Detoxification Of Spent Heaps With Hydrogen PeroxideBy M. Quamrul Ahsan, Andrew Griffiths, Edward P. Jucevic
Heap leaching of precious metal ores using the cyanide process is extensively used in the Western U.S.A. for extracting gold. Consequently, the impact of cyanide in the spent heap is closely examined
Jan 1, 1989
-
A Methodology To Determine In Situ Rock Mass FailureBy K. Y. Haramy
A scale-invariant theory of the strength and deformability of rock masses in static equilibrium and at incipient failure is proposed. The theory provides a rationale for designing structures in rock.
Jan 1, 1995
-
Workability Index For Utah Coal MinesBy S. P. Singh
In order to simulate the operation of coal extraction machines, a portable workability instrument has been designed. Initially, the tests were performed with the instrument on modeling material, which
Jan 1, 1984
-
Determining Value-Added Opportunities in Industrial MineralsBy Steven B. Van Kouteren
Value added is a loosely used qualifier in the industrial minerals industry. What exactly does it mean? What does it take to make a value-added product? More importantly, how does a company maintain t
Jan 1, 1990
-
The 'How to' of plant design: SRK Consulting shares the building blocksThe process design of a metallurgical plant follows logical steps, one built on another, to define the circuit requirements. The methodology used and documentation produced is the same for a pre-feasi
May 1, 2013
-
Gold-Copper Ores Processing / Flotation Process Optimization By The Development Of An On-Line Expert System (308240b5-f416-4047-a45b-a49d3ac7a2e0)By Y. Breau, F. Robichaud
The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in
Jan 1, 2002
-
Discussion – Determination of the Optimum Lifetime of a Mining Project Using Discounted Cash Flow and Option Pricing Techniques – ME Vol.44, No.10 1992, pp.1262-1268 – Cavender, B.By G. Le Bel
The paper proposes three methods to determine optimum lifetime of a mining project1. The conclusion is that the three methods arrive at the same optimum production rate (by coincidence). It is also st
Jan 1, 1993
-
Special Issue : Minicomputers in the Minerals IndustryBy Louis C. Just, Grahan A. Mathieson
Low cost, greater operating flexibility, and relatively simple operation are just three of the reasons for using minicomputers in the mining industry. No less than a dozen US manufacturers have sold t
Jan 11, 1981
-
New kriging method for estimation from strings of data in a finite domain - SME Transactions 2009By C. V. Deutsch, O. Babak
A longstanding problem in geostatistics is that kriging usually assigns significantly greater weights to end samples in strings of data than it does to central samples. These weights are theoretically
Jan 1, 2009
-
Coal Creek Preparation Plant Mid-Continent Coal & Coke Company Carbondale, ColoradoBy John A. Reeves
The Coal Creek Preparation Plant is the coal cleaning facility of Mid-Continent Coal and Coke Company. Located three miles west of Redstone, Colorado, and at an elevation of 8,040 feet the preparation
Jan 1, 1967
-
Tunnelling With Hydraulic Drills At Aabjoera Hydro Electric Plant In NorwayBy Alf Thidemann, Per Marius Nilsen
Tunnelling with hydraulic drills has been a success in Norway. In the fall of 1976 excavation of tunnels for the development of the Aabjoera scheme was started. Two and a half years later a total of 2
Jan 1, 1979
-
Employing Operational Excellence to Optimize Underground Haulage SystemsBy J. Sidhom, W. Fourie
"As the mining industry continues to face difficult challenges the need to persistently focus on productivity and utilization of labor and equipment costs will intensify. With these challenges in mind
Jan 1, 2017
-
LKAB’s Kiruna Plant Leads in Developing Plantwide Process ControlContinuous improvement has become the watchword of the 1990s for most iron-ore-processing operations. In many instances, this improvement has been achieved through stepwise application of advanced con
Jan 1, 1995
-
Discussion - The Sales Comparison Method Works Best For Preliminary-Stage Mineral Projects, But Make Adjustments Carefully: A Response To ?Sales Comparison Valuation Of Development And Operating Stage Mineral Properties? (T. R. Ellis) - DiscussionBy Stephen Semeniuk
Working with junior mining companies as a valuer, my experience with regulators is that simplicity works and the sales comparison method is the way to go. What I like about Mr. Ellis?s approach (as i
Jan 1, 2012
-
Some Legal Problems Encountered In The Acquisition Of A New Mineral PropertyBy R. E. Driscoll
The exploration, geologist of necessity has to have a wide working knowledge of many specialties other than hiw own, First he has to use his own technical background to find a deposit,, of a mineral t
Jan 1, 1958
-
Using Neural Networks To Model Column FlotationBy L. Hales
Neural networks are a generalized, multivariable non-linear modeling technique that can be used to model mineral processing operations. Neural networks will be described as will their use in modeling
Jan 1, 1996
-
Automation of a Mobile MinerBy John Turner, David Carey
The Robbins Mobile Miner demonstrates the successful combination of hard rock excavation technology and the latest electronic control technology. The mobile miner, a partial face hard rock tunneling m
Jan 1, 1993
-
Determination Of The Optimum Lifetime Of A Mining Project Using Discounted Cash Flow And Option Pricing Techniques (PREPRINT NUMBER 92-28)By B. W. Cavender
The operating lifetime, or production rate, selected for a mining project is among the most important factors influencing the design and ultimate economic success of the project. An incorrectly-determ
Jan 1, 1992
-
Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54By J. J. Gusek
Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions
Feb 24, 1997
-
Interaction Of Design, Construction And Owner On Small Diameter Tunnels: Northeast Side Relief Sewer System, Milwaukee Water Pollution Abatement ProgramBy Allen J. Sobczak, Peter J. Peters
The five tunnel contracts of Milwaukee Northeast Side Relief Sewer System are about 80 percent complete. The tunnels are all excavated for 1.9 meter (6'-0") finish diameter sewers in a variable r
Jan 1, 1983