Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Determination Of Dynamic Permeability Changes During In-Situ Leaching At Cyprus Casa Grande Operation

    Dynamic permeability is a significant hydrologic condition associated with in-situ leaching at the Cyprus Casa Grande operations. Several factors contribute to changes in the permeability conditions.

    Jan 1, 1991

  • SME
    Advanced underwater acoustics for unchained operations in deep sea mining - S2C-network solution for underwater communication, geo-referenced navigation / positioning and monitoring purposes

    By K. G. Kebkal, R. Bannasch

    "Because the operation of tethered underwater vehicles in the deep ocean or under drifting ice areas is very complicated or impossible, the application of autonomous underwater vehicles (AUV) is prefe

    Sep 1, 2014

  • SME
    Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

    By J. Chae, D. Pecha, R. Andrews

    The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro

    Jan 1, 2005

  • SME
    In-Situ Measurements Of Copper And Moisture In An Operating Heap Using Advanced Geophysics

    By K. Lang

    A test section of the upper most lift and underlying lifts of a large scale copper heap leach operation was instrumented and monitored with advanced wireline geophysics, fiber optics and resistivity e

    Feb 23, 2014

  • SME
    Breaking The Mold Using Roadheaders For Production In Hardrock Gold Mining

    By M. E. Breitrick

    Newmont Gold Company began full production in early 1995 at the Carlin East underground mine. The mine is currently producing at the rate of 900 tpd (1.000 stpd). for an annual production of 150.000 o

    Jan 1, 1998

  • SME
    Uncertainty in Mineral Resources: Why It Should Be Part of a New Mining Ethos (Part 1) - SME Annual Meeting 2026

    By M. E. Rossi

    In mineral resources, geologic and mining data are acquired, processed, analysed, interpreted and modelled, eventually serving as basis to generate predictions and production plans. This is a complex

    Feb 22, 2026

  • SME
    Dry Coal Separation With A Vibrated Air-Dense Medium Fluidized Bed - Preprint 09-112

    By M. Fan

    Dry coal separation technology has particular advantages in the applications in arid and cold regions, or low rank coal separation. The hazardous pollutants in low rank coals can not be efficiently re

    Jan 1, 2009

  • SME
    The U. S. Uranium Registry Tissue Program*

    By R. H. Moore, B. D. Breitenstein

    INTRODUCTION The United States Uranium Registry (USUR) tissue program was funded in 1978 by the United States Department of Energy (DOE) through its Human Health and Assessments Division, and regis

    Jan 1, 1981

  • SME
    Optimizing Methane Drainage Systems To Reduce Mine Ventilation Requirements

    By George Aul, Richard Ray

    Short-hole horizontal degasification systems have been utilized in Island Creek's Virginia Division mines since 1986. These systems remove methane from the coal seam in advance of longwall mining

    Jan 1, 1991

  • SME
    Knelson Concentrator Aids in Processing Shift from Silver to Gold Production

    The Kinross DeLamar Mine has been operated for more than 17 years producing precious metals dore' from ores, principally silver bearing with associated gold co-products. In late 1995 a new orebod

    Jan 1, 1997

  • SME
    Process Improvements At Samitri (Brazil) Using Derrick Screens

    A major Brazilian iron ore producer, SA Minerayao da Trindade (Samitri), has recently completed modifications at two operations which involve the use of Derrick high frequency vibrating screens. Detai

    Jan 1, 1997

  • SME
    The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure Leaching

    By C. G. Anderson

    Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p

    Jan 1, 2001

  • SME
    Municipal Sludge Biosolids in Mined Land Reclamation – Great Basin Pilot Study

    By David Loomis

    Unlike previous gold mining booms in Nevada's Great Basin, the current boom includes a serious commitment to mine reclamation. Many of the smaller mines began reclaiming in the late 1980s but met

    Jan 1, 1993

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • SME
    Network Conditions That Ensure Correct Prediction Of Airflow Direction When Developing Connecting Airways (b6b919b1-beb1-4e00-ba6b-5570aea37183)

    By J. M. Mutmansky

    The usual method employed to determine the direction of flow in a connecting airway in advance is to conduct a survey between the two existing nodes being connected by means of the new airway. It is t

    Jan 1, 1999

  • SME
    Computational Fluid Dynamics Modeling Of A Methane Gas Explosion In A Full-scale, Underground Longwall Coal Mine

    By CLAIRE STREBINGER, ADITYA JUGANDA, JURGEN F. BRUNE, GREGORY E. BOGIN JR.

    Methane gas explosions are a major risk in underground coal mining operations. The severity of such explosions can range from local area damage to massive loss of miners’ lives along with significant

    Aug 1, 2022

  • SME
    Methods To Minimize Injuries In Materials-Handling Processes In Underground Mines (8a2ca766-e5d6-42d2-94f0-4090d406125e)

    By C. C. Clark, P. W. Patton, B. M. Stewart

    Handling materials in underground mines continues to be a major safety problem. To help reduce materials-handling injuries, researchers at the Spokane Research Laboratory of the National Institute for

    Jan 1, 2002

  • SME
    Short Tunnels with Shallow Cover

    By David Smith

    Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact

    Jan 1, 2005

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • SME
    Cable Bolting For Pillar Recovery At The Magmont Mine

    By S. R. Dismuke

    Ore at the Magmont Mine in southeast Missouri is extracted by the room and pillar method on two and sometimes three horizons. In 1991, an innovative plan was formulated for recovery of high grade ore

    Apr 13, 2011