Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Internal Investigations And Preventive Safety Audits: You Are What You Document
By L. E. Beverage, K. L. Johnston
This paper will address methods for minimizing liability and protecting materials from disclosure as result of self- evaluative audits and internal investigations. Specifically, the paper will cover
Jan 1, 2001
-
Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in Australia
By John Zeni
In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the
Jan 1, 2001
-
Tunneling for the Chaloem Ratchamongkhon Line in Bangkok
By S. Suwansawat, D. J. Maconochie, C. C. Chang
This paper describes the overall delivery of the tunneling for the Mass Rapid Transit Authority of Thailand’s Chaloem Ratchamongkhon Line in Bangkok and the constraints provided by the alignment. Eigh
Jan 1, 2001
-
The Effectiveness Of Task-Based Noise-Exposure Assessment Methods For Monitoring Miner Noise Hazards
By C. Bise, A. Seal
Excessive noise has long been a hazard in the coal-mining industry. Studies conducted during both the mid-1970s and the mid-1990s consistently show that hearing hearing loss within the mining industr
Jan 1, 2001
-
Characterization Of Eddy Current Separation Samples Of Aluminum Smelting By-Products
By J. Y. Hwang, M. L. Jeong, R. C. Greenlund
Various aluminum-smelting by-products from three production sources were received and characterized. The waste materials were tested for compound identification and environmental acceptance. A coarse
Jan 1, 2001
-
The Fourth Tube of the Elbe-Tunnel—Built by the World’s Largest Soft Ground Tunnelling Machine
By Claus Becker
The new, 2.600 m long pipe under the river Elbe in Hamburg/Germany required for 2 traffic lanes, emergency lane and space for utilities a boring diameter of 14,20 m(46,6 ft). According the geology (gl
Jan 1, 2001
-
Microtunneling Through Designed Curves
By D. Craig Camp
Microtunneling has successfully completed both horizontal and vertical curves. This paper covers the historical development of curved microtunneling and a description of one microtunneling project. Th
Jan 1, 2001
-
Development in Utility Tunnelling in the United Kingdom During the Years 1990–2000
By Andy Mille
The paper highlights development of tunneling methodology in the UK during the years 1990-2000 using the example of two major tunneling contracts where there solution of difficult tunneling problems d
Jan 1, 2001
-
Asarco Mineral Creek Tunnel
By Shane Yanagisawa
The Mineral Creek Diversion Project is at the Asarco Ray Mine Complex, about128 km (80 miles) east of Phoenix, Arizona. The new tunnel will intercept the waters of Mineral Creek about 2,134 m (7,000 f
Jan 1, 2001
-
Tunnel Protection by Ground Improvement Prior to Track Lowering
By Ronald E. Triplett, George K. Burke, Bernard H. Voor
To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which
Jan 1, 2001
-
Paste Reticulation Systems: Myths and Misconceptions
By Robert Cooke
This paper shows how technology developed to analyse stabilised slurries can be applied to paste flows. The rheological characterisation of paste mixtures using the generalised yield pseudoplastic rhe
Jan 1, 2001
-
Froth Flotation With The Turbo Froth Flotation Column
By B. J. Arnold, N. Terblanche
The features of the ‘Turbo’ froth flotation column will be discussed, including the double aeration system that improves flotation yield while not sacrificing grade, the internal launder system, and t
Jan 1, 2001
-
Cathodoluminescence (Cl) Microscopy Application To Refractories And Slags
By R. E. Moore
Refractories are unique ceramic materials, which are used in large quantities in steel making furnaces, metal smelting vessels, and glass melting tanks. They are required to possess high thermal shock
Jan 1, 2001
-
Bacterial Pretreatment To Enhance Silver Recovery From Artvin-Kafkasör Ore By Cyanidation
By Ü. Atalay, G. Alaeddinoglu, G. Özcengiz, G. Özbayoglu, Z. Özdemir
In this study, bacterial pre-treatment was applied before cyanidation in order to enhance the solubilization of silver from Artvin-Kafkasör ore Direct cyanidation process was found inefficient to reco
Jan 1, 2001
-
Historical Production, Resource Depletion, And Coal Quality Constraints - Keys To Future Coal Production Patterns?
By R. C. Milici
The primary factors that determine the marketability of coal from various supply centers in the U.S. are coal quality and supply; i.e. low sulfur, moderate- to high- Btu coals have large market areas
Jan 1, 2001
-
The Importance Of Environmental Compliance Programs
By D. E. Nash
Environmental compliance programs for mining companies are not only important management tools, but can deflect serious civil and criminal penalties if violations of environmental laws do occur. The
Jan 1, 2001
-
Current and Future Tunnelling Works in Hong Kong for the Years 2000–2010
By Ian McFeat-Smith
Despite a present, short-term economic recession, a remarkable enthusiasm exists in Hong Kong for building infrastructure including major tunnel projects. This paper provides details of current an
Jan 1, 2001
-
Fine Mineral Screening Using The New Pansep Screen
By R. Buisman, K. Reyneke, M. Fullam, J. V. Brown
Most mineral processes currently in use, such as flotation, spirals, gravity concentrators, etc., are only effective over a small range of sizes, hence the upstream need for technology to accurately c
Jan 1, 2001
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility
By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Dewatering Solutions to Groundwater Control and Environmental Problems — Sheppard Subway Expansion — Toronto, Ontario, Canada
By Andy Ingriselli, Andrew Famiglietti, John Westland, Greg Landry
Atlas Dewatering was contracted to install and maintain a groundwater control system for the new Bessarion Subway Station and the Tail Track Structure on the Toronto Transit Commission’s new Sheppard
Jan 1, 2001