Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Discussion – Large Dozer Stripping Case Studies – Mining Engineering, Vol. 45, No. 9, September 1993, pp. 1185-1189 – Hrebar, M. J.

    By B. Beatty

    This is a response to M. J. Hrebar's paper, which tracks in detail the highly productive stripping capabilities of modern large bulldozers at two separate installations. It proves the old adage "

    Jan 1, 1994

  • SME
    Technical Note - Bivariable Planetary Cutter- Head Concept For Shaft Boring

    By D. Gu, B. Lin

    Discussion of concept Breakage of rock by machine is one of the major methods of excavation. With the development of modern engineering techniques, the advantages of using this method have become e

    Jan 1, 1996

  • SME
    Screening Media

    By C. W. Matthews

    Introduction Screening is defined as a mechanical process which separates particles on the basis of their size and their acceptance or rejection by a screening surface. The key element in this

    Jan 1, 1985

  • SME
    Study On Comprehensive Utilization Of Secondary Resources

    By Liang Ruilu, Guo Lihua

    In light of the properties on process mineralogy of the old tailings in a certain copper mine in the People's Republic of China, a new process of combined reagent and stepwise flotation is applie

    Jan 1, 1995

  • SME
    Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)

    By D. Kump

    The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.

    Jan 1, 1999

  • SME
    18. Discovery of the Ertsberg East Copper-Gold Deposit, Irian Jaya, Indonesia

    By Douglas R. Cook

    The Ertsberg East discovery was announced by Freeport in 1979 with proven geological reserves of 45 Mt (49.6 million tons) with a grade of 2.65% copper and recoverable gold values. This recently disco

    Jan 1, 1991

  • SME
    Selling Forward Increases Profits For Gold Producers

    By Thomas D. Kaufmann

    Whether pursuing hedging or speculative strategies, gold miners can increase sales revenues 1 % to 6% by constantly pricing production forward. Unlike other commodities, gold futures prices are consis

    Jan 1, 1991

  • SME
    Gold Gravity Recovery At The Mill Of Les Mines Camchib Inc., Chibougamau, Quebec

    By A. LaPlante, A. Cauchon

    This gravity circuit at Les Mines Camchib Inc. consists of two pinched sluices to bleed a feed to one of two 76 cm (30") Knelson concentrator. The Knelson concentrate is upgraded to smeltable grade wi

    Jan 1, 1990

  • SME
    Economic Geology Of Manganese

    By Jerome F. Machamer

    Ninety percent of manganese is used as an alloying element in steel. Smaller amounts are used in dry-cell batteries, in aluminum and bronze alloys, and many other uses. The element has several oxidati

    Jan 1, 2001

  • SME
    Technical Note - Knowledge-Based Decision Support System For Mining-Method Selection For Ore Deposits

    By P. Venkatasubramanian

    The selection of a mining method for a mineral deposit is a complex decision problem. Human judgment, based on experience with mineral deposits and geologic conditions, remains the single most importa

    Jan 1, 1992

  • SME
    Large Blasthole Stoping at Redsand Gruber, Norway

    By Tore M. Larsen

    The Rødsand Gruber mining company is a subsidiary of the Norwegian industrial corporation Elkem AS, and its mine is situated in the northwestern part of southern Norway. The ore from this mine is a

    Jan 1, 1982

  • SME
    Impact of Management Philosophies on Metallurgical Performance

    By R. R. Beebe

    When an economic mineral deposit is first discovered, it is almost immediately defined in terms of tonnage and grade. As exploration and assessment continue, the initial definition is ordinarily quali

    Jan 1, 1991

  • SME
    Design And Construction Options For Surface Uranium Tailings Impoundments

    By A. MacG. Robertson

    INTRODUCTION The tailings, or solid waste, remaining after uranium has been extracted from an ore and the liquid wastes associated with it contain both radioactive and other substances which, if re

    Jan 1, 1980

  • SME
    Cancer Warnings: How Justified Are They?

    By John W. Kelse

    What happens when the skull and crossbones goes on a product? In the case of cancer warnings, the consequences can be severe. If the label contains the term "lung carcinogen", you might expect to comp

    Jan 1, 1991

  • SME
    6. Ore-Body Model for Steeply Pitching, Multiseam Deposits

    By C. B. Manula

    A method for the feasibility assessment of open-pit operations using conventional shovel/ truck systems to mine steeply pitched coal seams has been applied at The Pennsylvania State University. Three

    Jan 1, 1979

  • SME
    Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures

    By Jens Classen, Martino Gatti

    "GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects

    Jan 1, 2016

  • SME
    Discussion - Large Dozer Stripping Case Studies - Hrebar, M. J.

    By B. Beatty

    Discussion by B. Beatty This is a response to M.J. Hrebar's paper, which tracks in detail the highly productive stripping capabilities of modern large bulldozers at two separate installations.

    Jan 1, 1995

  • SME
    Liquid Phase Agglomeration: Process Opportunities for Economic and Environmental Challenges

    By C. E. Capes

    Reduction in the quality of resources and attendant increase in the quantities of fines to be processed present a major economic and environmental challenge for resource - based industries. It is beco

    Jan 1, 1989

  • SME
    Modelling and Design of a Comminution Circuit Sleeper Mine The Actual Operating Data and the METSIM Model Compared

    By J. Patrick Glynn

    The paper compares the METSIM model simulation and the actual operating data at Sleeper Gold Mine in Nevada. The simulation utilized by the model is a combination of Bond's models, models for breakage

    Jan 1, 1992

  • SME
    Topsoil-Subsoil Requirements To Restore North Dakota Mined Land To Original Productivity (f9bf7e44-59cd-4926-aa63-755a7805e403)

    By J. F. Power

    Returning the original soil material to the surface of smoothed mine spoils is n practical means of restoring agricultural productivity. Research has established that high-sodium spoils in North Dakot

    Jan 1, 1978