properties Co.'s Freedom Mine is a surface lignite mine that uses large draglines, trucks and shovels, tractor-scrapers and bulldozers to uncover a single coal seam. In 1989, a work or

    Jan 1, 1994

  • SME
    Overcoming Challenges in the Construction of the Dublin Port Tunnel

    By Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan

    The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a

    Jan 1, 2007

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022

  • SME
    Overcoming Design Challenges on the Ohio River Tunnel to Improve Water Quality in Pittsburgh, PA - NAT2024

    By Zhenqi Cai, Mike Lichte, Kimberly Kennedy

    The Ohio River Tunnel is the first of three combined sewer overflow tunnels to be constructed under Allegheny County Sanitary Authority's Clean Water Plan. The project consists of a total of approxim

    Jun 23, 2024

  • SME
    Overcoming local conflicts and production needs related to mining. Social impact assessment and local participation

    By G. Balletto, C. Furcas

    "The mineral raw materials industry is a key-component of the Gross Domestic Product of industrialised economies, closely related to both the building and the industrial sectors. Despite this, at loca

    Jan 1, 2011

  • SME
    Overcoming Massive Squeezing Ground Utilizing Curved Tunnel Face and Full-Face Excavation with Early Ring Closure

    By Hiroyuki Tamaru, Futoshi Kusumoto, Kosuke Tanimura, Atsuyuki Kimura

    "SUMMARY The Hachinoshiri tunnel is a 2,469 m long two-lane road tunnel on the Chubu-Odan Expressway. Since more than 70% of the total tunnel length consists of low strength rock masses the competence

    Jan 1, 2016

  • SME
    Overcoming Preconceptions For A Successful launch Of Autonomous Haulage

    By James Humphrey

    There is a natural resistance to change in any form. When it comes to implementing a game-changing technology like autonomous haulage on an operating mine site, the resistance can at times appear insu

  • SME
    Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024

    By Bernd Hagenah, Eric C. Wang

    New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons

    Jun 23, 2024

  • SME
    Overcoming Underground Mining Space Constraints

    When most people think of coal mining, they envision men in soot-covered clothes and hard hats digging at deposits in deep underground caverns. These mental images commonly include coal cars rumbling

  • SME
    Overestimation Of Acid Generating Potential (AGP) In Alunite-Bearing Waste Rock

    By A. S. Hall

    Significant pyrite often does not dissolve in the Sobek (1978) nitric acid extraction; therefore, the standard conservative approach is to estimate pyrite using sulfur present in the sum of the nitric

    Jan 1, 1999

  • SME
    Overexcavation Risk Management During Pressurized Face Tunneling in the Pacific Northwest - RETC2023

    By Ulf Georg Gwildis

    Overexcavation and ground loss events during pressurized-face TBMadvance in soft ground can result in unplanned deformations above the tunnel and damage to existing infrastructure. Successfully managi

    Jun 13, 2023

  • SME
    Overflow Ball Mill Sizing: A Shared-Time Computer Program ? Introduction

    By Duncan M. Lamb

    Commercial computer "time-sharing" is a new and powerful tool for the engineer. It is a system of virtually simultaneous use of a digital computer by several individuals. Access to the computer is by

    Jan 1, 1969

  • SME
    Overmining In Kailuan, China Mining Area

    By Jun Han

    Coal has been mined in the Kailuan mining area for more than 130 years. The remaining reserves consist of, in large part, coals that would have been considered economically unminable or technically no

    Jan 1, 2009

  • SME
    Overseas Private Investment Corporation Minerals Program

    By Richard H. Lindgren

    I appreciate this opportunity to discuss with you OPIC's new policies designed to assist U.S. minerals companies in developing new sources of minerals overseas. A comparison of recent figures on

    Jan 1, 1978

  • SME
    Overshot Loaders

    By Robert L. Sundeen, Richard V. Wenberg

    Overshot loaders are loading machines which fill a front-mounted bucket by crowding and bucket lifting, passing the loaded bucket over the machine and throw¬ing the load into a haulage unit to the rea

    Jan 1, 1982

  • SME
    Oversize Reduction Project At The Iron Ore Company Of Canada (ME)

    The Iron Ore Company of Canada (IOC) is the largest manufacturer of iron ore pellets in Canada and its customer base covers North American, European and Asian steel producers. The company operates a m

    Jan 1, 2011

  • SME
    Oversize Reduction Project At The Iron Ore Company Of Canada (SME Annual Meeting)

    By R. Pinksen

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • SME
    Oversized fans ventilate the world’s largest and longest railway tunnel

    "With up to 2,300 m (7,545 ft) of rock on top of it, the Gotthard Base Tunnel, which is scheduled to go into regular operation in December 2016 in the Swiss Alps, is not only the world’s longest, but

    Dec 1, 2016

  • SME
    Overview And End Uses Of Perlite

    By D. Diekman

    Perlite is not a trade name but a generic term for naturally occurring siliceous volcanic rock. A distinguishing feature which sets perlite apart from other volcanic glasses is that when heated to a s

    Jan 1, 1985

  • SME
    Overview and evaluation of smoke detectors in underground mines - SME Transactions 2011

    By C. D. Litton

    When methods to prevent the occurrence of fire in underground mines fail, the next line of defense is to rapidly and reliably detect the developing fire, so that subsequent evacuation and control proc

    Jan 1, 2011