Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Calibrating Numerical Model For Room-And-Pillar Coal Mining Simulation In Weak Immediate Roof Based On In-Situ TestsBy Andre C. Zingano
It is a very difficult task to estimate the immediate roof and support behavior in a room-and-pillar mining section in the initial phase of the mining project. There is little information available at
Jan 1, 2009
-
SubLevel Stoping - Introduction to Sublevel StopingBy C. D. Mann
INTRODUCTION The sublevel stoping mining method is usually applied to a relatively steeply dipping, competent ore body, surrounded by competent wall rock. Ore is produced by drilling and blasting
Jan 1, 1982
-
Geotechnical Factors in Undercut-Cave MiningBy Louis A. Panek
INTRODUCTION Block caving is distinguished from other types of mining in its requirements that the mineral body to be extracted must cave after a relatively large tabular open¬ing is created undernea
Jan 1, 1982
-
Flowing Film ConcentratorsBy F. B. Micheli
Introduction and Historical Background Although both sluices and devices using a simple flowing film are among the oldest known methods of concentration, they are still extensively employed in a vari
Jan 1, 1985
-
Ways To Increase The Efficiency Of Planning Of An Open-Pit Ore Stream Under Selective ExtractionBy S. Z. Galiyev
In this paper the basic approach to the present planning and quality management of open-pit ore streams is presented. This is accomplished within the framework of a unified system of information manag
Jan 1, 2003
-
Applications of Computer-Based 3D-Visualization in Quarry PlanningBy Michael Honerkamp, Clemens Mann
A quarry is not a static, but a dynamic structure that greatly affects the appearance of the surrounding area. Excellent planning is required today to cope with this continual change. In this paper se
Jan 1, 1996
-
Tower mill and its application to fine grindingBy W. A. Lawruk, L. J. Wilson, D. E. Stief
The Tower mill is a vertical stirred mill using steel balls or pebble grinding media. This device is designed for fine grinding at significant power savings when compared to conventional tumbling mill
Jan 1, 1988
-
Leaching Of SulfidesBy Fathi Habashi
A LARGE number of metals are found in nature, in rich deposits, in the form of sulfides as shown in Table 4.1. Treatment of sulfide ores is done mostly by pyrometallurgical operations; it is only rece
Jan 1, 1970
-
Depths To Which OSHA GoesBy S. O. Warren
From the contractor's viewpoint, suggesting what is now a theoretical industrial approach to safety and a proposal for realistic reformation to accomplish the intended goals, is the tri-parte adv
Jan 1, 1979
-
Mechanization In Lateral DevelopmentBy John R. Wright
This paper reviews the increased use of mechanization in order to develop lateral headings efficiently and economically. Particular emphasis is placed on the role of the Electric-Hydraulic Drill Jumbo
Jan 1, 1981
-
Compressed Air Injection Into A Sulfide Leach DumpBy Robert P. Moodry
It was attempted to revitalize an old sulfide leach dump by increasing the oxygen content within the dump. Compressed air was introduced into the old dump. This was accomplished by drilling 300 foot a
Jan 1, 1976
-
Contract Mining Improves Performance: The Australian ExperienceBy T. S. Golosinski
This article reviews current contract mining practices in Australia. Various types of contracts are reviewed, including partnering arrangements and alliances between the contractor and the mine owner.
Jan 1, 1998
-
Monitoring Of Bolt Axial Loads In Underground MinesBy H. Mitri
A new monitoring device called SAFEBOLT (Stress And Force Evaluator in BOLTs) has been recently developed at McGill University. The device is essentially an alternative to the load cell, it permits th
Jan 1, 2002
-
South Arturo, NevadaBy R. Hipsley, D. Arbonies, P. Dobak
South Arturo is a “Carlin-type”, breccia-hosted, oxide gold deposit located at the north end of the Carlin Trend. The discovery hole was drilled in July 2005 from mine dumps 1,000 feet south of the D
Jan 1, 2007
-
Tunneling Through Mountain FaultsBy Don W. Deere
Faults under high rock cover represent some of the most severe ground conditions a Tunneler can encounter. High ground water pressures and flows are usually associated with mountain faults. Ground beh
Jan 1, 2007
-
Enhancement Of Bacterial Iron And Sulfate Respiration For In Situ Bioremediation Of Acid Mine Drainage Sites: A Case Study (9e023564-700d-405d-941a-989b38ed4fb9)By A. A. Bilgin
The prevention of acid mine drainage (AMD) in situ is more attractive than down-gradient treatment alternatives that do not involve source control. AMD source control can be achieved by shifting the m
Jan 1, 2007
-
Estimation Of Capital And Operation Costs Of Backhoe LoadersBy B. Oraee
Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are
Jan 1, 2011
-
Internal rate of return (IRR) - a flawed and dysfunctional project-evaluation criterionBy M. M. Hajdasinski
For decades, the internal rate of return (IRR) project-evaluation criterion has been under increasing criticism. Torries (1998a) defends the beleaguered criterion. He claims that, as a project-evaluat
Jan 1, 2000
-
Valuation And Canadian Reporting Standards - Problems And SolutionsBy R. Lawrence
Mineral property valuations to be used for Canadian securities regulatory purposes must comply with CIMVal1. The technical basis for a CIMVal report is the same as that required for a technical repor
Jan 1, 2011
-
Polymeric Agglomerating Agents for the Gold Mining IndustryBy J. J. Robertson, D. M. Polizzotti
Cement is used as an established agglomerating agent in gold heap leaching operations to maintain heap permeability and prevent migration of fines. In addition to agglomeration, cement provides protec
Jan 1, 1992