A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley
Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t
Dec 1, 2022
-
Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021By Peter Chou, Pooyan Asadollahi, Danny Lin
To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho
Jun 13, 2021
-
Back on Track: The Downtown Rail Extension - RETC2021By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021By Arash Dahi Taleghani, Pooyan Asadollahi
Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr
Jun 13, 2021
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Advance Rates in Soft Ground Tunnelling - RETC2021By Dan Ifrim
Soft ground tunneling poses major challenges to the underground industry. Most of soft ground tunnels are in highly urbanized areas, often include limited cover, and include a strong trend of increasi
Jun 13, 2021
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Updating the GBR Gold Book - NAT2022By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022
-
San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022By Jeremy Stone, Yiming Sun, John Stolz
The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc
Dec 1, 2022
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Rehabilitation of an 1880s Limestone Block Tunnel Below an Active Railroad CorridorBy Anna Eleria, Joseph Welna, Jim Herber, Nathan Campeau
Constructed by stonemasons over 120 years ago, a portion of the Trout Brook Storm Sewer Interceptor (TBI) owned and operated by the Capitol Region Watershed District in Saint Paul, Minnesota, needed r
Jun 13, 2021
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021By Herman Gill, Dani Delaloye, Madelyn Rubin
The Foothill Tunnel is a remote 16-mile-long untreated drinking water tunnel in the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy Water and Power (HHWP) system. The 14-foot horsesho
Jun 13, 2021
-
Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021By Todd Clarke, Ralf Winterberg
For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv
Jun 13, 2021
-
Karst Feature Investigation, Mitigation Design, Specification, and Contract Provisions - NAT2022By Alissa Lockett, Chris D. Breeds
Central Water Integration Project (CWIP) Segment 5-1 is the most critical segment of a regional water supply project that transfers groundwater from Burleson County to northern San Antonio, replacing
Dec 1, 2022