Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Kennecott's Copperton Concentrator Fourth Line Expansion, Plant Performance to Date., and Ongoing Continuous Improvement Projects

    By D. S. Bird

    The Kennecott Utah Copper Modernization Project, initiated in 1986, was directed to provide an expansion and modernization of mining and process facilities at the property's Bingham Canyon Mine a

    Jan 1, 1995

  • SME
    The Effect Of End Constraint On The Compressive Strength Of Model Rock Pillars

    By Clarence O. Babcock

    Model pillars of limestone, marble, sandstone, and granite, with length-to-diameter ratios of 3, 2, 1, 0.5, and 0.25 (0.286 for granite), were broken in axial compression to determine to what extent a

    Jan 1, 1969

  • SME
    AMAX Process Evaluation Executive (Apex): A General Purpose Simulator For Computing Steady State Material And Energy Balances Of Metallurgical Process Flowsheets

    By Vishnu S. Gupta

    A modular computer program APEX (AMAX Process Evaluation Executive), has been developed at AMAX Extractive R&D, Golden, Colorado to facilitate rapid simulation of steady state material and energy bala

    Jan 1, 1980

  • SME
    Domestic Utilization Of High Sulfur Coals: Trends And Prospects ? Introduction

    By Subhash Bhagwat

    The definition of high sulfur coal varies from plant to plant and is subject to changes over time as the environmental regulations change. In plants constructed after September 1978 hardly any domesti

    Jan 1, 1986

  • SME
    Oil Mining : An Emerging Technology

    By John S. Hutchins, David L. Wassum

    Mining engineers are ready to take a big step into a new field-oil mining. To understand the subject, one must look at the world's oil supply and demand as well as petroleum technology successes

    Jan 12, 1981

  • SME
    Hydrothermal Synthesis Of Aluminum Substituted Tobermorite From Perlite Wastes

    By I. Douni

    The aim of this study is to synthesize hydrated compounds of calcium silicate (tobermorite) using as siliceous source perlite milling process wastes, containing more than 70% of SiO2. Calcium silicate

    Jan 1, 2006

  • SME
    Recovery Of Pyrites From Coal Refuse -- A Pilot Plant Study

    By Harold L. Lovell

    The current interest in sulfur recovery from coal measures is indicated by a recent report prepared for the Public Health Service (1) It was noted that the concentration of pyrites to a product contai

    Jan 1, 1967

  • SME
    Application of Rock Mass Quality Rating (RMQR) to Design of Support Systems for Tunnels and Underground Caverns

    By M. Imazu, Ö. Aydan

    "A new rock classification, Rock Mass Quality Rating (RMQR) proposed by the authors is briefly explained and its application for the design of tunnels and large underground openings support systems is

    Jan 1, 2016

  • SME
    I Start As Mine Consultant

    It took me nearly nine months to make the move from Arizona to Berkeley, opening an office and planning our new home. While I was in Warren Dorothy had rented two rooms for my office In the new Califo

    Jan 1, 1976

  • SME
    Hydrologic Variations Due to Longwall Mining

    By R. J. Matetic

    The impact of longwall mining on the local hydrological regime has become an important environmental focal point. Unfortunately, only a few studies have addressed the timing and range of well fluid le

    Jan 1, 1986

  • SME
    Optimising The Ammonia-cyanide Leaching Process For Copper-gold Ores

    By David Muir, Slobodanka Vukcevic

    Gold is commonly associated with copper minerals, particu­larly in the more geologically recent rocks of Northern Australia, Chile and the Pacific Rim. Traditionally, oxidised copper-gold ores are sel

    Jan 1, 1995

  • SME
    Applied drilling and blasting techniquesfor blast casting at Trapper mine – Potential to save on overburden removal

    By Paul D. Dupree

    Introduction Trapper mine is a dip-line strip coal mine, located about 10 km (6 miles) southwest of Craig, CO. The mine provides the Craig Generating Station, operated by Colorado-Ute, with about

    Jan 1, 1987

  • SME
    Human Relations (ea617e00-6e52-492f-b135-9ba8a7fafbe4)

    By J. Wes Blakely

    In the mid-1950s the importation of foreign oil began to encroach on traditional coal markets such as railroad steam engine fuel, home heating, electrical generating plants, and others. Many of the sm

    Jan 1, 1981

  • SME
    Updating The Los Pelambres Overland Conveyor System

    By Linda Frederick

    In July 1997, Krupp Canada obtained the contract to design and supply the conveyor system for Chile's Los Pelambres copper mine expansion project. Progress on the overland conveyor system is curr

    Jan 1, 1999

  • SME
    Ventilation - as - Required, a New Monitoring System for the Swedish Mines

    By Carl-Eric Dr. Nilsson

    Energy cost for mine ventilation in Sweden is high, especially during winter time when air must be heated. This paper presents the result from a project entitled ventilation-as-required. The term v

    Jan 1, 1995

  • SME
    Backfill No Top Access Narrow Vein Cut And Fill Stope At Hollister Mine ? Introduction

    Stope width was controlled around 3.5 feet for the narrow high grade vein system at Hollister Gold Mine. Without top access, backfill material was pumped from bottom access up into stope through a ser

    Jan 1, 2011

  • SME
    Managing Environmental And Economic Risk For Engineered Systems

    By William S. Eaton

    Managing a mine or mineral processing operation in today's environment presents many unique challenges to mining companies. In recent years, headlines around the world have publicized major in

    Jan 1, 1997

  • SME
    The Soldier Digs Through History

    By Finn E. Bronner

    HISTORICAL PERSPECTIVE "Blessed be the Lord my strength, which teacheth my hands to war and my fingers to fight." Thus sang David three thousand years ago, in tacit acceptance of the condition of w

    Jan 1, 1979

  • SME
    Quality Management System on Sound Transit Underground Construction Projects

    By Jim Salley, Mohammad Saleem, Indra Banerjee, Kevin Sapp

    "On underground construction projects, effective Quality Management is essential for ensuring facility durability, life cycle performance and low maintainability. Furthermore, follow on contracts also

    Jan 1, 2016

  • SME
    Open Pit Mine Scheduling Based On Fundamental Tree Algorithm

    By Kadri Dagdelen, Thys B. Johnson, Salih Ramazan

    Long-term production scheduling design is a very important part of mining because it determines the economic outcome of a project There have been many attempts to solve the optimum pit scheduling prob

    Jan 1, 2002