Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Application Of Propeller Fans At Wisconsin Industrial Sand—A Case Study

    By T. Stauffer, B. McGunegle, A. Adu-Acheampong

    The Fairmount Minerals, Inc., Maiden Rock underground sand mine historically delivered air to ventilate diesel-powered equipment at its working faces through high-resistance, 15-inch-diameter PVC dist

    Jan 1, 2007

  • SME
    Public-Private Partnerships: An Efficient And Effective Means To Restore Abandoned Minelands In Western Pennsylvania

    By M. H. Dunn, T. P. Danehy, C. F. Denholm, S. L. Busler

    The problems associated with abandoned minelands are so extensive that neither federal, state, or local governments nor the mining industry nor watershed groups can adequately address these problems i

    Jan 1, 2002

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Case Study Failure Of Shallow Open Pit Slopes Shirley Basin Mine

    By R. M. Owens, J. F. Lupo

    The Shirley Basin Uranium mine, located in southeastern Wyoming, USA, was an open pit mining operation consisting of a series of several open pit mines excavated into poorly consolidated sandstones, s

    Jan 1, 2001

  • SME
    Ventilation monitoring and control in mines

    By MAHESH SHRIWAS, CHRISTOPHER PRITCHARD

    Ventilation monitoring and control in mines are becoming an integral part of day-to-day activity for maintaining the health and safety of miners. This paper evaluates potential real-time monitoring so

  • SME
    Successful Cost Reductions At The Henderson Mill

    By Kevin Hegerle

    The Henderson Mill has operated over a wide range of production rates, feed grades, manpower levels and recovery targets since start-up in 1976. Henderson Mill personnel, both management and hourly, h

    Jan 1, 1986

  • SME
    New XRF Analyzer For Elemental Analysis Of Sample Streams

    By C. Bachmann, M. J. Laurila, A. J. Widenman, A. Klein

    Elemental analysis of slurry streams using X-ray fluorescence (XRF) has long been employed. However, detector technology has limited the application of XRF devices. Using detector technology employed

    Jan 1, 1999

  • SME
    Molybdenum Flotation Practice - Cell Type Selection And Design Considerations

    Several of the larger copper projects recently built have included a molybdenum byproduct circuit as part of the overall project due to the favorable molybdenum market conditions and overall economic

    Feb 27, 2013

  • SME
    Water Stored In Abandoned Mines As A Mineral Resource

    By Reynold Q. Shotts

    Underground mines, penetrating well below the water table, quickly fill with water when abandoned. Ordinarily, these natural cisterns are not thought of as sources of industrial water. Under special c

    Jan 1, 1973

  • SME
    Mineral Resources and Land Use Planning Conflicts in Norway

    By K. Nielsen

    The paper presents a brief overview of the mineral industry in Norway, followed by a description of the mineral policy and relevant legislation including the roles of the Norwegian Directorate of Mini

    Jan 1, 2005

  • SME
    Geostatistical Assessment And Quantification Of Uncertainity Of Methane In The Caved And Fractured Zone Of Longwall Mines

    By C. Özgen Karacan

    The formation of the gas emission zone in longwall mining and the potential amount of gas in this zone are factors of local geology and spatial variability within this geology. Therefore, geostatistic

    Jan 1, 2012

  • SME
    Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240

    By Keith Jones, Michael Francis

    Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an

    Jan 1, 2005

  • SME
    Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels

    By Christophe Bragard

    The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project

    Jan 1, 2008

  • SME
    Hydro-Jex© Operations At Anglogold Ashanti?s Cripple Creek & Victor Gold Mine

    By T. Seal

    Hydro-Jex© releaching was undertaken during the summer of 2010 at the Valley Leach Facility (VLF) at AngloGold Ashanti?s Cripple Creek & Victor Gold Mine. Several advancements to the technique were m

    Jan 1, 2011

  • SME
    Underground Coal Mine Subsidence Impacts on Surface Water

    By Donald E. Stump

    Subsidence from underground coal mining alters surface water discharge and availability. The magnitude and areal extent of these impacts are dependent on many factors, including the amount of subsiden

    Jan 1, 1986

  • SME
    Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India

    By Alok Garg, Rajeev Kumar Dayal

    The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric

    Jan 1, 2001

  • SME
    Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station Project

    By James McNally, Adam Stremcha, John MacGregor

    With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i

    Jan 1, 2007

  • SME
    Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground

    By Joseph M. McCann

    The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio

  • SME
    Reducing The Fire Hazard Of Mine Conveyor Belts

    By Harry C. Verakis

    A conveyor belt fire presents a serious safety hazard in an underground coal mine. A review of underground coal mine fires involving conveyor belts which occurred within the past two decades was made

    Jan 1, 1991

  • SME
    The Big Walnut—A Planned Approach

    By Tom Szaraz, Steve Skelhorn

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through

    Jan 1, 2007