Improvement Of Cyanidation At New Britannia MineBy G. Deschenes, M. Fulton
The New Britannia Mine processes a qumtz-carbonate gold ore containing 4.63 git Au at a rate of 2,200 tpd. The ore contains approximately 3 .0% arsenopyrite, 2. 7% pyrite and the rest is gangue minera
Jan 1, 1999
-
Mine To Mill Integration - The Next Step ImprovementBy J. O. Craig Imrie
Mine operations are being squeezed to do more with less. This is not new. But, where do mine operators turn for the next stage of improvement? Many have waged strong wars on the cost reduction front a
Jan 1, 1999
-
Commercial Status Of BioleachingBy Corale L. Brierley
This paper lists commercial bioheap and stirred tank bioleach operations and explains the status of these operations. A total of 17 commercial-scale bioleaching plants have been commissioned. Bioleac
Jan 1, 1999
-
Bio-Indicator Evaluation Of Water Quality Impacts From Inactive And Abandoned Mines In The Bear Butte Creek Basin Of The Black HillsBy A. D. Davis
Environmental impacts from acidic mine drainage are growing national concerns that are particularly acute in the headwaters of the Rocky Mountain region. In the Black Hills of South Dakota, approximat
Jan 1, 1999
-
Accuracy Analysis Of GIS-Based Coal Resource EstimationBy E. Westman
Geographic Information Systems (GIS) are becoming a more commonly used tool for resource estimation as they provide not only a database management platform, but also the graphical capabilities to visu
Jan 1, 1999
-
The Sage Mill ProjectThe Sage Mill Project w approved by Santa Fe Pacific Gold Corporation's Board of Directors in October 1994. The Sage Mill Project included a pressure oxidation plant designed and constructed to p
Jan 1, 1999
-
A New Approach For Removing Talc For Upgrading Molybdenite OresBy X. K. Jiang
Upgrading molybdenite ore can be technically difficult and expensive if talc is a major impurity in the ore. The layered structure of molybdenite and talc decreases the surface specificity of floatati
Jan 1, 1999
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By K. H. McDaniel, L. Griswold
The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1999
-
Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By E. R. Bauer
The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove
Jan 1, 1999
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
Application Of Economic Parameters And Cutoffs During And After Pit Optimization (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By B. K. Baird, P. C. Satchwell
The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each
Jan 1, 1999
-
Application Of Economic Parameters And Cutoffs During And After Pit OptimizationBy B. K. Baird
The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each
Jan 1, 1999
-
Coal Mine Subsidence Prediction Using A Boundary-Element ProgramBy Keith A. Heasley
Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub
Jan 1, 1999
-
Design Of Stillwater Mining Company's East Boulder MineBy B. Strickland
The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished
Jan 1, 1999
-
Daylighting Texas Quarry's North MineBy H. V. Scotland III
Lafarge Corporation's Texas Quarry, in Baltimore MD, achieved a substantial expansion of pit reserves by removing an inactive underground mine. The day lighting program, designed, and completed i
Jan 1, 1999
-
World's Largest Shell Supported SAG Mill At The Ernest Henry Concentrator-Operating Experiences And Results (bd8b4440-35bf-451c-b7eb-2b9292ef42b9)The Ernest Henry copper-gold project is located in North West Queensland, Australia and commenced production in late August 1997. Utilizing a philosophy of selecting the biggest proven equipment avail
Jan 1, 1999
-
Approximating a project's rates of returnBy M. M. Hajdasinki
A project's rates of return (RORs)1, be it the internal rates return (IRRs) or one of the many IRR surrogates, frequently needs to be approximated. The success and efficiency an ROR- approximatio
Jan 1, 1999
-
Using Diagnostic Process Analysis To Improve Cash Flow At Newmont's Carlin Mill #4Mill #4 processes mildly refractory ore from Carlin Trend deposits. Diagnostic analysis of plant operating data was used to generate a mathematical model containing the key parameters influencing the
Jan 1, 1999
-
Reducing Newmont's Operating Costs And Increasing Reserves And Production in The Carlin Trend, Nevada - Technology UseBy B. D. Hansen
Newmont has been on a focused path of improving operations for many years. After the merger of Newmont and Santa Fe Pacific Gold, Newmont created significant synergies of over $50million per year in
Jan 1, 1999
-
Noranda's Exploration Strategy (f4182cc3-beca-4d56-8bde-6070cd1c6670)By D. L. Stevens
Following an in-depth scenario and strategic planning exercise in 1997, Noranda's mine production goal was set at 500,000 tonnes per year of both copper and zinc metal within five years. There ha
Jan 1, 1999