Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Assessment Of Parameters Influence The Extraction Method Selection For The Dimension Stone QuarriesBy E. Bakhtavar
All parameters influencing the decision for selection of a suitable extraction method were first selected as the base of this study. Then these parameters were categorized in two main groups. The firs
Jan 1, 2012
-
The Lake Mead Intake 3 Water Tunnel and Pumping Station, Las Vegas, Nevada, USABy Michael Feroz, Marcus Jensen, James E. Lindell
The Southern Nevada Water Authority (SNWA) operates two water-intakes in Lake Mead, located 20 miles east of Las Vegas, Nevada. Severe drought has caused decline in lake level by 85 feet since 2000 an
Jan 1, 2007
-
Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, ArizonaBy William D. Leech, Ronald E. Romley, Gary N. Sheppard
The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The
Jan 1, 1991
-
Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady
Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp
-
Groundwater Control for Sydney TunnelsBy Paul Hewitt, Tim Smirnoff
Design and construction of the Epping to Chatswood Rail Line tunnels in Sydney, Australia required an innovative approach to define hydrogeological properties of the Sydney Hawkesbury Sandstone and pr
Jan 1, 2005
-
Final Tunnel Liner at Mill Creek 3 Project - Case StudyBy M. Schafer
The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac
Jan 1, 2008
-
The Application Of Geotechnical Monitoring To Stability Evaluation And Mine DesignBy H. Maleki
In this paper, long-term measurements in five underground mines are presented to demonstrate how these measurements can be applied to stability evaluations and design of underground excavations. These
Jan 1, 2002
-
Dry Coal Cleaning With A Magmill™By R. R. Oder, R. E. Jamison, E. D. Brandner
This paper presents preliminary test results obtained with a 0.38 kg/s (3000 lb-hr) beta prototype MagMill™. In processing Upper Freeport coal the beta prototype recovered 82% of the weight of the fee
Jan 1, 2000
-
Gas Mitigation In The Mill Creek TunnelBy R. Switalski, M. Schafer, R. Pintabona, M. Kritzer, B. Lukajic, S. Janosko
Methane gas caused an eight-month shutdown of mining operations at the Mill Creek, Phase 3, Tunnel. The gas-related shutdown occurred as the tunnel was advanced to an approximate distance of 2,700 fee
Jan 1, 2007
-
Shutdown and restart at Pinto Valley - a maintenance viewpointBy Robert S. Shank
Introduction The Pinto Valley open-pit copper mine is located in southern Arizona, 11 km (7 miles) west of Miami. Production at Pinto Valley began in 1974. About 350 Mt (386 million st) of ore and wa
Jan 4, 1985
-
Rock Load Estimation For Tunnels In Squeezing Ground ConditionsBy Bhawani Singh, A. K. Dube, B. Singh
At least three hydroelectric tunnels constructed during the last decade through the lower Himalayan region in India have met with serious problems of supporting in squeezing ground conditions. Steel r
Jan 1, 1981
-
Connection of TARP Tunnel to Thornton Quarry ReservoirBy Djavid Mohammad
Over the next several years, the storage capacity of the Metropolitan Water Reclamation District of Greater Chicago?s Tunnel and Reservoir Plan will be increased by 14.8 billion gallons through the ad
Jan 1, 2008
-
Liebherr?s T282 B trucks operating in BrazilIn September, a fleet of 363-t (400-st) Liebherr trucks became operational in Brazil and have already begun moving iron ore in Para state. Prior to the arrival of the the trucks the Brazilian fleet
Jan 1, 2010
-
Analysis Of Us Small-Mine Compliance Feasibility With Proposed New Respirable Dust Standards And Implications For Better Dust Control MethodsBy R. L. Grayson
In 2010, MSHA began holding hearings on a new coal mine respirable dust rule, which proposes a 1.0 mg/m3 standard, a separate 0.1 mg/m3 quartz standard, and the use of single-shift samples for complia
Jan 1, 2012
-
Recreating a Headwater Stream System on a Head-of-Hollow FillBy C. T. Agouridis
Head-of-hollow fills or valley fills have gained national attention due to increasing environmental concerns, particularly with regards to headwater stream loss. Researchers at the University of Kent
Jan 1, 2008
-
A Dynamic Systems Modeling Approach To Evaluating Backfill DesignsBy M. Wickham
Design of an open pit backfill requires an understanding of highly varied processes including slope stability, hydrogeology, pit lake chemistry, climate, runoff, and mine waste behavior. Dynamic syst
Jan 1, 2001
-
Aynak: A World-Class Sediment-Hosted Copper Deposit, AfghanistanBy S. Coats, G. Norton, A. Benham, P. Ková
The Aynak copper deposit, located 30 km south of Kabul in Afghanistan (Figure 1), was discovered by Soviet geologists in the 1970s. Extensive exploration undertaken in the area between 1974-80 include
Jan 1, 2007
-
Self-Cleaning Fluidized Bed Slurry Heat Exchangers: A Breakthrough In The Hydrometallurgy For The Processing Of Laterite Nickel And Cobalt In High-Pressure-Acid-Leach (HPAL) PlantsBy D. G. Klaren
Self-cleaning fluidized bed heat exchangers are conquering the world for reason that they are able to solve any severe fouling problem in indirect heat transfer due to the circulation of cleaning part
Jan 1, 2002
-
Ilmenite smelter freeze lining monitoring by thermocouple measurements: Model resultsBy J. H. Zietsman
Ilmenite smelting furnaces must be operated with a freeze lining of frozen slag to protect sidewall refractories from chemical attack by liquid slag. The process has two main control objectives: First
Jan 1, 2005
-
Corporate social responsibility within the mining industry: case studies from across Europe and RussiaBy E. A. Adey, C. Baciu, P. Whitbread-Abrutat, M. Varul, T. Ejdemo, R. K. Shail, F. Wall
Responsible mining requires stakeholder engagement throughout all operational stages and after mine closure. By assessing the current and anticipated future socio-economic and environmental impacts, a
Jan 1, 2011