Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Selective Flocculation Of Fine Phosphate Materials (8c939b54-ad68-4cf0-a2e6-037610cedf74)By H. Sis, D. Dahlin, S. Chander, C. Summers
Bench-scale selective-flocculation tests were conducted on samples of Florida and Western phosphate process tailings. Physical, mineralogical, and surface characteristics were determined for both typ
Jan 1, 2002
-
Surface Force Measurements Between Precious Metals Under Controlled Potential ConditonsMany investigators measured surface forces between hydrophobic macroscopic surfaces using atomic force microscope (AFM). Some investigators observed long-range attractions and attributed them to the p
Jan 1, 2012
-
Fluorspar Process Plant Dust StudyBy Michel Grenier, Gopal Kunchur, Stephen Hardcastle
This paper presents the findings of a dust study in a typical fluorspar processing plant. The primary purpose of this study was to identify employees and occupational groups exposed to high dust level
Jan 1, 1991
-
Occupational Ergonomics: Ergonomic Issues In The Mining IndustryBy E. A. Metz
Ergonomics is the art and science that tries to understand the complex interrelationships among employees, their work environment, equipment, work methods and job demands. Coal and metal/nonmeta
Jan 1, 2002
-
A Comparison of Grouting Through Segment Ports Versus Grouting Behind the Tailcan of Two Segmentally Lined Rock Tunnels—Coxwell Sanitary Bypass Tunnel Project in Toronto, ON and Westerly Storage Tunnel Project in Cleveland, OH - RETC2021By William Hodder, Lisa Smiley, Ehsan Alav
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km and be lined using a precast concrete segmental tunnel liner with an intern
Jun 13, 2021
-
Completion of H-3 Highway TunnelBy Jan L. Reichelderfer, Thomas L. Richardson
Completion of the H-3 Highway Tunnel Project was a critical element in opening this award winning project. The exploratory tunnel was completed as a maintenance tunnel and included difficult shafts ex
Jan 1, 2001
-
Real Options: A Tool For Managing Technical Risk In A Mine PlanBy J. A. Botín
NPV is a static measure of project value which does not discriminate between levels of internal and external risk in project valuation. Due to current investment project?s characteristics, a much more
Jan 1, 2012
-
An Auxiliary Cross-Pit Mining System For Selective Removal And Replacement Of Soil And OverburdenBy David A. Fawcett
An auxiliary cross-pit mining system, working in tandem with the prime excavator, is evaluated technically, operationally and economically for application in the selective removal and replacement of s
Jan 1, 1981
-
Instrumentation for Monitoring Ground Movements: Central Artery/Tunnel Project, Boston, MassachusettsBy T. A. Marcotte, D. J. Bobrow, S. Vaghar
This paper discusses the geotechnical instrumentation program on the Central Artery/Tunnel Project, in Boston, Massachusetts. Particular attention is given to a state of the art Graphic Information Sy
Jan 1, 1997
-
The 2000’s – SME Increases Internet PresenceBy William M. Gleason
Hard times continued to plague the industry when the calendar rolled over to 2000. During 1999, the United States economy had grown vigorously, capping the longest economic expansion in United States
Jan 1, 2007
-
Moving Forward on New York’s Second Avenue SubwayBy David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh
This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists
Jan 1, 2007
-
Wolf Creek Upper Narrows Project–South Fork, Colorado, Construction of a Large Cross-Section Drill and Blast Highway Tunnel in Alpine Conditions with Multiple Staggered HeadingsBy Lyman File
This paper discusses the overall challenges to construct a two-lane highway tunnel located in southwestern Colorado on U.S. Highway 160 for the Colorado Department of Transportation by the Kiewit West
Jan 1, 2003
-
The Fallacy of Tunnel Formwork RemovalBy Wern-ping (Nick) Chen
In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t
Jan 1, 2008
-
Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero EmissionsBy Tuncel M. Yegulalp, Anuta Belova
This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu
Jan 1, 2005
-
Toward a Mine-Wide, Real-Time, and Autonomous Geotechnical Change Detection, Monitoring, and Prediction Framework for Underground MinesAdverse ground behavior events, such as convergence and falls of ground, are some of the most significant challenges and hazards in underground mines. Our goal is to work toward mine-wide, digital, an
Jul 28, 2020
-
Creating A New Work Environment Through HF/E - Design Considerations For A Successful Control Room ProjectBy I. Nimmo
Since the beginning of Aluminum mining and refining the industry has lived with distributed control rooms and suffered from many behavioral problems common with this design. When Human Factor/Ergonomi
Jan 1, 2011
-
O&K Seeks to Become Major Force in US Excavator MarketBy Steve Kral
One of the world’s most successful mining shovel manufacturers believes its name is not very well known in North America, particularly in the United States. And there are plans under way to improve o
Jan 1, 1996
-
Improving performance of heavy mineral processing plants through Six SigmaBy M. Akser, M. Tomas
Six Sigma is a methodology that uses a structured and disciplined approach to improve process performance (higher throughput, better recovery, lower cost, shorter cycle time, etc.). Specially trained
Jan 1, 2005
-
Transport Of Gold In High Temperature, Low Pressure, Gas Phases With C12, Co, H2s: A Clue To Gold Mobilization From The Lower CrustBy W. S. Fyfe, R. J. Puddephatt, S. Zhou
Gold is easily mobilized at temperatures within range 600-11OO°C by gases such as Cl2, CO, H2S, in gas mixtures, at low pressures. Such gases are relevant to conditions of granulite facies metaomorphi
Jan 1, 1989
-
The Pebble Porphyry Cu-Au-Mo Deposit, Alaska - IntroductionBy M. J. Gregory
The Pebble Cu-Au-Mo deposit in southwest Alaska is one of the world's largest porphyry deposits. The western part of the deposit was discovered by Cominco America in 1987, who sold the project to
Jan 1, 2012