Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Plant Testing Magnetic Conditioning On Kennecott’s Cu-mo Porphyry Ore - SME Annual Meeting 2023By F. Rudloff, C. Karageorgos, J. Moyo, I. Boadi, M. Struble, B. Lumsden
Over it’s more than 100-year history, the Kennecott operation has often been at the forefront of innovation; driven by the demands of the lower grade ore-body and the higher costs of operating in the
Feb 1, 2023
-
A Guide To Geochemical Field Sampling For Mineral AnalysisBy J. A. Madonna
Independent prospectors and small to large-scale exploration company personnel have requested, and are in need of, guidance in geochemical field sample collection methods which will provide the most r
Jan 1, 1999
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Rare Earth Element Concentrations in Product Streams of Coal Preparation Plants in the Eastern United StatesBy A. Bhagavatula, M. Rezaee, M. J. Kiser, R. Q. Honaker
"A field study of the coal preparation plant fleet in the eastern United States was undertaken to determine if quantify of rare earth elements (REEs) present in the product streams are large enough to
Jan 1, 2016
-
Determination of Incombustible Content with Portable Spectrometers Using Chemometric Modelling: Preliminary Results - SME Annual Meeting 2024By Amoussou Coffi Adoko, Shevaune Zeng, Sebastian D’Hyon, Gareth Kennedy, Eleonora Widzyk-Capehart
Inertization of coal dust with stone dust is a common control implemented within underground coal mines to mitigate the hazard of a coal dust explosion. To achieve adequate inertization, the total inc
Feb 1, 2024
-
Continuous Improvements In Mine Ventilation And Fire SimulationBy Rudolf E. Greuer
Modeling a mine ventilation system is a formidable mathematical problem requiring the solution of twice as many equations as there are airways with half of these being quadratic equations. The additio
Jan 1, 1994
-
Contractors' Experience With The Hydroshield Tunneling SystemBy Erich J. Jacob, Volker O. Meldner
INTRODUCTION Our company has made persistent efforts to utilize the very latest cost-saving technology in tunnel design and construction. However, we were relatively late in joining the clan of slu
Jan 1, 1979
-
Assessment of Progressive Failure of an Expanded Concrete Segmentally Lined Tube TunnelBy Andrew Thomson, Peter Wright
"A section of a London Underground expanded segmental lined tunnel constructed in the 1970’s progressively deteriorated after 2001, with extensive radial joint spalling and mid-segment cracking. As pa
Jan 1, 2016
-
Air Pollution Monitoring System At The Cheswick Plant Of Duquesne LightBy Leo R. Love
A comprehensive study of the environmental conditions of the area affected by the Colfax and Cheswick Power Stations is of extreme importance to Duquesne Light Company. The residents in the valley whe
Jan 1, 1972
-
Financing Options For Small Mines—what We Learned In Our Senior Design Project - SME Annual Meeting 2022By G. V. Campbell, O. T. Holdsworth, M. G. Nelson
A senior design project is required by all accredited mining engineering degree programs. Often referred to as the capstone of a student’s education, this project is expected to include all the import
Mar 2, 2022
-
Metal Deportment in Complex Secondary Raw Materials: The Case of Vanadium in Basic Oxygen Furnace Slags - Mining, Metallurgy & Exploration (2023)By M. Frenzel, D. Ebert, K. Bachmann, A. D. Renno, R. Möckel, J. Gutzmer, J. Krause
With the increasing demand for metalliferous and mineral raw materials and the consequent depletion of the global natural resource base, the possible utilization of secondary raw material sources is r
Oct 14, 2023
-
Initiation Of A Rock Mechanics Program At White Pine Copper Company ? IntroductionBy John Bley
White Pine Copper Company operates a mine in the Upper Peninsula of Michigan using a modified room-and-pillar system for extracting ore.1 Mine production averages 15, 500 tons per day. The terrain is
Jan 1, 1964
-
Disaster Averted After MTBM/Active Gas Main Collision - Utilizing Captivating Case Histories to Educate Stakeholders with Regards to Tunneling in Urban EnvironmentsBy Rory P. A. Ball, Mark Briggs, Martin Dix
"Tunnel professionals should inform project stakeholders on the reality that tunnel projects are not 100 percent devoid of the need for excavations or public inconveniences during both design and cons
Jan 1, 2016
-
Characterization And Treatment Of Selenium In Water Discharged From Surface Coal Mining Operations In West VirginiaBy T. Harrison
Surface coal mines in West Virginia are receiving stringent NPDES discharge limits for total recoverable selenium. With limits in the low parts-per-billion range, selection and implementation of prope
Jan 1, 2010
-
The Utilization Of On-Line Analyzers At The Blair Athol Coal Mine, Queensland, Australia (05e771d6-7429-4253-b84f-2b12f734c398)By G. France
The Blair Athol Coal Mine (BAC) is a large open cut operation in the Bowen Basin of Queensland, Australia. Current mine capacity is about 11 million tonnes per annum (Mtpa) of export coal. On-line a
Jan 1, 1999
-
Coal Cleaning Test Facility Research And Development At A Demonstration ScaleBy D. N. Trerice
The Electric Power Research Institute (EPRI) is sponsoring the construction and operation of a coal cleaning test facility at Homer City, Pennsylvania. The facility represents a major investment by th
Jan 1, 1981
-
Coleman Quartz Inc.: Novaculite For The Ferrosilicon IndustryBy F. Alsobrook
Coleman Quartz Inc. has a long history as the sole U.S. producer of lascas for the cultured quartz growing industry based on its unique deposits in Arkansas. Since 1989 the company has also been produ
Jan 1, 1992
-
Thermal oxidation of coal mine ventilation air methaneBy J. M. Somers
Methane is a powerful greenhouse gas and the principal component of natural gas. Coal seams often contain significant quantities of methane, and underground coal mines must ensure that methane release
Jan 1, 2009
-
Controlled Recirculation Investigation At Ruttan MineBy Allan E. Hall, Stephen G. Hardcastle, Lucien D. Nel, Jean-Paul Saindon
A description is given of the investigation conducted at Sherritt Gordon's Ruttan Operation in Manitoba during 1986. Gas and dust concentrations were measured in the exhaust air of the major work
Jan 1, 1987
-
Examining Pull-Out Tests for Grouted Rib Bolts: A Comprehensive Analysis - SME Annual Meeting 2024By Yuting Xue, Alper Kirmaci, Taghi Sherizadeh, Khaled Mohamed
Resin-grouted bolts serve as a crucial means of stabilizing yielded coal ribs in underground coal mines. A comprehensive investigation into their efficacy was undertaken by a collaborative effort betw
Feb 1, 2024