Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Understanding Roof Deformation Mechanics and Parametric Sensitivities of Coal Mine Entries Using the Discrete Element MethodBy Rami Abousleiman, Gabriel Walton, Sankhaneel Sinha
"Although conventional coal mine designs are conservative regarding pillar strength, local failures such as roof-falls and pillar bursts still affect mine safety and operations. Previous studies have
Jan 1, 2019
-
Efficiency Of Copper Supported Vermiculite Nano-Antibacterial Material Against Escherichia ColiBy S. Shi, J. Y. Hwang, B. Li
Silver, copper, and zinc are commonly known elements with antibacterial and antifungal capabilities. Attempts have been made to dope silver on minerals, glass, and ceramics and the resulting materials
Jan 1, 2002
-
Production, consumption and cost of energy for surface mining of bituminous coalBy V. Kecojevic
The objective of this research was to establish the relationship between production, consumption and energy cost in the surface mining of bituminous coal. Specific energy sources such as diesel, gasol
Jan 1, 2014
-
Integrating a Drill Rig into the Digital Mine 4.0 Ecosystem - SME Annual Meeting 2025By Max Friedemann, Alexandros Bousdekis, Anna Gustafson, Helmut Mischo, Håkan Schunnesson
Many devices used in mining are not monitored by sensors or do not have their own intelligence. By retrofitting sensors and real-time data processing, machines can be integrated into an existing digit
Feb 1, 2025
-
Measuring Carbon Emissions From Base Metal Mine SitesBy M. J. Farrell
The threat of global warming and its prominent position in public discussion and political debate requires all industry to take stock of its contribution to rising atmospheric concentration of greenho
Jan 1, 2009
-
Downstream Improvements on Upstream Dams: An Owner’s Perspective of a Paradigm Shift - SME Annual Meeting 2024By Christopher R. Winter
Mining companies have sharpened their refocus on their tailings management strategies in recent years. Mining companies with tailings storage facilities that use the upstream construction method have
Feb 1, 2024
-
Machinery And Equipment Design As Dictated By Energy ConservationBy G. Kris Kapoor
Each new period of public concern, whether rooted in things political, social, economical, or technological, brings with it new words or phrases which highlight that new interest. With people's a
Jan 1, 1975
-
A Goal Programming Model For Determining The Optimal Production Schedule Considering Penalties Or Bonuses Dependent On Quality ? IntroductionBy Ralph W. Barbaro
In many parts of the country, electric utilities use spot market coal to make up the difference between the amount of contract coal and the total amount burned. The utilities involved will normally ha
Jan 1, 1983
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
An Investigation Of Alternative Sag Mill Recycle Treatment OptionsBy J. L. Vanderbeek
Investigations have been conducted at Chino Mines Company into the effect that SAG mill recycle material (critical size) exerts on SAG mill throughput and specific energy requirements. Tests were cond
Jan 1, 1985
-
Technical Note - Testing Procedure For The Determination Of Coal-Seam Compressive Strength In The LaboratoryBy V. B. Achanti, A. W. Khair
Developing a laboratory procedure for the determination of coal-seam compressive strength has been a subject of discussion for many decades, and the reliability of laboratory determinations is often t
Jan 1, 1997
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
A Comparison Of Belt Loading Models And Simulated Belt CapacityBy S. D. Thompson
Several discrete-event simulation models have been developed for designing the conveying system capacities of underground coal mines. Most of these models require the use of a step-function approach t
Jan 1, 1997
-
Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022By Jim Buckley, Ryan Sibley, Scott G. Giltner, Thomas Pallua, Joe Schrank, Robert Cidlik
Because of variation in rock type and site conditions, it is important to create site-specific prediction models for peak particle velocity (PPV) and understand instrumentation mounting locations to b
Dec 1, 2022
-
Kennecott Utah Copper Smelter ModernizationBy C. J. Newman
Before 1995, the smelting process at the Kennecott Utah Copper Corp. (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. When considering expansion, it was decided that the exis
Jan 1, 1999
-
Prestressed Concrete Pressure TunnelsBy David T. Swanson
The term "pressure tunnel" in the broad sense includes all hollow spaces, aligned along an axis and surrounded by rock, which are suitable for pressurization. In particular, this category includes:
Jan 1, 1981
-
An Energy Balance For The Second Underground Coal Gasification Experiment, Hanna, WyomingBy Dennis D. Fischer
The second underground coal gasification experiment conducted by ERDA's Laramie Energy Research Center at a site near Hanna, Wyoming, was completed on July 30, 1976. During the experiment product
Jan 1, 1977
-
Snow Tunneling at the South PoleBy John H. Wright
The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)
Jan 1, 2002
-
Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024By Joseph Goessling, Mark Kroncke, James Parkes
The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi
Jun 23, 2024
-
Mill Expansions At P.T. Freeport IndonesiaBy R. L. Russell
Production at Freeport Indonesia's Ertsberg open pit copper/gold mine started in 1972 at a rate of 7500 t/d. Mill throughput remained at that rate for a number of years until the discovery of the
Jan 1, 1994