Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Economic Sensitivity Analysis Using GeostatisticsBy Rex C. Bryan
An application of geostatistics to financial decision analysis is the linking of reserve parameters estimation precisions to a mine economics computer program calculating profitability. The estimates
Jan 1, 1982
-
Canadian Potash Developments 1965 - IntroductionBy C. M. Bartley
In world-wide mining circles countries become known by the principal minerals they produce. The production of iron, copper, phosphate and sulphur in the United-States-has-been particularly significant
Jan 1, 1966
-
Seepage Through Partially Saturated Soils Below A Uranium Tailings PondBy G. L. Bloomsburg, E. G. Zahl
INTRODUCTION During the past decade, disposal of mine and mill waste material has become an increasingly important issue. Problems of structural stability and seepage effects on stability have been
Jan 1, 1980
-
Wet Dielectric SeparationBy I. J. Lin
We have studied the possibility to use electrical phenomena in order to selectively separate minerals with various densities and dielectric constants in non-homogeneous electric fields. This technique
Jan 1, 1977
-
A Mineralogical, Stratigraphic, And Geochemical Profile Of Trona Bed 17 In The Solvay Trona Mine Near Green River, WyomingBy Paul L. Boni
Trona, Na3(CO3)(HCO3) ? 2H20, is mined in quantity from saline facies of the Eocene Green River Formation of southwestern Wyoming. The Green River deposits are the world's largest known resource
Jan 1, 1999
-
Draw Point Mapping At The Questa Molybdenum Mine, Taos County, New MexicoBy M. G. Schulz
Mining of molybdenum at Questa, New Mexico has been accomplished by block cave methods since August, 1983. As caving progresses, a periodic geologic evaluation is made of the rock-types present in fin
Jan 1, 1985
-
Single Bubble Terminal Velocity-Experiment and ModelingBy Yongqin Zhang
A single bubble released into surfactant solution first accelerates, reaching a maximum velocity then decelerates to reach a terminal velocity. Modeling this "velocity profile" is fundamental to under
Jan 1, 1999
-
Draw Point Mapping At The Questa Molybdenum Mine, Taos County, New MexicoBy D. E. Ranta, M. G. Schulz
Mining of Molybdenum at Questa, New Mexico has been accomplished by block cave methods since August, 1983. As caving progresses, a periodic geologic evaluation is made of the rock types present in fin
Jan 1, 1992
-
Accessing deep orebodies using mechanical excavation equipmentBy W. Burger
For the development of deep, hard rock, mines fast access to the orebody is critical. In some cases the mineralized area is more than 1,500 m (5,000 ft) below surface. Excavation of shafts or declines
Jun 1, 2010
-
Geotechnical and Mechanical Interactions Using the Earth-Pressure Balanced Shield Technology in Difficult Mixed Face and Hard Rock ConditionsBy Ulrich Maidl
The use of EPB shields in the so-called mixed face conditions has set new demands to man and machine in EPB shield tunneling. EPB shields were initially conceived to drive in the pressurized closed mo
Jan 1, 2003
-
A Simple Precracking Procedure for Fracture Toughness Testing In Rock - Application to Roof Rock Above No. V Coal (Indiana)By Thomas M. Tharp, Mark A. Travers
A new method is presented for precracking three-point bending specimens for fracture toughness testing. A notched specimen of rectangular cross section is placed on a flat loading platen, with paper b
Jan 1, 1986
-
Rum Jungle Mine Site Remediation: Relationship Between Changing Water Quality Parameters and Ecological Recovery in the Finniss River SystemBy John R. Twining, Michael D. Lawton, Ross A. Jeffree
The Finniss River system in tropical northern Australia has received 'acid-drainage' contaminants from the Rum Jungle uranium/copper mine site over the past 4 decades. Following mine-site re
Jan 1, 2000
-
Application Of "SISCOM" Mine Monitoring System To Steep Face Performance AnalysisBy J. L. Fuentes
The so called 'SISCOM' is a General Purpose, microprocessor-based Monitoring and Control System, developed by AITEMIN to meet the requirements of Spanish Mining Industry in - the field of au
Jan 1, 1986
-
The Method Of Bullflex® - An Entire New Approach In Making Steel-Rib Supports For Roadways Far More EffectiveBy Werner A. Dürrfeld
The Bullflex® System was introduced as a substitute for timber and debris lagging in mines and to create an in-situ early-stage interlocking effect between steel supports and the rock wall. As deplace
Jan 1, 1981
-
A procedure for the characterization of the internal structure of the Andrews-Mika diagramBy C. L. Schneider, R. P. King
The ability to predict the liberation spectra that will be produced by a closed-continuous grinding circuit is of fundamental importance for the design, optimization and control of most operations in
Jan 1, 1995
-
Improving Overall Plant Performance With the Aid of Quantitative Models for Various Unit Operations Developed from In-Plant StudiesBy K. R. Weller, U. J. Sterns
The goal of most in-plant studies is to identify factors that limit overall plant performance. A major finding from such studies is that interactions between unit operations are always important, usua
Jan 1, 1989
-
The Use of Risk Assessment, Risk Management, and Engineering/Economic Feasibility Analysis in Remedial Decision Making for Contaminated SoilsBy E. J. Dorward-King, R. J. Kadeg, S. Pavlou
Risk assessment, risk management, and engineering/economic feasibility analysis are presented as three effective, practical tools for decision making in the remediation of contaminated soils. Risk ass
Jan 1, 1992
-
A Watershed Approach To Evaluating Impacts Of Abandoned Mines In The Bear Butte Creek Basin Of The Black HillsBy A. D. Davis
This project took a watershed approach in the evaluation of water-quality impacts from past mining activities and current restoration projects in the Bear Butte Creek basin, a small and well defined d
Jan 1, 1997
-
A Model For Long Range Scheduling Of The Mining Sequence For Flat Lying OrebodiesBy R. Gerling
A computer program has been developed for finding a near-optimum schedule of the mining sequence for flat lying, tabular orebodies. The deposit is divided in blocks with equal areas and definite grade
Jan 1, 1986
-
Back Calculations For The Determination Of Strength And Deformational Characteristics Of Soils In Open-Pit Slopes And Hydrofilled StructuresBy A. M. Galperin
Back analysis is a very important procedure for proper understanding of physical processes. Back analysis can be used to establish the role of different factors, define parameters to be calculated and
Jan 1, 2005