Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Slurry System Head Curves For Multiple PumpsBy G. Heinrichs
This paper is intended to provide information for one to be able to determine the slurry system head curve for pump applications. The slurry characteristics are the basis for what the size, material o
Jan 1, 1996
-
It?s Not Just Trucks And Shovels: Mineral Processing Equipment Will Be On Hand, TooThe past four years since the 2008 MINExpo have been a roller coaster ride for the mining industry, with highs and lows and everything in between. One of the natural consequences of this uncertainty h
Jan 1, 2012
-
Direct Cyanidation and Roasting Combination of a Semi-Refractory Massive Sulfide OreBy P. Karimi, A. Akcil, A. Amini, H. Abdollahi
"In this study, cyanidation experiments were carried out on a massive sulfide ore sample, whose grades of the precious metals gold and silver were found to be 4.2 g/t and 311.9 g/t, respectively. Othe
Jan 1, 2015
-
Crisis Management: What To Do If Disaster StrikesBy Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich
The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later
Jan 1, 2004
-
Mineral Processing's Needs - Evolution or Revolution Changing Status of Domestic MiningBy Nathaniel Arbiter, Robert R. Beebe
The U.S. mining industry - once world dominant and largely independent of foreign sources for most major commodities - has today lost this position, with little likelihood of regaining it. But even th
Jan 1, 1989
-
Office Of Coal Research Status ReportBy Neal P. Cochran
It is always a pleasure for me to address a group of mining engineers. I am doubly grateful when I am allotted sufficient time to describe the total Office of Coal Research program. My remarks are dir
Jan 1, 1970
-
Integration Of Geophysical And Drilling Data To Map A Proposed Uranium Mill Tailings SiteBy R. W. Lankston
Uranium mill tailings disposal facilities present unique problems with respect to siting, design, and long-term stability because their contents remain potentially hazardous for 100,000 years. Dawn Mi
Jan 1, 1980
-
Pit optimization on clustered realizations: Identifying functional scenariosBy Tyler Acorn, Brandon Wilson, Jeff Boisvert
Project-scale decisions in surface mining operations rely on the optimization and subsequent evaluation of pit limits. This process ignores the ability for mine plans to adapt as more information is g
-
Riyadh Metro TBM Construction and Knowledge TransferBy Henning Schwarz, Ade Ogunsola, Anas Almousa
"The Riyadh Metro, commissioned by Arriyadh Development Authority “ADA” - the executive arm of The High Commission for the Development of Arriyadh -, forms part of a new public transport-system of Sau
Jan 1, 2016
-
A New Sand And Gravel Deposit: From Perception To Production ? IntroductionBy H. L. Bourne
This paper describes six basic stages between perception and production for a new sand and gravel deposit. Sand and gravel, like many of our natural resources, is taken for granted. It is assumed by J
Jan 1, 1970
-
Experience With Georgia's Mined Land Reclamation Law - Inception Of The IdeaBy Jesse H. Auvil
In January of 1966, during the annual session of Georgia's General Assembly, Representative Paul E. Nessmith of Statesboro, Georgia, walked into my office and asked me what I thought of the advis
Jan 1, 1970
-
A Quick Evaluation Tool For Capex And Opex Applied To Mining Operations And Esg Mitigation - SME Annual Meeting 2022By T. Fernandez, V. Juchen, C. Petter, F. Cantini, V. Lenz, V. I. Araújo, R. Petter, R. Darrigo, A. Young, I. G. da Costa, J. Oppermann
There are many methods to estimate costs quickly. One of these is the Parametric Method, where costs are estimated from general algorithms (or curves). Derived from an original tool based on the O’Har
Mar 2, 2022
-
Open Pit Production Planning Through Pit-Generation And Pit-Sequencing (9f1bec4e-18ef-4677-bf91-9c98a79e9b13)In this paper, the logic and the capabilities of a long term production planning method for open pit mining are presented. The method is the first attempt in obtaining simultaneous solutions to the fo
Jan 1, 1993
-
An Improved Environment Through Intelligent Mined-Land Reclamation ? IntroductionBy Thomas A. Gwynn
"A beautiful America will require the effort of government at every level, of business, and of private groups. Above all it will require the concern and action of individual citizens, alert to danger,
Jan 1, 1969
-
Cost value of High-angle conveying – 2011By Joseph A. Dos Santos
"The subject of this writing was first published in 1998 with the emphasis on the hardware cost comparison. Other costs, such as the required land area and spatial volume, were mentioned but not empha
Sep 1, 2016
-
Body of Knowledge for Mining Safety and Health ManagementBy M. Brnich, S. Kramer, B. McNamara, T. Hethmon, M. Pedersen-Howard, S. Rajapaske, D. Lingenfelder, B. Huber, D. Hebig
"The development of mining safety and health management as a recognized profession has been long in coming. Over the last 150 years, the mining industry has evolved from having individuals randomly in
Jan 6, 2018
-
Reducing Emissions Of Air Toxics: Evaluating The Potential For Removing Trace Elements From Powder River Basin Sub-bituminous CoalsBy Jr. Raleigh
As part vi the development of the Coal Quality Expert (CQRN) --a computer program capable of predicting the impacts of coal quality on power plant performance, costs, and emissions control--several na
Jan 1, 1993
-
Getty Mining Company's Approach To Heap Leaching At The Mercur MineBy Kendall Y. Keuhey
The Mercur Mine, developed and operated by Getty Mining Company, is designed to process 3,000 tons/day of gold ore from the historical Mercur Hill mining district. The mill process involves crushing,
Jan 1, 1983
-
The allocation of differing site condition riskBy Zachary D. Jones
"Construction projects involve a great many risks. The risk that material prices will increase during construction or that the work under construction will be destroyed by fire, storm or some other ac
Jan 1, 2014
-
Metallurgy, Process Control and Mineralogy Integration at the Kittila Mine, FinlandBy R. Thorpe, M. Dosbaba, A. Kopriva, A. Niiranen, J. Ruokanen
"Automated Mineralogy (AM) is an important diagnostic tool in flotation plants as it adds ore and particle mineralogical properties to traditional mass and chemical data. AM is used in project develop
Jan 1, 2017