Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    A General Short-term Planning Model of Open Pit Mines with SemiMobile In-Pit Crusher or Traditional Truck-Shovel Haulage

    By Nasib Al Habib, Hooman Askari-Nasab, EUGENE BEN-AWUAH

    In-pit crushing and conveying (IPCC) is getting popular in deeper open pit mines as a suitable alternative to truck haulage because it offers a lower operating cost due to shorter haulage distance and

    Jun 25, 2023

  • SME
    A Study of the Leading Factors Associated with a Massive Ground Collapse in an Underground Limestone Mine in Southwestern Pennsylvania

    By Mark Van Dyke, Mark Mazzella, Gamal Rashed, Nicole Evanek, Brent Slaker

    In the past decade, there have been several incidents of massive ground collapses in underground stone mines in the eastern United States. Fortunately, these events have not resulted in any fatalities

    Jul 1, 2023

  • SME
    Using Precedence Constraints to Model the Geometry of Optimal Mining Envelopes

    By Jorge Amaya, Nelson Morales Varela, Francisco Saavedra, Gonzalo Nelis, René Gómez

    Precedence constraints are broadly used in mathematical models and algorithms for mine planning to model, for example, slope angles in open pit operations or connectivity in underground mines. Unfortu

    Jun 25, 2023

  • SME
    Using Simulation and Optimization to support the Mining Execution Plan

    By Katherine Hynard, Colin Eustace

    Development quarterly mine plans is generally time-consuming and requires consideration for many operational constraints and competing objectives. With lengthy turnaround times, there is often limited

    Jun 25, 2023

  • SME
    A Dynamic Programming Algorithm for Selecting Evenly Spaced Pushbacks from Nested Pits

    By Kadri Dağdelen, Matthew Deutsch, Thys Johnson

    Nested pit analysis in open-pit long range mine planning is used to define approximate ultimate pit limits and an initial high-level schedule in the early stages of a project. Modern ultimate pit opti

    Jun 25, 2023

  • SME
    Design Methodology of Pumpable J-Crib Stopping Wall and Jennmar High-Strength Stopping Panel Wall

    By Xiaoting Li, Richard Adasiak, Benjamin Mirabile

    Pumpable J-Crib stopping walls and Jennmar high-strength (HS) stopping panel walls are widely used for resisting high-ventilation air pressures and roof support in underground mines due to their insta

    Jul 1, 2023

  • SME
    Planning Open Pit Mines Using Direct Block Scheduling Technology

    By Mauricio Brücher, Juan Camus

    This article deals with open pit mine planning and a computer technology known as Direct Block Scheduling, or “DBS”. This is an emerging technology for modeling mine exploitation strategies using mixe

    Jun 25, 2023

  • SME
    Surface and Highway Subsidence Characteristics Due to Longwall Mining Based on Long-Term Field Monitoring

    By Jie Li, Longxiang Li, Wenbing Guo, Gaobo Zhao, Yuhang Hu

    Surface subsidence caused by underground longwall mining is a very complicated process in time and space, influencing building and structures on the surface of the mining area, including houses, pipel

    Jul 1, 2023

  • SME
    A Comparative Study of the Application of Machine Learning Techniques to Analysis and Prediction of the Market Prices for Precious Group Metals

    By Milka Madahana, John Ekoru

    For efficient management of operations, mining companies are required to be able to predict potential scenarios for main market factors. Competitive advantage and value creation are established throug

    Jun 25, 2023

  • SME
    Mining Data Collection, Storage, and Interpretation Method Advancements

    By Jay Nopola, Christopher Johnson, Matthew Minnick, Erik Hemstad, Erik Walega

    Mining data collection, storage, and interpretation methods have progressively changed over time. Data collection, for the most part, has transitioned from handwritten notes and logs based on manual g

    Jun 25, 2023

  • SME
    Electric Vehicle Fleet Optimization Software (EV-FOS) for Planning and Optimizing BEV Fleets in Any Mining Environment

    By Robert Rennie, Taylor Davies, Ahsanul Rafi

    Electric locomotives powered by extensive electrical cabling systems were prevalent in the mining industry in the early days of the 20th Century [1]. Since the movement of tethered electrical mining l

    Jun 25, 2023

  • SME
    Ore Control Data Driven Method for Estimating the Bulk Ore Sorting Value at Base Metal Open Pit Mines

    By Miguel Carrera, Jose Arnal, Julian Ortiz, Maarten Haest, Fouad Faraj

    ShovelSense is a complete solution for bulk ore sorting at the mine face that combines robust shovel bucket mounted X-ray fluorescence sensors, with real-time material classification, fleet management

    Jun 25, 2023

  • SME
    Applications of Digital Twin Technology in Productivity Optimization of Mining Operations

    By Javad Sattarvand, Milad Ghahramanieisalou

    As new technologies are introduced to the mining industry, the challenges related to their safe assimilation and the potential changes they bring to mining techniques necessitate adjustments to the cu

    Jun 25, 2023

  • SME
    Drone-Based Applications for Tailings Dam Monitoring

    By Jose A. Gomez, Javad Sattarvand

    Failures of tailings dams have been happening lately. Due to the lack of laws on particular design criteria and stability requirements related monitoring during construction and maintenance, they are

    Jun 25, 2023

  • SME
    A New High-Performance Approach to Block Model Governance and Data Democratization

    By Cesar Carrasco, Heath Arvidson, Mark Forster

    Block models built to represent the geology and rock characteristics of mineral deposits represent huge complex data sets, which form the basis of strategic and business planning, and public reporting

    Jun 25, 2023

  • SME
    Artificial Intelligence Algorithm for Tailing Storage Facility Soil Classification Based on CPT Measurements

    By Paweł Stefaniak, Natalia Duda-Mróz, Sergii Anufriiev, Wioletta Koperska

    Due to the high environmental risks and negative impact of a failure, tailings storage facilities (TSFs) need constant monitoring. Advanced mathematical models have been developed in the past to predi

    Jun 25, 2023

  • SME
    New Approach on the Development of Operational Fleet Management Systems Using Adaptative AI Techniques

    By Kadri Dagdelen, Lee J. Zamalloa

    Modern surface mining operations are always seeking for minimizing costs while increasing production rates, among the optimization of other specific tasks that have an impact on the economics of the m

    Jun 25, 2023

  • SME
    Geotechnical and Hydrogeological Data Collection for the Mining Industry: Tales from the Field

    By Steven Keim, Steven Stansfield, Kevin Andrews

    Geotechnical, geological, and hydrogeological fieldwork and data collection for the mining industry is often conducted by younger, less-experienced staff members. In many cases, fieldwork personnel ar

    Jul 1, 2023

  • SME
    Maximum estimation error correlation between short and long-term production volumes

    By V. C. Koppe, J. F. C. L. Costa, D. M. Marques, A. Amaral

    Errors associated with estimating the grade of an attribute of interest in a deposit can compromise planning, sequencing, and mineral beneficiation decisions. Several factors are associated with estim

    Jun 25, 2023

  • SME
    Camera-Aided Technology for Underground Mine Safety (CAT-UMS)

    By Angelina Anani, Nathalie Risso, Carlos Olmos de Aguilera

    The traditional approach to safety clearance monitoring and proper PPE usage in underground mines is time-consuming, costly, and susceptible to negligence. However, automated real-time monitoring can

    Jun 25, 2023