Assessing the contribution of underground in-situ coal gasification (UICG) within a sustainable development frameworkBy Z. Hyder, M. Karmis
Underground or In-situ Coal Gasification (UCG or UICG), though not a new concept, is now attracting considerable global attention as a viable process to provide a "clean" and economic fuel from coal.
Jan 1, 2011
-
Impact Of Groundwater Chemistry On Wall Rock Chemical Leaching And Pit Lake CharacterBy D. Richers
When modeling predictive pit lake chemistry, groundwater chemistry is integrated with the affected portions of the wall rock and chemistry of the lake in a complex series of mixing. Fractions of the s
Jan 1, 2012
-
Exploring For High-Calcium Limestone Deposits In A Karst TerrainBy Bruce H. Mason
The exploration for a commercially acceptable deposit of limestone is consid¬ered by many to be a relatively easy task; however, trying to locate a zone of high calcium limestone of economic thickness
Jan 1, 1974
-
Evaluation Of The NEPA Process For Estimating Water Quality Impacts At Hardrock Mine SitesBy Kimberley MacHardy, Ann Maest, Greg Lawson, James Kuipers
Although water quality predictions are often made in Environmental Impact Statements (EIS's) as part of the National Environmental Policy Act (NEPA), comparisons between predicted and actual wate
Jan 1, 2005
-
Burying The Dinosaurs: Achieving Breakthrough Safety Performance Without A Safety DepartmentBy B. Cavender
Safety departments have traditionally been held responsible for the safety performance of their division or company. This approach leads to a lack of ownership of safety issues by the larger organizat
Jan 1, 2000
-
An Operations Research Approach To The Equipment Replacement Problem ? IntroductionBy Hubert E. Sherer
The mining industry is presently one of the most heavily capitalized industries in the U.S. (U.S. - Statistical Abstracts, 1979). U.S. sales of new mining equipment (not including environmental, prepa
Jan 1, 1982
-
Artificial neural networks to determine ventilation emissions and optimum degasification strategies for longwall minesIn longwall mining, premining prediction of methane emission rate depends on a number of geological factors, geographical factors, and operational factors. These same factors also can impact the selec
Jan 1, 2009
-
Passive Radon Dosimetry Using Track Etch Detectors - A Comparative StudyBy E. Piesch, M. Urban, G. M. Hassib
INTRODUCTION In radon dosimetry diffusion chambers with passive [a]-detectors are now in current use to investigate the long-term accumulated indoor exposure of radon and daughters. For the diffusi
Jan 1, 1981
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
Doe’s Vision 21 Program - Clean Energy Plants For The 21st CenturyBy L. A. Ruth
Vision 21 is a government/industry/academia cost-shared partnership to develop the technology basis for integrated energy plants that will, early in the 21stcentury, result in the deployment of ultra-
Jan 1, 2000
-
High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case HistoryBy Joseph J. Diehl, Brian B. Khalighi
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI
Jan 1, 1997
-
Ground Support - Rockbolt Drills and JumbosBy Robert L. Sundeen, Richard V. Wenberg
INTRODUCTION Early rock-bolting practice usually consisted of ran¬domly installing bolts, using hand-held drilling equip¬ment such as air-leg mounted sinkers or stopers. As bolting technology evolv
Jan 1, 1982
-
Comparison of Different Blast Design Models, Using a Blasting SoftwareBy Roozbeh Afzali
Designing an appropriate tunnel blasting pattern reduces the cost of rock breakage and subsequent operations such as loading, haulage and support of tunnels. For that reason, we developed a software t
Jan 1, 2008
-
Organizing A Multibillion-Dollar ProjectBy B. R. Waples
The first reaction in organizing a project of magnitude is that it's the same as smaller projects -- just bigger. This is not totally correct. The industry's record of completing big-money j
Jan 1, 1982
-
Caldecott Improvement ProjectBy William W. Edgerton
The California Department of Transportation (Caltrans), the Contra Costa Transportation Authority (CCTA), and the Alameda County Congestion Management Agency (Alameda CMA) are involved in a unique par
Jan 1, 2008
-
Environmental Aspects And The Feasibility Of Economic Recovery Of Metals And Energy From Coal Washer Waste DepositsBy John E. Edkins
Metal sulfides, chiefly pyrite and mFnor sphalerlte zssociated with che Herrin (No. 6) coal member of the Pennsylvania Carbondale Formation, have been concentrated in a coal refuse deposit in southern
Jan 1, 1981
-
Centrifuge Modelling of Tunneling-Induced Settlement Damage to 3D-Printed Surface StructuresBy M. J. DeJong, R. J. Mair, S. Ritter, G. Giardina
"For urban tunneling projects it is essential to predict and prevent building damage. Although various case studies and experiments have shown that buildings considerably modify greenfield soil moveme
Jan 1, 2016
-
Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CABy Jeremy Theys
The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu
-
Eddy-Current Separator Technology As A Novel Approach To Alaskan Placer Gold RecoveryBy D. A. Norrgran, J. A. Wernham, D. E. Walsh
A qualitative test program was sponsored jointly by the University of Alaska and Eriez Magnetics, in order to study placer gold nugget recovery using an eddy-current separator. Various gold nuggets f
Jan 1, 2003
-
Recycling Power Plant Fly Ash And Its New Application For Construction Materials - Preprint 09-037By N. S. Kim
Economically favored Cr and Cu leaching out process from spent power plant fly ash (PPFA) had been investigated. PPFA, bearing of C, S, V, Ni, Cu and Cr, has been widely used as an assistant fuel in c
Jan 1, 2009